• Treffer 3 von 8
Zurück zur Trefferliste

Progress Measurement in Planning Processes on the Base of Process Models

  • This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guaranteeThis paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.zeige mehrzeige weniger

Volltext Dateien herunterladen

Metadaten exportieren

Weitere Dienste

Teilen auf Twitter Suche bei Google Scholar
Metadaten
Dokumentart:Konferenzveröffentlichung
Verfasserangaben: Wolfgang Huhnt
DOI (Zitierlink):https://doi.org/10.25643/bauhaus-universitaet.166Zitierlink
URN (Zitierlink):https://nbn-resolving.org/urn:nbn:de:gbv:wim2-20111215-1664Zitierlink
Sprache:Englisch
Datum der Veröffentlichung (online):03.11.2004
Jahr der Erstveröffentlichung:2004
Datum der Freischaltung:03.11.2004
Institute und Partnereinrichtugen:Fakultät Bauingenieurwesen / Professur Informatik im Bauwesen
GND-Schlagwort:Baubetrieb; Computerunterstütztes Verfahren; Prozessmodell; Bauablauf
Quelle:International Conference on Computing in Civil and Building Engineering , ICCCBE , 10 , 2004.06.02-04 , Weimar , Bauhaus-Universität
DDC-Klassifikation:600 Technik, Medizin, angewandte Wissenschaften / 620 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
BKL-Klassifikation:54 Informatik / 54.89 Angewandte Informatik: Sonstiges
56 Bauwesen / 56.03 Methoden im Bauingenieurwesen
Sammlungen:Bauhaus-Universität Weimar / International Conference on Computing in Civil and Building Engineering, ICCCBE, Weimar / International Conference on Computing in Civil and Building Engineering, ICCCBE, Weimar 10. 2004
Lizenz (Deutsch):License Logo In Copyright