Refine
Document Type
- Conference Proceeding (123)
- Article (66)
- Doctoral Thesis (25)
- Master's Thesis (5)
- Diploma Thesis (1)
Institute
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Institut für Strukturmechanik (ISM) (1)
- Junior-Professur Computational Architecture (1)
- Junior-Professur Europäische Medienkultur (1)
- Professur Angewandte Mathematik (1)
- Professur Aufbereitung von Baustoffen und Wiederverwertung (1)
- Professur Bauaufnahme und Baudenkmalpflege (1)
- Professur Bauchemie und Polymere Werkstoffe (1)
- Professur Bauformenlehre (1)
- Professur Bauphysik (1)
- Professur Baustatik und Bauteilfestigkeit (1)
- Professur Bodenmechanik (1)
- Professur Darstellungsmethodik (1)
- Professur Entwerfen und Industriebau (1)
- Professur Entwerfen und ländliches Bauen (1)
- Professur Planung von Ingenieurbauten (1)
- Professur Raumplanung und Raumforschung (1)
- Professur Stahlbau (1)
- Professur Verkehrsplanung und Verkehrstechnik (1)
- Professur Wasserbau (1)
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (220) (remove)
This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference.