TY - THES A1 - Zafar, Usman T1 - Probabilistic Reliability Analysis of Wind Turbines N2 - Renewable energy use is on the rise and these alternative resources of energy can help combat with the climate change. Around 80% of the world's electricity comes from coal and petroleum however, the renewables are the fastest growing source of energy in the world. Solar, wind, hydro, geothermal and biogas are the most common forms of renewable energy. Among them, wind energy is emerging as a reliable and large-scaled source of power production. The recent research and confidence in the performance has led to the construction of more and bigger wind turbines around the world. As wind turbines are getting bigger, a concern regarding their safety is also in discussion. Wind turbines are expensive machinery to construct and the enormous capital investment is one of the main reasons, why many countries are unable to adopt to the wind energy. Generally, a reliable wind turbine will result in better performance and assist in minimizing the cost of operation. If a wind turbine fails, it's a loss of investment and can be harmful for the surrounding habitat. This thesis aims towards estimating the reliability of an offshore wind turbine. A model of Jacket type offshore wind turbine is prepared by using finite element software package ABAQUS and is compared with the structural failure criteria of the wind turbine tower. UQLab, which is a general uncertainty quantification framework developed at ETH Zürich, is used for the reliability analysis. Several probabilistic methods are included in the framework of UQLab, which include Monte Carlo, First Order Reliability Analysis and Adaptive Kriging Monte Carlo simulation. This reliability study is performed only for the structural failure of the wind turbine but it can be extended to many other forms of failures e.g. reliability for power production, or reliability for different component failures etc. It's a useful tool that can be utilized to estimate the reliability of future wind turbines, that could result in more safer and better performance of wind turbines. KW - Windturbine KW - Windenergie KW - Wind Turbines KW - Wind Energy KW - Reliability Analysis KW - Zuverlässigkeitsanalyse Y1 - 2019 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20240507-39773 ER - TY - THES A1 - Udrea, Mihai-Andrei T1 - Assessment of Data from Dynamic Bridge Monitoring N2 - The focus of the thesis is to process measurements acquired from a continuous monitoring system at a railway bridge. Temperature, strain and ambient vibration records are analysed and two main directions of investigation are pursued. The first and the most demanding task is to develop processing routines able to extract modal parameters from ambient vibration measurements. For this purpose, reliable experimental models are achieved on the basis of a stochastic system identification(SSI) procedure. A fully automated algorithm based on a three-stage clustering is implemented to perform a modal parameter estimation for every single measurement. After selecting a baseline of modal parameters, the evolution of eigenfrequencies is studied and correlated to environmental and operational factors. The second aspect deals with the structural response to passing trains. Corresponding triggered records of strain and temperature are processed and their assessment is accomplished using the average strains induced by each train as the reference parameter. Three influences due to speed, temperature and loads are distinguished and treated individually. An attempt to estimate the maximum response variation due to each factor is also carried out. KW - automatic modal analysis KW - stochastic subspace identification KW - modal tracking KW - modal parameter estimation KW - clustering KW - Messtechnik Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20140429-21742 ER - TY - THES A1 - Rauch, Kristin T1 - Simulation - Termincontrolling beim Bau einer Brückenkappe T1 - Simulation - critical path monitoring for the construction of a bridge curb N2 - Die Simulation ist vor allem in der Forschung und Wissenschaft ein bekanntes Ver-fahren zur Untersuchung von dynamischen Prozessen. Fachgebiete wie u.a. die Medizin und Biologie, das Verkehrswesen, die Automobilindustrie, die Meteorologie und die Fertigungstechnik gewinnen neue Erkenntnisse aus dem Einsatz derartiger Analyseverfahren. Gründe für die Anwendung von Computersimulationen erstrecken sich von finanziellen und zeitlichen Aspekten über eine Risikoverringerung bis hin zu einer vereinfachten Vorgehensweise. Nicht in allen Bereichen aber werden die viel-seitigen Vorteile von Simulationsmethoden genutzt. In der Baubranche wird Simulation derzeit nur ansatzweise eingesetzt. Doch vor al-lem Baustellen bieten durch den zunehmenden Kosten- und Termindruck sowie viel-seitige andere Einflüsse eine gute Basis für die Anwendung von Simulationsmetho-den. Der Bauablauf kann dadurch besser kontrolliert und gesteuert werden. In der Planungsphase von Bauprojekten wird Simulation bereits in Grundzügen für die Op-timierung von Bauablauf- und Logistikprozessen genutzt. Allerdings ist besonders die Ausführungsphase durch Störungen und Änderungen geprägt, sodass hier Simu-lationsmethoden noch effektiver eingesetzt werden können. Im Rahmen dieser Arbeit sollen die Einsatzmöglichkeiten von Simulationsmethoden für die Optimierung des Termincontrollings untersucht werden. Durch das Aufzeigen verschiedener Methoden sowie einem Vergleich über ihre Vor- und Nachteile wird herausgefiltert, welches Simulationswerkzeug am effektivsten im Termincontrolling eingesetzt werden kann. Ein weiteres Ziel dieser Arbeit ist die Modellierung eines Beispielprozesses anhand eines ausgewählten Simulationsverfahrens. Die Herstellung einer Brückenkappe wird in diesem Zusammenhang umfangreich dargestellt und analysiert. Eventuelle Zwangspunkte bei der Umsetzung und verschiedene Lösungsmöglichkeiten werden aufgezeigt. N2 - Simulation as supporting method to analyse difficult processes is already successful implemented in different domains, but it is also increasingly used in the construction industry. Above all infrastructure construction sites are characterised by enormous pressure of time and costs. For solving these problems and controlling the construction progress, simulation tools can be used more intensively. Up to now these tools are applied only in the start-up phase of a project for the optimisation of construction and logistic processes. But especially the construction phase is characterised by disturbances and changes. The topic of this master thesis “Simulation – critical path monitoring for the construction of a bridge curb” deals with developments to optimise the controlling of the construction progress by using simulation. At first different modelling methods are showed and analysed, how they can be used to simulate construction processes. Then a detailed investigation of the building of a bridge curb follows. Subsequent this construction progress is simulated with the computer program “Plant Simulation”. Finally limits of simulation tools are analysed and future lines of development are demonstrated. KW - Simulation KW - Termincontrolling KW - Bauablauf KW - Prozessoptimierung KW - Brückenkappe KW - simulation KW - critical path monitoring KW - construction progress KW - process optimisation KW - bridge curb Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20081111-14414 ER - TY - THES A1 - Piethe, Vivienne T1 - Konfektionierung eines Calciumsulfat-Bindemittelsystems zur Herstellung volumenstabiler Fließestrichmörtel N2 - Bei einem marktüblichen Calciumsulfat-Fließestrich wurden in der Praxis schädigende Volu-menexpansionen festgestellt. Diese sind ein Resultat aus dem Zusammenwirken des einge-setzten Bindemittel-Compounds und einer kritischen Gesteinskörnung. Das Ziel dieser Arbeit ist es, ein Calciumsulfat-Bindemittelsystem zu konfektionieren, welches in der Lage ist, die im Mörtel festgestellten Volumenexpansionen zu unterbinden. Es sollen verschiedene Bindemittel- und Additivzusammensetzungen untersucht werden, welche in Verbindung mit der kritischen Gesteinskörnung die Herstellung eines volumenstabilen Fließestrichs ermöglichen. Dazu soll folgende Fragestellung beantwortet werden: Welche Ursachen hat die Volumenzunahme und wie ist diese zu minimieren bzw. unterbinden? Dabei werden unterschiedliche Bindemittelrezepturen aus α-Halbhydrat, Thermoanhydrit und Naturanhydrit, sowie verschiedene Additivzusammensetzungen hergestellt und untersucht. Durch Längenänderungsmessungen in der Schwindrinne werden die Einflüsse der Binde-mittel, der Additivzusammensetzungen und der Wasser/Bindemittel-Werte auf das Län-genänderungsverhalten untersucht. Mittels Variation der einzelnen Compound-Bestandteile kann festgestellt werden, dass der Stabilisierer die Längenänderung negativ beeinflusst. Dieser bindet freies Wasser, welches für eine Reaktion zwischen Bindemittel und Gesteins-körnung im plastischen Zustand nicht mehr zur Verfügung steht. Diese Reaktion kann folglich erst im erhärteten Zustand ablaufen und verursacht die schädigende Volumenexpansion. Abschließend wurde ein Bindemittel-Compound konfektioniert, welcher ohne Zusatz von Stabilisierern in Zusammenhang mit der kritischen Gesteinskörnung volumenstabil ist und keine Schäden auslöst. KW - Calciumsulfat KW - Gips KW - Fließestrich KW - Volumenstabilität KW - Calciumsulfatfließestrich Y1 - 2018 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20190902-39445 ER - TY - THES A1 - Mukherjee, Nilangshu T1 - A numerical comparison of the impact of different climatic conditions in different geographic locations on the construction of an office building N2 - The aim of my research is to observe the variance of energy efficiency of a typical multi-story office building under the exposure of different climatic conditions. Energy efficiency requirements in building codes or energy standards are among the most important single measures for buildings’ energy efficiency. Therefore, this study can be set up for a better understanding of how energy efficiency of a building changes under the effect of adverse to moderate climatic conditions which possess a mentionable effect on the operation of a building. This thesis is structured in three balanced and conceptual steps. Following the aim of the project, the virtual building model is to be analyzed under the effect of seven distinct climatic conditions namely work environment of New Delhi, Mumbai, Berlin, Lisbon, Copenhagen, Dubai and Montreal. Firstly, the task is to do a complete literature research based on the scope of similar researches and studying the problems in detail along with the theoritical background all the concepts which are implemented to get the numerical results. This chapter also comprises a detailed study of the climatic conditions of the above-mentioned cities. Different climatic traits like temperature variations, count of heating and cooling degree days, relative humidity, temperature range and comfort zonal charts for the specified cities are studied in detail. This study helps to understand the effect of these adverse to moderate climates on the operation of the building. On the second step, the virtual building model is prepared on a software platform named Revit Structures. This virtual building model is not necessarily a complete building, but it has the relevant functionalities of a real building. We perform the energy analysis and the heating and cooling analysis on this virtual building model to study the operational outcome of the building under different climatic conditions in detail. By the end of these above two tasks, two scenarios are observed. On one hand, we have a literature research and on the other hand we have the numerical results. Therefore, finally we present a comparative scenario based on the energy efficient performances of the building under such variant climatic conditions. This is followed by the prediction of thermal comfort level inside the building and it based on Fanger’s PMV Model. Understanding the literature and the numerical values in detail helps us to predict the index thermal comfort level inside the building. The conclusion of this master thesis focuses mainly on the scopes of improvement of energy efficiency requirements in energy codes if any, differentiated according to specific locations. The initial aim of my hypothesis which is to study the impacts of climatic variations on the energy efficient performances of a building is fulfilled but as such topics have very deep and broad roots, the scope of further improvements is always predominant. KW - Klima KW - Energieeffizienz KW - Climatic conditions KW - Building performance Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170811-32700 ER - TY - THES A1 - Miller, Martin T1 - BIM-basierte Digitalisierung von Bestandsgebäuden aus Sicht des FM am Beispiel von Heizungsanlagen N2 - Das Ziel der Arbeit ist, für das Facility Management relevante Informationen für die mit Building Information Modeling basierende Erstellung von Bestandsgebäuden am Beispiel einer Hei- zungsanlage zu definieren. Darauf basierend sind die notwendigen Arbeitsschritte der Objek- taufnahme abgeleitet. Für die Definition der Arbeitsschritte wurden das grundlegende Vorge- hen bei einer Objektaufnahme sowie die gesetzlichen Gegebenheiten für den Betrieb einer Heizungsanlage dargelegt. Darüber hinaus sind in der vorliegenden Ausarbeitung die Vorteile und Herausforderungen hinsichtlich des Zusammenspiels von Building Information Modeling und Facility Management analysiert. Die definierten Arbeitsschritte sind anhand eines Beispiel- projektes angewendet worden. Im Rahmen des Beispielprojekts sind die entscheidenden Be- triebsdaten je Anlagenteil in Form von Informationsanforderungen nach DIN 17412 definiert. Das Gebäudemodell ist durch Parameter mit den für das Facility Management relevanten In- formationen ergänzt. Die Resultate des Beispielprojektes sind mit aussagekräftigen Schnitten, Plänen sowie 3-D-Visualisierungen dargestellt. Abschließend sind die Ergebnisse in Bezug auf das FM validiert. Aus den Arbeitsschritten und Ergebnissen ist eine Leitlinie erstellt worden für den Digitalisierungsprozess von Bestandsgebäuden für das Facility Management. KW - Facility Management KW - BIM Y1 - 2022 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220623-46616 ER - TY - THES A1 - Küster, Felix Pascal T1 - Helsinki Central N2 - Als zentraler Ort und Eingangstor in die finnische Hauptstadt bietet der Bereich um den Bahnhof, in dem sich das Baufeld befindet zu wenig räumliche Qualitäten und bildet gleichzeitig eine Barriere zwischen dem historischen Stadtkern und dem politischen und kulturellem Zentrum der Stadt. Der historische Bahnhof aus der Epoche des Jugendstils ist momentan eingeschlossen von einer hochfrequentierten Straße im Süden und den flankierenden Stationen des Busbahnhofs an der Ost- und Westseite. Die fußläufigen Verbindungen in die Altstadt sind gestört und das Regierungsviertel mit dem Reichstagsgebäude werden links liegen gelassen. Eine Orientierung als Neuankömmling ist schwer möglich. Darüber hinaus kommt etwa die Hälfte der Züge, vor allem die Regionalzüge nicht in der Bahnhofshalle des Kopfbahnhofes an, weil die Begrenzung durch die Seitenflügel nur eine Erweiterung des Bahnhofs nach Norden hin zuließ. Entstanden ist ein Entwurf der versucht, dem gesamten Bereich um den Bahnhof ein neues Gesicht zu geben und eine Verbesserung auf unterschiedlichen Ebenen zu erreichen. Er bündelt zum einen die verschiedenen Verkehrsströme und stellt eine bisher unterbrochene Querverbindung zwischen den benachbarten Stadtvierteln entlang des Bahnhofsareals her. Zum anderen trägt er dem Erfordernis nach einem städtebaulichen Gegenüber für das Regierungsgebäude Rechnung, welches damit in den Verbund der kulturellen Einrichtungen auf dem Töölönlahti Gelände aufgenommen wird. Darüber hinaus belebt er eine Besonderheit von Helsinki. Zu Beginn des 20. Jahrhunderts bestand die Notwendigkeit den Hafen an das Schienennetz anzubinden. Da der Stadtkern bereits sehr dicht bebaut war, wurde ein Eisenbahnring entlang der Küste, einmal um das Stadtzentrum herum gebaut. Seitdem die Verbindung stillgelegt wurde liegt dieser Ring brach, was nun die große Chance bietet, eine kreuzungsfreien Rad- und Fußweg zu etablieren, der durch den Entwurf eines Mobilityhubs geschlossen würde. In der vorliegenden Broschüre werden die städtebaulichen Rahmenbedingungen, die Analyse der gegenwärtigen Situation und der eigentliche Entwurfsprozess, der zu dieser Lösung führte dokumentiert. KW - Weimar / Bauhaus-Universität Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20120807-16867 ER - TY - THES A1 - Kavrakov, Igor T1 - Structural Optimization of Composite Cross-Sections and Elements using Energy Methods N2 - Structural optimization has gained considerable attention in the design of structural engineering structures, especially in the preliminary phase. This study introduces an unconventional approach for structural optimization by utilizing the Energy method with Integral Material Behavior (EIM), based on the Lagrange’s principle of minimum potential energy. An automated two-level optimization search process is proposed, which integrates the EIM, as an alternative method for nonlinear structural analysis, and the bilevel optimization. The proposed procedure secures the equilibrium through minimizing the potential energy on one level, and on a higher level, a design objective function. For this, the most robust strategy of bilevel optimization, the nested method is used. The function of the potential energy is investigated along with its instabilities for physical nonlinear analysis through principle examples, by which the advantages and limitations using this method are reviewed. Furthermore, optimization algorithms are discussed. A numerical fully functional code is developed for nonlinear cross section, element and 2D frame analysis, utilizing different finite elements and is verified against existing EIM programs. As a proof of concept, the method is applied on selected examples using this code on cross section and element level. For the former one a comparison is made with standard procedure, by employing the equilibrium equations within the constrains. The validation of the element level was proven by a theoretical solution of an arch bridge and finally, a truss bridge is optimized. Most of the principle examples are chosen to be adequate for the everyday engineering practice, to demonstrate the effectiveness of the proposed method. This study implies that with further development, this method could become just as competitive as the conventional structural optimization techniques using the Finite Element Method. KW - Strukturoptimierung Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20190815-39593 ER - TY - THES A1 - Hollerbuhl, Lutz T1 - Simulation der Schädigung der Kölnbreintalsperre während des Ersteinstaus 1978 T1 - Crack propagation simulations for the Koelnbrein-Dam N2 - Die Arbeit befasst sich mit der österreichischen Bogenstaumauer Kölnbrein, die während des Ersteinstaus geschädigt wurde. Diese Schäden, sowie mögliche Ursachen sind anhand von Literaturquellen dokumentiert. Nach Erstellung eines Rechenmodells wurden, durch ein Randelementeprogramm, Rissfortschrittsberechnungen durchgeführt und mit dem realen Bauwerk verglichen. Zum Einsatz kamen die Anwendungen „OSM“, „FRANC3D“ und „BES“ der Cornell-University. KW - Rissausbreitung KW - Talsperre KW - Bogenstaumauer KW - Staumauer KW - Kölnbrein KW - Koelnbrein KW - Crack Y1 - 2005 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5877 N1 - Der Volltext-Zugang wurde im Zusammenhang mit der Klärung urheberrechtlicher Fragen mit sofortiger Wirkung gesperrt. ER - TY - THES A1 - Habtemariam, Abinet Kifle T1 - Numerical Demolition Analysis of a Slender Guyed Antenna Mast N2 - The main purpose of the thesis is to ensure the safe demolition of old guyed antenna masts that are located in different parts of Germany. The major problem in demolition of this masts is the falling down of the masts in unexpected direction because of buckling problem. The objective of this thesis is development of a numerical models using finite element method (FEM) and assuring a controlled collapse by coming up with different time setups for the detonation of explosives which are responsible for cutting down the cables. The result of this thesis will avoid unexpected outcomes during the demolition processes and prevent risk of collapsing of the mast over near by structures. KW - Abbruch KW - Finite-Elemente-Methode KW - Optimierung KW - Demolition KW - Guyed antenna masts KW - Explicit finite element method KW - Optimization Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210723-44609 ER - TY - THES A1 - Gollos, Carolin T1 - Optimierung der Baustellenlogistik für die Ausbauphase eines Großprojektes N2 - Baulogistische Vorgänge sind in einer modern angelegten Baustelle der Schlüssel zu einer wirtschaftlichen Abwicklung. Dieses gilt nicht nur für den Rohbau, bei dem die sehr enge Verzahnung zwischen den Fertigungs- und Logistikprozessen auf der Baustelle zu beobachten ist, sondern noch mehr für die Ausbauphase, bei der vermeintlich unabhängig voneinander agierende Einzelunternehmen des Ausbaus auf engem Raum miteinander um die jeweils besten Liefer- und Montagebedingungen konkurrieren. Ausgehend von einer aktuellen Großbaustelle in Jena werden verschiedene Varianten einer leistungsfähigen Baulogistik entwickelt und deren Implementierung auf der Baustelle vorbereitet werden. KW - Baulogistik KW - Ausbau KW - Großbaustelle Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20140901-22858 ER - TY - THES A1 - Fröhlich, Jan T1 - On systematic approaches for interpreted information transfer of inspection data from bridge models to structural analysis N2 - In conjunction with the improved methods of monitoring damage and degradation processes, the interest in reliability assessment of reinforced concrete bridges is increasing in recent years. Automated imagebased inspections of the structural surface provide valuable data to extract quantitative information about deteriorations, such as crack patterns. However, the knowledge gain results from processing this information in a structural context, i.e. relating the damage artifacts to building components. This way, transformation to structural analysis is enabled. This approach sets two further requirements: availability of structural bridge information and a standardized storage for interoperability with subsequent analysis tools. Since the involved large datasets are only efficiently processed in an automated manner, the implementation of the complete workflow from damage and building data to structural analysis is targeted in this work. First, domain concepts are derived from the back-end tasks: structural analysis, damage modeling, and life-cycle assessment. The common interoperability format, the Industry Foundation Class (IFC), and processes in these domains are further assessed. The need for usercontrolled interpretation steps is identified and the developed prototype thus allows interaction at subsequent model stages. The latter has the advantage that interpretation steps can be individually separated into either a structural analysis or a damage information model or a combination of both. This approach to damage information processing from the perspective of structural analysis is then validated in different case studies. KW - Brückenbau KW - Strukturanalyse KW - Schadensanalyse KW - BIM KW - IFC KW - bridge inspection KW - damage information model KW - structural analysis KW - IFC KW - BIM Y1 - 2020 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20200416-41310 ER - TY - THES A1 - Cicek, Burhan A1 - Cancino, Pamela T1 - Küreken 2013. Entwerfen eines Dorfes aus Lehm N2 - Die Diskussionen in der Politik und in der Gesellschaft über Klimawandel, globale Erwärmung oder Nachhaltigkeit, die schon noch länger anhält, werden nie ein Ende finden, solange die Probleme, auf denen sie basiert, unlösbar bleiben. Vorgeschlagene Lösungen werden meist nicht richtig umgesetzt. Im Zusammenhang mit dieser Problematik steigt aber das Verantwortungsgefühl für bessere Zukunftsstrategien immer mehr. Die in den letzten Jahren vorgekommenen Umweltkatastrophen, wie im Golf von Mexiko (April 2010) oder im Fukushima (März 2011) die noch aktuell sind, zeigen, dass der Primärenergieeinsatz oder die Transportproblematik nicht mehr nur die Sorge der Entwicklungsländer, sondern auch der Industrieländer ist. Die Bauwelt mit ihrem erheblichen Energiebedarf spielt bei der Festlegung der Zukunftsstrategien eine große Rolle. Vor allem sind die Forschungen nach umweltfreundlichen Materialien, der Recyclebarkeit der eingesetzten Baumaterialien oder dem vernünftigen Nutzen der Naturressourcen die wichtigsten Schwerpunkte. In dieser Hinsicht bringt Lehm als Baumaterial viele Vorteile mit sich. Bei einem Artikel sagt der Lehmbauexperte Martin Rauch: “In heutiger Zeit und einem Kulturkreis, in dem Baugrund und Arbeitszeit unsere großen Kosten verursachen, findet der tradierte Lehmbau mit dem verbundenen großen Aufwand an menschlicher Arbeitszeit nur schwer seinen Platz. Über die Art der Bauweise wird auch die Entscheidung gefällt, wie und wo die Wertschöpfung erfolgt und ob der Einsatz des Budgets einen gesellschaftlichen Nutzen mit sich bringt. Im Vergleich zu einem Sichtbetonhaus können bei einem Stampflehmhaus 40% der Primärenergie ein gespart und dafür mehr lokale Arbeitsressourcen gebunden werden. Davon profitieren vor allem die lokalen Handwerker und mittelständischen Betriebe” Anatolien ist der Ort, wo man immer noch die tiefsten Wurzeln der Baukultur menschlicher Geschichte findet. Diese Baukultur, die in den vergangenen Jahrzehnten fast verlorengegangen ist, ist die Lehmbaukultur. In dieser Hinsicht beabsichtigt dieser Entwurf die Würde des Lehms in Anatolien wieder herzustellen und dadurch dessen Glaubwürdigkeit zurückzubringen. KW - Lehm KW - Lehmbau KW - stabilisierter Lehm KW - Stampflehm KW - Alker Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20240507-63568 ER - TY - THES A1 - Bresan, Uwe T1 - STIFTERS ROSENHAUS N2 - Es mag verwegen klingen, den Ursprung der modernen Architektur ausgerechnet in der österreichischen Provinz verankern zu wollen. Doch tatsächlich finden wir hier – mit Adalbert Stifters "Nachsommer" von 1857 – die wohl früheste Formulierung einer Urhütte der Moderne. Stifter (1805-1867), der Nationalheilige der österreichischen Literatur, beschreibt in seiner Erzählung auf das ausführlichste und umfänglichste das sogenannte Rosenhaus. Vor allem die Architekten der traditionellen Richtung waren immer wieder fasziniert von diesen Beschreibungen und ließen sich von Stifter auf die vielfältigsten Weisen anregen. Die Ausführungen des Hausherren des Rosenhofes über die Produkte seiner Werkstätten und die Schilderungen des einfachen Lebens in den Räumen des Rosenhauses fanden einen immensen Widerhall bei den Baumeistern der frühen Werkbundbewegung, ebenso wie bei den Architekten aus dem Umfeld der Stuttgarter Schule. So lassen sich nachsommerliche Impulse in Leben, Werk und Lehre der traditionellen Architekten Paul Schultze-Naumburg, Theodor Fischer und Paul Schmitthenner entdecken, aber auch bei Vertretern einer dezidierten Moderne wie Erich Mendelsohn, Bruno Taut oder Walter Gropius. So kann gezeigt werden, dass Schultze-Naumburgs privates Anwesen im sachsen-anhaltinischen Saaleck eine vollständige Realisierung des Rosenhauses und der damit verbundenen Lehrwerkstättenidee darstellt. Und am Beispiel von Paul Schmitthenner und Theodor Fischer kann auf eindrucksvolle Weise nachvollzogen werden, wie Stifters "Gesetzbuch des schönen Lebens" Werk, Lehre und Alltag eines Architekten bestimmen konnte. Für Friedrich Nietzsche, der den "Nachsommer" unter die wenigen Werke deutscher Literatur nach Goethe einordnete, die es verdienten, "wieder und wieder gelesen zu werden", stellte der "Roman der heilen Welt" die Vorwegnahme seines Diktums dar, dass das Dasein nur als ein Ästhetisches zu rechtfertigen sei. Das Rosenhaus, und dessen ethisches sowie ästhetisches Ideal, bildete die dazu entsprechende räumliche Form. Der "Nachsommer" ist, mit Roland Barthes gesprochen, eine Utopie – genauer: eine häusliche Utopie – "die gestaltende Suche nach dem höchsten Gut, was das Wohnen angeht." Dabei sind die selbstgewählten, ästhetischen Verhaltensweisen, die Stifter damals – am Beginn der Moderne – begründete, bis heute Merkmal der Formen des Bürgerlichen und sein Rosenhaus das Modell einer modernen, bürgerlich-traditionellen Architektur. Für beides, für die Ästhetik des Lebens wie auch für die entsprechende Architektur, diente Goethe oder besser die Beschreibung Goethes durch seinen Sekretär Eckermann als Vorbild. KW - Stifter KW - Adalbert / Der Nachsommer KW - Rosenhaus KW - Architektur KW - Nachsommer KW - Adalbert KW - Stifter Y1 - 2007 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20080422-13576 ER - TY - THES A1 - Bendalla, Abdulmagid Sedig Khalafallah T1 - Nonlinear Numerical Modelling of Cable Elements in Bridges for Dynamic Analysis N2 - Identifying cable force with vibration-based methods has become widely used in engineering practice due to simplicity of application. The string taut theory provides a simple definition of the relationship between natural frequencies and the tension force of a cable. However, this theory assumes a perfectly flexible non-sagging cable pinned at its ends. These assumptions do not reflect all cases, especially when the cable is short, under low tension forces or the supports are partially flexible. Extradosed bridges, which are distinguished from cable-stayed bridges by their low pylon height, have shorter cables. Therefore the application of the conventional string taut theory to identify cable forces on extradosed bridge cables might be inadequate to identify cable forces. In this work, numerical modelling of an extradosed bridge cable saddled on a circular deviator at pylon is conducted. The model is validated with the catenary analytical solution and its static and dynamic behaviours are studied. The effect of a saddle support is found to positively affect the cable stiffness by geometric means; longer saddle radius increases the cable stiffness by suppressing the deformations near the saddle. Further, accounting the effects of bending stiffness in the numerical model by using beam elements show considerable deviation from models with truss elements (i.e. zero bending stiffness). This deviation is manifested when comparing the static and dynamic properties. This motivates a more thorough study of bending stiffness effects on short cables. Bending stiffness effects are studied using two rods connected with several springs along their length. Under bending moments, the springs resist the rods' relative axial displacement by the springs' transverse component. This concept is used to identify bending stiffness values by utilizing the parallel axis theorem to quantify ratios of the second moment of area. These ratios are calculated based on the setup of the springs (e.g. number of springs per unit length, transverse stiffness, etc...). The numerical model based on this concept agrees well with the theoretical values computed using upper and lower bounds of the parallel axis theorem. The proposed concept of quantifying ratios of the second moment of area using springs as connection between cable rods is applied on an actual extradosed bridge geometry. The model is examined by comparison to the previously validated global numerical model. The two models showed good correlation under various changing parameters. This allowed further study of the effects of stick/slip behaviour between cable rods on an actual bridge geometry. KW - Kabel KW - Nonlinear Cable Analysis KW - Bending Stiffness of cable elements KW - Biegesteifigkeit Y1 - 2019 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20191007-39940 ER - TY - THES A1 - Asslan, Milad T1 - An Experimental Study on the Initial Shear Stiffness in Granular Material under Controlled Multi-Phase Laboratory Conditions N2 - The initial shear modulus, Gmax, of soil is an important parameter for a variety of geotechnical design applications. This modulus is typically associated with shear strain levels about 5*10^-3% and below. The critical role of soil stiffness at small-strains in the design and analysis of geotechnical infrastructure is now widely accepted. Gmax is a key parameter in small-strain dynamic analyses such as those to predict soil behavior or soil-structure interaction during earthquake, explosions, machine or traffic vibration where it is necessary to know how the shear modulus degrades from its small-strain value as the level of shear strain increases. Gmax can be equally important for small-strain cyclic situations such as those caused by wind or wave loading and for small-strain static situations as well. Gmax may also be used as an indirect indication of various soil parameters, as it, in many cases, correlates well to other soil properties such as density and sample disturbance. In recent years, a technique using bender elements was developed to investigate the small-strain shear modulus Gmax. The objective of this thesis is to study the initial shear stiffness for various sands with different void ratios, densities, grain size distribution under dry and saturated conditions, then to compare empirical equations to predict Gmax and results from other testing devices with results of bender elements from this study. KW - Soil KW - Shear modulus KW - Shear wave KW - Soil dynamics KW - Bender elements Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20120402-15842 ER - TY - THES A1 - Alabassy, Mohamed Said Helmy T1 - Automated Approach for Building Information Modelling of Crack Damages via Image Segmentation and Image-based 3D Reconstruction N2 - As machine vision-based inspection methods in the field of Structural Health Monitoring (SHM) continue to advance, the need for integrating resulting inspection and maintenance data into a centralised building information model for structures notably grows. Consequently, the modelling of found damages based on those images in a streamlined automated manner becomes increasingly important, not just for saving time and money spent on updating the model to include the latest information gathered through each inspection, but also to easily visualise them, provide all stakeholders involved with a comprehensive digital representation containing all the necessary information to fully understand the structure’s current condition, keep track of any progressing deterioration, estimate the reduced load bearing capacity of the damaged element in the model or simulate the propagation of cracks to make well-informed decisions interactively and facilitate maintenance actions that optimally extend the service life of the structure. Though significant progress has been recently made in information modelling of damages, the current devised methods for the geometrical modelling approach are cumbersome and time consuming to implement in a full-scale model. For crack damages, an approach for a feasible automated image-based modelling is proposed utilising neural networks, classical computer vision and computational geometry techniques with the aim of creating valid shapes to be introduced into the information model, including related semantic properties and attributes from inspection data (e.g., width, depth, length, date, etc.). The creation of such models opens the door for further possible uses ranging from more accurate structural analysis possibilities to simulation of damage propagation in model elements, estimating deterioration rates and allows for better documentation, data sharing, and realistic visualisation of damages in a 3D model. KW - Building Information Modeling KW - BIM KW - IFC KW - Damage Information Modelling KW - Cracks Segmentation KW - Cracks 3D Modelling KW - Netscape Internet Foundation Classes Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20230818-64162 ER -