• search hit 1 of 1
Back to Result List

Data acquisition, processing and management systems for a Canadian bridge monitoring project

  • This paper will present a number of technical aspects for one of the most elaborate instrumentation and data acquisition projects ever undertaken in Canada. Confederation Bridge, the longest bridge built over ice covered seawater has been equipped with the state of the art data acquistition devices and systems as well as data transfer networks. The Bridge has been providing a fixed surfaceThis paper will present a number of technical aspects for one of the most elaborate instrumentation and data acquisition projects ever undertaken in Canada. Confederation Bridge, the longest bridge built over ice covered seawater has been equipped with the state of the art data acquistition devices and systems as well as data transfer networks. The Bridge has been providing a fixed surface connection between Prince Edward Island and Province of New Brunswick in Canada since its opening in 1997. The Bridge has a rather long design service life of 100 years. Because of its large size and long span length, its design is not covered by any existing codes or standards worldwide. The focus of the paper is to introduce the data acquisition, transfer, processing and management systems. The instrumentation and communications infrastructure and devices will be presented in some details along with the data processing and management systems and techniques. Teams of engineers and researchers use the collected data to verify the analysis and design assumptions and parameters as well as investigate the short-term and long-term behaviour and health of the Bridge. The collected data are also used in furthering research activities in the field of bridge engineering and in elevating our knowledge about behaviour, reliability and durability of such complex structures, their components and materials.show moreshow less

Download full text files

Export metadata

Additional Services

Share in Twitter Search Google Scholar
Metadaten
Document Type:Conference Proceeding
Author: Moe M. S. Cheung, Bahman Noruziaan, W. C. Li
DOI (Cite-Link):https://doi.org/10.25643/bauhaus-universitaet.123Cite-Link
URN (Cite-Link):https://nbn-resolving.org/urn:nbn:de:gbv:wim2-20111215-1235Cite-Link
Language:English
Date of Publication (online):2004/10/25
Year of first Publication:2004
Release Date:2004/10/25
Institutes and partner institutions:Fakultät Bauingenieurwesen / Professur Informatik im Bauwesen
GND Keyword:Bauwerk; Datenmanagement; Brückenbau
Dewey Decimal Classification:600 Technik, Medizin, angewandte Wissenschaften / 620 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
BKL-Classification:54 Informatik / 54.89 Angewandte Informatik: Sonstiges
56 Bauwesen / 56.03 Methoden im Bauingenieurwesen
Collections:Bauhaus-Universität Weimar / International Conference on Computing in Civil and Building Engineering, ICCCBE, Weimar / International Conference on Computing in Civil and Building Engineering, ICCCBE, Weimar 10. 2004
Licence (German):License Logo In Copyright