TY - CHAP A1 - Kang, Julian A1 - Lho, Byeong-Cheol A1 - Kim, Jeong-Hoon T1 - XML-based Vector Graphics: Application for Web-based Design Automation N2 - Most retaining walls and box culverts built for arterial road construction are simple, and the design process of these structures is often repetitive and labor-intensive because they are so similar in structural configuration. Although some integrated design automation systems developed for retaining walls and box culverts have expedited the design process of these structures, the process of collecting and distributing the resultant engineering documents has not been fully integrated with the computer applications. We have been developing a Web-based design automation system to manage the resultant documents as well as to speed up the repetitive design process. Manipulation of engineering drawings in the Web page is one of the critical functions needed for Web-based design automation. eXtensible Markup Language (XML) and XML-based vector graphics are expected to facilitate the representation of engineering drawings in the Web page. In this paper, we present how we used XML and Scalable Vector Graphics (SVG) to compose engineering drawings and represent them in the Web page. XML Data Island we designed to define drawing components turned out effective in manipulating the engineering drawings in the Web page. KW - Architektur KW - Verteiltes System KW - XML Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1872 ER - TY - JOUR A1 - Cerovsek, Tomo A1 - Turk, Ziga T1 - Working Together: ICT Infrastructures to Support Collaboration N2 - The paper summarizes a part of research carried out in ICCI project and provides a current review of ICT infrastructures supporting collaboration. It covers taxonomies, protocols, standards, components, typical subsystems as well as future trends and recommendation for two most important technologies with applications in AEC: (1) EIP (Enterprise information portal) – a single gateway to a company's information, knowledge base, and applications for all actors; (2) RTC (Real-Time Communication and Collaboration technologies) that provide means for asynchronous communication between geographically dislocated people using ICT. Proposed future developments are: orientation towards web services - with building information models, business intelligence, personalization, AEC information retrieval, p2p workspaces and grids. KW - Informationstechnik KW - Forschung KW - Europa KW - Teamwork Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2055 ER - TY - CHAP A1 - Molkenthin, Frank T1 - Web-based Information Systems: Data Monitoring, Analysis and Reporting for Measurements and Simulations N2 - This paper describes the concept, implementation and application of the Web-based Information System ‘Turtle’ for data monitoring, analysis, reporting and management in engineering projects. The system uses a generalised object-oriented approach for information modelling of physical state variables from measurements and simulations by sets of tensor objects and is implemented platform-independently as a Web application. This leads to a more flexible handling of measurement and simulation information in distributed and interdisciplinary engineering projects based on the concept of information sharing. The potential and advantages of Web-based information systems like ‘Turtle’ are described for one selected application example: a measurement programme dealing with the physical limnology of Lake Constance. KW - Mobile Computing KW - Funknetz KW - Informationssystem KW - World Wide Web Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1184 ER - TY - CHAP A1 - Molkenthin, Frank T1 - Web-based Collaborative Engineering based on Information Sharing - HydroWeb: An Education Experiment in the Internet N2 - This paper describes the concept and experiences of the international Open Distance Learning Course ‘HydroWeb’. This course deals with the introduction of Web-based Collaborative Engineering in standard education programmes of water related engineering and civil engineering based on information sharing. Organized under the umbrella of IAHR and ETNET21 this course is collaboration from several universities from all over the world. Started in 1999 the course demonstrates the potential and innovative opportunities of Web-Technology in education, research and engineering: Students from the different partner universities form small distributed teams to solve a given engineering problem in a time window of two weeks. To overcome the spatial distribution the students apply modern Web technology such as video conferencing, application sharing and document management. All results as well as the final reports are presented as Web document on a shared Web-based project platform (http://www.hydro-web.org). Besides the experiences to apply standard Web tools and working methods based on information sharing instead the conventional information exchange in the daily engineering work the students improve their soft skills operate successfully in international and interdisciplinary project environments as part of the ‘Technical Culture’ of nowadays. KW - Architektur KW - Verteiltes System KW - Informationsaustausch KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1869 ER - TY - CHAP A1 - Miles, John A1 - Taylor, Mark A1 - Anumba, Chimay T1 - VRML Virtual Worlds - An Alternative to the Desktop Metaphor for GUI's? N2 - Metaphors are commonly used by software developers in the creation of GUI's. This paper looks at the use of multi-user VRML to create virtual metaphors, developing a conceptual design tool that can be used intuitively with little or no training. KW - Architektur KW - Verteiltes System KW - Graphische Benutzeroberfläche KW - VRML Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1855 ER - TY - JOUR A1 - Kaapke, Kai A1 - Milbradt, Peter T1 - Voronoi-based finite volume method for transport problems N2 - Transport problems, as, for instance, the transport of sediment in hydraulic engineering and the transport of harmful substances through porous media, play an important role in many fields of civil engineering. Other examples include the dissipation of heat or sound as well as the simulation of traffic with macroscopic models. The contribution explains the analysis of the applicability of Voronoi-based finite volume methods for the approximation of solutions of transport problems. A special concern is the discretisation of the transport equation. Current limitations of the method as well as ideas for stabilisation are explained with examples. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Transport Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2558 ER - TY - JOUR A1 - Semenov, Vitaly A1 - Alekseeva, Elena A1 - Tarlapan, Oleg T1 - Virtual Construction using Map-based Approach N2 - The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Virtuelle Realität KW - Bauwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2447 ER - TY - CHAP A1 - Katzer, Wolfgang T1 - Virtual Construction for our industry – an advantage now, a necessity soon N2 - Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented. KW - Konstruktion KW - construction industry Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1573 ER - TY - CHAP A1 - Robert-Nicoud, Yvan A1 - Raphael, Benny A1 - Smith, Ian F. C. T1 - Using entropy to maximize the usefulness of data collection N2 - This paper presents a generic methodology for measurement system configuration when the goal is to identify behaviour models that reasonably explain observations. For such tasks, the best measurement system provides maximum separation between candidate models. In this work, the degree of separation between models is measured using Shannon’s Entropy Function. The location and type of measurement devices are chosen such that the entropy of candidate models is greatest. This methodology is tested on a laboratory structure and, to demonstrate generality, an existing fresh water supply network in a city in Switzerland. In both cases, the methodology suggests an appropriate set of sensors for identifying the state of the system. KW - Mobile Computing KW - Funknetz KW - Entropie Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1177 ER - TY - CHAP A1 - Parmee, Ian A1 - Abraham, Johnson T1 - User-centric Evolutionary Design Systems - the Visualisation of Emerging Multi-Objective Design Information N2 - The paper describes further developments of the interactive evolutionary design concept relating to the emergence of mutually inclusive regions of high performance design solutions. These solutions are generated from cluster-oriented genetic algorithm (COGAs) output and relate to a number of objectives introduced during the preliminary design of military airframes. The data-mining of multi-objective COGA (moCOGA) output further defines these regions through the application of clustering algorithms, data reduction and variable attribute relevance analyses. A number of visual representations of the COGA output projected onto both variable and objective space are presented. The multi-objective output of the COGA is compared to output from a Strength Pareto Evolutionary Algorithm (SPEA-II) to illustrate the manner in which moCOGAs can generate good approximations to Pareto frontiers. KW - Konzipieren KW - Bauwerk KW - Künstliche Intelligenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1094 ER - TY - JOUR A1 - Katranuschkov, Peter A1 - Gehre, Alexander A1 - Scherer, Raimar J. T1 - User Requirements Capture in Distributed Project Environments: A Process-centred Approach N2 - Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives. KW - Informationstechnik KW - Forschung KW - Europa KW - Bedarfsforschung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2029 ER - TY - CHAP A1 - Garrett, James H. A1 - Akinci, Burcu A1 - Wang, Hongjun T1 - Towards Domain-Oriented Semi-Automated Model Matching for Supporting Data Exchange N2 - The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models. KW - Bauwerk KW - Datenmanagement KW - Datenaustausch Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1324 ER - TY - CHAP A1 - Boukamp, Frank A1 - Akinci, Burcu T1 - Towards Automated Defect Detection: Object-oriented Modeling of Construction Specifications N2 - This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system. KW - Bauwerk KW - Datenmanagement KW - Modellierung KW - Norm Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1315 ER - TY - JOUR A1 - Aziz, Zeeshan A1 - Anumba, Chimay A1 - Miles, John T1 - Towards a Semantic Grid Computing Platform for Disaster Management in Built Environment N2 - Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment. KW - Mehragentensystem KW - Lernendes System KW - Katastrophenmanagement KW - Software Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2084 ER - TY - CHAP A1 - Ward, Michael A1 - Thorpe, Tony A1 - Price, Andrew T1 - The Re-use of Site Data to Inform Business Processes N2 - The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure. KW - Bauwerk KW - Datenmanagement KW - Baustelle KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1308 ER - TY - CHAP A1 - Petzold, Frank A1 - Donath, Dirk T1 - The building as a container of information : the starting point for project development and design formulation N2 - For planning in existing built contexts, the building survey is the starting point for initial planning proposals, for the diagnosis and documentation of building damages, for the creation of objectives catalogues, for the detailed design of renovation and conversion measures and for ensuring fulfilment of building legislation, particularly by change of use and refitting. An examination of currently available IT-tools shows insufficient support for planning within existing contexts, most notably a deficit with regard to information capture and administration. This paper discusses the concept for a modular surveying system (basic concept, separation of geometry from semantic data, and separation into sub-systems) and the prototypical realisation of a system for the complete support of the entire building surveying process for existing buildings. The project aims to contribute to the development of a planning system for existing buildings. ... KW - Architektur KW - Verteiltes System KW - Lebenszyklus KW - Bauwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1848 ER - TY - JOUR A1 - Volkova, Viktorija T1 - The analysis of dynamic behaviour of pre-stressed systems under polyharmonic excitations N2 - Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application. KW - Verkehrsplanung KW - Simulation KW - Baukonstruktion KW - Dynamische Belastung KW - Tragwerk / Vorspannung KW - Vorgespannte Konstruktion Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2656 ER - TY - CHAP A1 - Bürgy, Christian A1 - Garrett, James H. T1 - Supporting Domain Experts in Determining Viable User Interface Designs for Wearable Computers Used in AEC Work Situations N2 - The design of mobile IT systems, especially the design of wearable computer systems, is a complex task that requires computer science knowledge, such as that related to hardware configuration and software development, in addition to knowledge of the domain in which the system is intended to be used. Particularly in the AEC sector, it is necessary that the support from mobile information technology fit the work situation at hand. Ideally, the domain expert alone can adjust the wearable computer system to achieve this fit without having to consult IT experts. In this paper, we describe a model that helps in transferring existing design knowledge from non-AEC domains to new projects in the construction area. The base for this is a model and a methodology that describes the usage scenarios of said computer systems in an application-neutral and domain-independent way. Thus, the actual design information and experience will be transferable between different applications and domains. KW - Mobile Computing KW - Funknetz KW - Benutzeroberfläche KW - Mensch-Maschine-Kommunikation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1168 ER - TY - CHAP A1 - Alda, Sascha A1 - Cremers, Armin B. A1 - Bilek, Jochen T1 - Support of Collaborative Structural Design Processes through the Integration of Peer-to-Peer and Multiagent Architectures N2 - Structural engineering projects are increasingly organized in networked cooperations due to a permanently enlarged competition pressure and a high degree of complexity while performing the concurrent design activities. Software that intends to support such collaborative structural design processes implicates enormous requirements. In the course of our common research work, we analyzed the pros and cons of the application of both the peer-to-peer (University of Bonn) and multiagent architecture style (University of Bochum) within the field of collaborative structural design. In this paper, we join the benefits of both architecture styles in an integrated conceptual approach. We demonstrate the surplus value of the integrated multiagent–peer-to-peer approach by means of an example scenario in which several structural engineers are co-operatively designing the basic structural elements of an arched bridge, applying heterogeneous CAD systems. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Mehragentensystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1481 ER - TY - JOUR A1 - Ke, Chen A1 - Jian Ming, Lu T1 - Study of Analysis System for Bridge Test N2 - Analysis System for Bridge Test (Chinese name abbr.: QLJC) is an application software specially designed for bridge test to analyze the static and dynamic character of bridge structures, calculate efficiency ratio of load test, pick up the results of observation points and so on. In this paper, research content, system design, calculation theory, characteristics and practical application of QLJC is introduced in detail. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Brückenbau KW - Straßenbrücke Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2547 ER - TY - CHAP A1 - Xie, Haiyan A1 - Issa, Raja A1 - O'Brien, William T1 - Structure of a Formal User Model for Construction Information Retrieval N2 - Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction. KW - Bauwerk KW - Datenmanagement KW - Benutzeroberfläche Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1296 ER - TY - CHAP A1 - König, Markus A1 - Klinger, Axel A1 - Berkhahn, Volker T1 - Structural Correctness of Planning Processes in Building Engineering N2 - The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Planungsprozess KW - Konsistenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1690 ER - TY - CHAP A1 - Perevalova, Julia A1 - Pahl, Peter Jan T1 - Structural and Functional Dependence of Objects in Data Bases N2 - Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Objektorientierung KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1683 ER - TY - JOUR A1 - Fink, Thomas T1 - Structural analysis, design and detailing using standard CAD software and standard building information model N2 - This paper describes the concept of a german commercial software package developed for the needs of structural engineers. Using a standard CAD software as user interface for all geometrical data and to save all important input data, there is a natural link to upcoming building information models. KW - Bauindustrie KW - CAD KW - Bauwerk KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2702 ER - TY - JOUR A1 - Romberg, Richard A1 - Niggl, Andreas A1 - van Treeck, Christoph T1 - Structural Analysis based on the Product Model Standard IFC N2 - In this paper we present a computer aided method supporting co-operation between different project partners, such as architects and engineers, on the basis of strictly three-dimensional models. The center of our software architecture is a product model, described by the Industry Foundation Classes (IFC) of the International Alliance for Interoperability (IAI). From this a geometrical model is extracted and automatically transferred to a computational model serving as a basis for various simulation tasks. In this paper the focus is set on the advantage of the fully three-dimensional structural analysis performed by p-version of the finite element analysis. Other simulation methods are discussed in a separate contribution of this Volume (Treeck 2004). The validity of this approach will be shown in a complex example. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Statik KW - Standard Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2433 ER - TY - CHAP A1 - Changwan, Kim A1 - Haas, Carl A1 - Caldas, Carlos T1 - Spatial data acquisition, integration, and modeling for real-time project life-cycle applications N2 - Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach. KW - Bauwerk KW - Datenmanagement KW - Echtzeitsystem KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1280 ER - TY - CHAP A1 - Reinhardt, Jan A1 - Garrett, James H. A1 - Akinci, Burcu T1 - SiDaCoS: Product and Process Models on Construction Sites N2 - Site superintendents performing project management tasks on construction sites need to access project documents and need to collect information that they observe while inspecting the site. Often, information that is observed on a construction site needs to be integrated into electronic documents or project control systems. In the future, we expect integrated product and process models to be the medium for storing and handling construction project management information. Even though mobile computing devices today are already capable of storing and handling such integrated product and process data models, the user interaction with such large and complex models is difficult and not adequately addressed in the existing research. In this paper, we introduce a system that supports project management tasks on construction sites effectively and efficiently by making integrated product and process models accessible. In order to effectively and efficiently enter or access information, site superintendents need visual representations of the project data that are flexible with respect to the level of detail, the decomposition structure, and the type of visual representation. Based on this understanding of the information and data collection needs, we developed the navigational model framework and the application Site Data Collection System (SiDaCoS), which implements that framework. The navigational model framework allows site superintendents to create customized representations of information contained in a product and process model that correspond to their data access and data collection needs on site. KW - Mobile Computing KW - Funknetz KW - Baustelle KW - Controlling KW - data collection KW - construction management KW - product and process models KW - system KW - Work Face Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1156 ER - TY - CHAP A1 - Lehner, Karlheinz A1 - Hartmann, Dietrich T1 - Scenarios for the deployment of distributed engineering applications N2 - Although there are some good reasons to design engineering software as a stand-alone application for a single computer, there are also numerous possibilities for creating distributed engineering applications, in particular using the Internet. This paper presents some typical scenarios how engineering applications can benefit from including network capabilities. Also, some examples of Internet-based engineering applications are discussed to show how the concepts presented can be implemented. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1476 ER - TY - JOUR A1 - Likhitruangsilp, Veerasak A1 - Ioannou, Photios T1 - Risk-sensitive Markov Decision Process for Underground Construction Planning and Estimating N2 - This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference. KW - Mehragentensystem KW - Lernendes System KW - Tunnel KW - Markowschke KW - Kette Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2247 ER - TY - CHAP A1 - Keller, Martin A1 - Antoniadis, George A1 - Menzel, Karsten T1 - Resource Management for the Construction Industry N2 - The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Betriebsmittel Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1679 ER - TY - JOUR A1 - Takagi, Kousuke A1 - Tani, Akinori A1 - Kawamura, Hiroshi T1 - Research on Intelligent Fuzzy Optimal Active and Hybrid Control Systems of Building Structures - Verification of Optimization Method on Switching Rules of Control Forces N2 - Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified. KW - Mehragentensystem KW - Lernendes System KW - Fuzzy-Logik KW - Optimierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2238 ER - TY - JOUR A1 - Osada, Teppei A1 - Koike, Hirotaka A1 - Morimoto, Akinori T1 - Research on Establishment of a Standard of Traffic Impact Assessment with Integrated Database System N2 - Planning support systems, such as geographical information system (GIS) and traffic flow simulation models, are widely in use in recent urban planning research. In this paper we propose a method to apply traffic impact assessment (TIA) to large-scale, commercial developments. In TIA research we often encounter the problem of increasing amount of data that is necessary for detailed investigation and analysis, as the scale of commercial developments become larger and more complex. As a result, TIA presents two problems. The first problem is the difficulty of data acquisition. The second problem is the reliability of data. As a solution, we developed an integrated database system. KW - Verkehrsplanung KW - Simulation KW - Datenbanksystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2647 ER - TY - JOUR A1 - Gong, Dejun A1 - Huang, Limang A1 - Chen, Xi T1 - Research and Application on Highway Construction Visual Management Information System based on the Network and GIS N2 - The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management. KW - Geoinformationssystem KW - Straßenbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2661 ER - TY - JOUR A1 - Kiviniemi, Arto A1 - Fischer, Martin T1 - Requirements Management Interface to Building Product Models N2 - In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Bauwerk KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2427 ER - TY - CHAP A1 - Jaselskis, Edward A1 - White, David A1 - Walters, Russell T1 - Real time geotechnical field data acquistion using a distributed approach N2 - A distributed geotechnical remote analysis of data system (Distributed G-RAD) can benefit both owners and contractors in providing better quality control and assurance on geotechnical projects. The Distributed G-RAD approach involves efficient data acquisition using PDAs with GPS capability, radio frequency identification (RFID) tags for labeling soil samples, laser scanning for measuring lift thickness and volumes of stockpiles and borrow pits. Spatial data storage is provided using a geographic information system (GIS). Portions of this system are already developed while other parts are still being considered. This paper also describes how RFID and laser scanning technologies can be used in the larger Distributed G-RAD system. KW - Mobile Computing KW - Funknetz KW - Geoinformationssystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1146 ER - TY - CHAP A1 - Berkhahn, Volker A1 - Kinkeldey, Christoph A1 - Schleinkofer, Matthias T1 - Re-Engineering Based on Construction Drawings - From Ground Floor Plan to Product Model N2 - For the management or reorganisation of existing buildings, data concerning dimensions and construction are necessary. Often these data are given exclusively by paper-based drawings and no digital data such as a computer based product model or even a CAD-model are available. In order to perform mass calculation, damage mapping or a recalculation of the structure these drawings of the building under consideration have to be analysed manually by the engineer. This is a very time-consuming job. In order to close this gap between drawings of an existing building and a digital product model an approach is presented in this paper to digitise a drawing, to build up geometric and topologic models and to recognise construction parts of the building. Finally all recognised parts are transformed into a three-dimensional geometric model which provides all necessary geometric information for the product model. During this import process the semantics of a ground floor plan has to be converted into a 3D-model. KW - Architektur KW - Verteiltes System KW - Dreidimensionales CAD KW - Produktmodell Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1832 ER - TY - CHAP A1 - Schneider, Mike T1 - Radio Frequency Identification (RFID) Technology and its Applications in the Commercial Construction Industry N2 - This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole. KW - RFID KW - Automatische Identifikation KW - Materialflusssteuerung KW - Bauindustrie Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1061 ER - TY - CHAP A1 - Breit, Manfred A1 - Kündig, Daniel A1 - Häubi, Fritz T1 - Project oriented learning environment (POLE-Europe) N2 - The presented work focuses on collaboration- experiences gathered with complex design and engineering projects, using the learning platform POLE- Europe. Within the POLE environment student-teams from different universities, disciplines and cultural backgrounds are assigned to real-world projects with clearly defined design - tasks, usually to be accomplished within one semester while working in a virtual environment for most of the time. The concept of POLE and the information and collaboration technology is described. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-935 ER - TY - CHAP A1 - Huhnt, Wolfgang T1 - Progress Measurement in Planning Processes on the Base of Process Models N2 - This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmodell KW - Bauablauf Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1664 ER - TY - JOUR A1 - Firmenich, Berthold T1 - Product Models in Network Based Co-operation in Structural Engineering N2 - The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2119 ER - TY - CHAP A1 - Hänninen, Reijo A1 - Laine, Tuomas T1 - Product Models and Life Cycle Data Management in real Projects N2 - Building project, with many different players involved, requires open and commonly accepted standard for product model description. Product model based design tools support easy comparisons of design alternatives and optimisation of design solution technical quality. This supports client s decision-making and design target comparisons through the whole building project. Use of product models enable these tasks to meet both schedule and cost requirements Olof Granlund is using product models and interoperable software as the main tool in projects. The use and the realised benefits are illustrated by examples from 3 different real projects: University building, where product models were used already in the very early phases by the whole design team. Office building for research organisation, where product models were used in so called self-reporting building system. Headquarters for international company, where product models were widely used for building performance analysis and visualisations in design phase as well as for facilities management system configuration for operational phase. KW - Produktmodell KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1528 ER - TY - JOUR A1 - Holtzhauer, Eric A1 - Saal, Helmut T1 - Product modelling in the steel construction domain N2 - The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Stahlbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2415 ER - TY - CHAP A1 - Wender, Katrin A1 - Donath, Dirk A1 - Petzold, Frank T1 - Preparation and provision of building information for planning within existing built contexts N2 - A prerequisite for planning within existing built contexts is precise information regarding the building substance, its construction and materials, possible damages and any modifications and additions that may have occurred during its lifetime. Using the information collected in a building survey the user should be able to “explore” the building in virtual form, as well as to assess the information contained with regard to a specific planning aspect. The functionality provided by an information module should cover several levels of information provision ranging from ‘simple retrieval’ of relevant information to the analysis and assessment of stored information with regard to particular question sets. Through the provision of basic functionality at an elementary level and the ability to extend this using plug-ins, the system concept of an open extendable system is upheld. Using this modular approach, different levels of information provision can be provided as required during the planning process. KW - Architektur KW - Verteiltes System KW - Gebäude KW - Nutzungsänderung KW - Altbaumodernisierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1829 ER - TY - CHAP A1 - Donath, Dirk A1 - Tonn, Christian T1 - Plausibility in Architectural Design - Software Support for the Architect-oriented Design of Colour Schemes for Interiors and Buildings N2 - The approach discussed here is part of research into an overall concept for digital instruments which support the entire planning process and help in enabling planning decisions to be based upon clear reasoning and plausible arguments. Such specialist systems must take into account currently available technology, such as networked working patterns, object-orientation, building and product models as well as the working method of the planner. The paper describes a plausibility instrument for the formulation of colour scheme proposals for building interiors and elevations. With the help of intuitively usable light simulations, colour, material and spatial concepts can be assessed realistically. The software prototype “Coloured Architecture” is conceived as a professional extension to conventional design tools for the modelling of buildings. As such it can be used by the architect in the earliest design phases of the planning process as well as for colour implementation on location. KW - CAD / Architektur KW - Farbenlehre Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1498 ER - TY - CHAP A1 - Tonn, Christian A1 - Wolkowicz, Christian A1 - Thurow, Torsten T1 - Plausibility in Architectural Design - DOMEdesign – Software Support for the formal shaping and architect-oriented design of shell structures N2 - Complex gridshell structures used in architecturally ambitious constructions remain as appealing as ever in the public realm. This paper describes the theory and approach behind the software realisation of a tool which helps in finding the affine self-weight geometry of gridshell structures. The software tool DOMEdesign supports the formal design process of lattice and grid shell structures based upon the laws of physics. The computer-aided simulation of suspension models is used to derive structurally favourable forms for domes and arches subject to compression load, based upon the input of simple architectonic parameters. Irregular plans, three-dimensional topography, a choice different kinds of shell lattice structures and the desired height of the dome are examples of design parameters which can be used to modify the architectural design. The provision of data export formats for structural dimensioning and visualisation software enables engineers and planners to use the data in future planning and to communicate the design to the client. KW - Architektur KW - Verteiltes System KW - Schale Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1812 ER - TY - JOUR A1 - Kang, Shihchung A1 - Miranda, Eduardo T1 - Physics Based Model for Simulating the Dynamics of Tower Cranes N2 - The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Turmdrehkran KW - Dynamische Belastung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2409 ER - TY - JOUR A1 - Gao, Zuoren A1 - Wu, Weiyu A1 - Ren, Aizhu T1 - Physically Based Modeling and Multi-Physical Simulation System for Wood Structure Fire Performance N2 - This research is devoted to promoting the performance-based engineering in wood structure fire. It looks into the characteristic of the material, structural composing and collapse detecting to find out the main factors in the wood structure collapse in fire. The aim of the research is to provide an automatic simulation platform for the complicated circulation. A physically based model for slim member for beams and columns and a frame of multi-physical simulation are provided to implement the system. The physically based model contains material model, structural mechanics model, material mechanics model, as well as geometry model for the compositive simulation. The multi-physical simulation is built on the model and has the capacity to carry out a simulation combining structural, fire (thermal, CFD) and material degradation simulation. The structural and fire simulation rely on two sophisticated software respectively, ANSYS (an FEA software) and FDS (with a core of CFD). Researchers of the paper develop system by themselves to combine the two existing ones. The system has the capability to calculate the wood char to find out the loss of cross-section and to detect the collapse caused in different ways. The paper gives a sample of Chinese traditional house to show how this simulation system works. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Holzbau KW - Brandschutz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2381 ER - TY - JOUR A1 - Shih, Naai-Jung A1 - Lee, Wen-Pang T1 - Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space N2 - An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Luft KW - Schadstoffkonzentration Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2376 ER - TY - JOUR A1 - Vogel, Manfred A1 - Breit, Manfred A1 - Märki, Fabian T1 - Optimization of 4D Process Planning using Genetic Algorithms N2 - The presented work focuses on the presentation of a discrete event simulator which can be used for automated sequencing and optimization of building processes. The sequencing is based on the commonly used component–activity–resource relations taking structural and process constraints into account. For the optimization a genetic algorithm approach was developed, implemented and successfully applied to several real life steel constructions. In this contribution we discuss the application of the discrete event simulator including its optimization capabilities on a 4D process model of a steel structure of an automobile recycling facility. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Genetischer Algorithmus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2360 ER - TY - CHAP A1 - Yamabe, Yuichiro A1 - Kawamura, Hiroshi A1 - Tani, Akinori T1 - Optimal Design for Recurrent Architecture Network Harmonized with Circulation-type Societies by Applying Genetic Algorithms to Multiagent Model N2 - In this paper, a circulation-type society is expressed by recurrent architecture network described with multi-agent model which consists of the following agents: user, builder, reuse maker, fabricator, waste disposer, material maker and earth bank (see Fig.1). Structural members, materials, resources and monies move among these agents. Each agent has its own rules and aims, regarding structural damages, lifetime, cost reduction, numbers of structural members and structural systems. Reasonable prices of members (fresh, reused, recycled and disposed) can be optimized by GAs in this system considering equal distribution of monies among agents. KW - Mehragentensystem KW - Lernendes System KW - Genetischer Algorithmus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1892 ER -