TY - THES A1 - Alkam, Feras T1 - Vibration-based Monitoring of Concrete Catenary Poles using Bayesian Inference N2 - This work presents a robust status monitoring approach for detecting damage in cantilever structures based on logistic functions. Also, a stochastic damage identification approach based on changes of eigenfrequencies is proposed. The proposed algorithms are verified using catenary poles of electrified railways track. The proposed damage features overcome the limitation of frequency-based damage identification methods available in the literature, which are valid to detect damage in structures to Level 1 only. Changes in eigenfrequencies of cantilever structures are enough to identify possible local damage at Level 3, i.e., to cover damage detection, localization, and quantification. The proposed algorithms identified the damage with relatively small errors, even at a high noise level. KW - Parameteridentifikation KW - Bayesian Inference, Uncertainty Quantification KW - Inverse Problems KW - Damage Identification KW - Concrete catenary pole KW - SHM KW - Inverse Probleme KW - Bayes’schen Inferenz KW - Unschärfequantifizierung KW - Schadenerkennung KW - Oberleitungsmasten Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210526-44338 UR - https://asw-verlage.de/katalog/vibration_based_monitoring_of_co-2363.html VL - 2021 PB - Bauhaus-Universitätsverlag CY - Weimar ER - TY - THES A1 - Reshetnikova, Tatiana T1 - Transformation of the Environment: Influence of “Urban Reagents.” German and Russian Case Studies N2 - An urban regeneration manifests itself through urban objects operating as change agents. The en-tailed diverse effects on the surroundings demonstrate experimental origin - an experiment as a preplanned but unpredictable method. An understanding of influences and features of urban ob-jects requires scrutiny due to a high potential of the elements to force an alteration and reactions. This dissertation explores the transformation of the milieu and mechanisms of this transformation. KW - urban reagent KW - urban transformation KW - urban virus KW - effects of architecture KW - experiment KW - Stadtentwicklung KW - urban regeneration KW - iconic architecture KW - influence of architecture Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210128-43517 N1 - Dissertation and Appendix (Folder + CD) to conferral of the academic degree Doctor of Engineering (Dr.-Ing.) at the Faculty of Architecture of the Bauhaus University Weimar, submitted by Reshetnikova Tatiana Sergeevna M.Design, Diploma in “Design” Date of birth 29\11\1984 Weimar, 2020 Supervisor Prof. Dr. phil. habil. Frank Eckardt Reviewers Prof. Dr. phil. habil. Frank Eckardt Prof. Vitaly Stadnikov (PhD) Date of the disputation: 22.01.2021 ER - TY - THES A1 - Berhe, Asgedom Haile T1 - Mitigating Risks of Corruption in Construction: A theoretical rationale for BIM adoption in Ethiopia N2 - This PhD thesis sets out to investigate the potentials of Building Information Modeling (BIM) to mitigate risks of corruption in the Ethiopian public construction sector. The wide-ranging capabilities and promises of BIM have led to the strong perception among researchers and practitioners that it is an indispensable technology. Consequently, it has become the frequent subject of science and research. Meanwhile, many countries, especially the developed ones, have committed themselves to applying the technology extensively. Increasing productivity is the most common and frequently cited reason for that. However, both technology developers and adopters are oblivious to the potentials of BIM in addressing critical challenges in the construction sector, such as corruption. This particularly would be significant in developing countries like Ethiopia, where its problems and effects are acute. Studies reveal that bribery and corruption have long pervaded the construction industry worldwide. The complex and fragmented nature of the sector provides an environment for corruption. The Ethiopian construction sector is not immune from this epidemic reality. In fact, it is regarded as one of the most vulnerable sectors owing to varying socio-economic and political factors. Since 2015, Ethiopia has started adopting BIM, yet without clear goals and strategies. As a result, the potential of BIM for combating concrete problems of the sector remains untapped. To this end, this dissertation does pioneering work by showing how collaboration and coordination features of the technology contribute to minimizing the opportunities for corruption. Tracing loopholes, otherwise, would remain complex and ineffective in the traditional documentation processes. Proceeding from this anticipation, this thesis brings up two primary questions: what are areas and risks of corruption in case of the Ethiopian public construction projects; and how could BIM be leveraged to mitigate these risks? To tackle these and other secondary questions, the research employs a mixed-method approach. The selected main research strategies are Survey, Grounded Theory (GT) and Archival Study. First, the author disseminates an online questionnaire among Ethiopian construction engineering professionals to pinpoint areas of vulnerability to corruption. 155 responses are compiled and scrutinized quantitatively. Then, a semi-structured in-depth interview is conducted with 20 senior professionals, primarily to comprehend opportunities for and risks of corruption in those identified highly vulnerable project stages and decision points. At the same time, open interviews (consultations) are held with 14 informants to be aware of state of the construction documentation, BIM and loopholes for corruption in the country. Consequently, these qualitative data are analyzed utilizing the principles of GT, heat/risk mapping and Social Network Analysis (SNA). The risk mapping assists the researcher in the course of prioritizing corruption risks; whilst through SNA, methodically, it is feasible to identify key actors/stakeholders in the corruption venture. Based on the generated research data, the author constructs a [substantive] grounded theory around the elements of corruption in the Ethiopian public construction sector. This theory, later, guides the subsequent strategic proposition of BIM. Finally, 85 public construction related cases are also analyzed systematically to substantiate and confirm previous findings. By ways of these multiple research endeavors that is based, first and foremost, on the triangulation of qualitative and quantitative data analysis, the author conveys a number of key findings. First, estimations, tender document preparation and evaluation, construction material as well as quality control and additional work orders are found to be the most vulnerable stages in the design, tendering and construction phases respectively. Second, middle management personnel of contractors and clients, aided by brokers, play most critical roles in corrupt transactions within the prevalent corruption network. Third, grand corruption persists in the sector, attributed to the fact that top management and higher officials entertain their overriding power, supported by the lack of project audits and accountability. Contrarily, individuals at operation level utilize intentional and unintentional 'errors’ as an opportunity for corruption. In light of these findings, two conceptual BIM-based risk mitigation strategies are prescribed: active and passive automation of project audits; and the monitoring of project information throughout projects’ value chain. These propositions are made in reliance on BIM’s present dimensional capabilities and the promises of Integrated Project Delivery (IPD). Moreover, BIM’s synchronous potentials with other technologies such as Information and Communication Technology (ICT), and Radio Frequency technologies are topics which received a treatment. All these arguments form the basis for the main thesis of this dissertation, that BIM is able to mitigate corruption risks in the Ethiopian public construction sector. The discourse on the skepticisms about BIM that would stem from the complex nature of corruption and strategic as well as technological limitations of BIM is also illuminated and complemented by this work. Thus, the thesis uncovers possible research gaps and lays the foundation for further studies. KW - Building Information Modeling KW - Korruption KW - Risikomanagement KW - Äthiopien KW - Corruption KW - BIM KW - Risk management KW - Construction KW - Ethiopia Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20211007-45175 ER - TY - THES A1 - Hörold, Stefan T1 - Leistungsbezogene Musterjahresganglinien für den Straßenbetriebsdienst N2 - In den letzten Jahrzehnten unterlag der Straßenbetriebsdienst tiefgreifenden Veränderungen. Diese Veränderungen schließt auch die betriebliche Steuerungsphilosophie ein, um eine planungsrationale und ökonomische Gestaltung des Straßenbetriebsdienstes zu unterstützen. Dabei erfolgt eine verbindliche Vorgabe der Leistungsinhalte und -umfänge und ermöglicht eine Budgetierung für das vorgesehene Jahresarbeitsprogramm. Ziel der Untersuchung ist die Entwicklung eines Modells für die Ermittlung von leistungsbezogenen Musterjahresganglinien zur Unterstützung der Jahresarbeitsplanung. Dafür lagen für jede Leistung des Leistungsbereiches „Grünpflege“ jeweils 260 einzelne Jahresganglinien vor. Im Ergebnis der Untersuchung wird die leistungsbezogene Musterjahresganglinie in vier Schritten ermittelt. Im ersten Schritt erfolgt die Prüfung der Datenqualität; im zweiten Schritt eine Korrelationsanalyse; im dritten Schritt die fachliche Überprüfung der Leistungsausprägung und im vierten Schritt die Ermittlung der leistungsbezogenen Musterjahresganglinie aus den verbliebenen leistungsbezogenen Jahresganglinien. T3 - Schriften der Professur Baubetrieb und Bauverfahren - 40 KW - Straßenbetriebsdienst KW - Budgetierung KW - Arbeitsplanung KW - Ergebnisorientierte Steuerung KW - Musterjahresganglinien KW - Jahresarbeitsplanung Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210830-44910 ER - TY - THES A1 - Harirchian, Ehsan T1 - Improved Rapid Assessment of Earthquake Hazard Safety of Existing Buildings Using a Hierarchical Type-2 Fuzzy Logic Model N2 - Although it is impractical to avert subsequent natural disasters, advances in simulation science and seismological studies make it possible to lessen the catastrophic damage. There currently exists in many urban areas a large number of structures, which are prone to damage by earthquakes. These were constructed without the guidance of a national seismic code, either before it existed or before it was enforced. For instance, in Istanbul, Turkey, as a high seismic area, around 90% of buildings are substandard, which can be generalized into other earthquakeprone regions in Turkey. The reliability of this building stock resulting from earthquake-induced collapse is currently uncertain. Nonetheless, it is also not feasible to perform a detailed seismic vulnerability analysis on each building as a solution to the scenario, as it will be too complicated and expensive. This indicates the necessity of a reliable, rapid, and computationally easy method for seismic vulnerability assessment, commonly known as Rapid Visual Screening (RVS). In RVS methodology, an observational survey of buildings is performed, and according to the data collected during the visual inspection, a structural score is calculated without performing any structural calculations to determine the expected damage of a building and whether the building needs detailed assessment. Although this method might save time and resources due to the subjective/qualitative judgments of experts who performed the inspection, the evaluation process is dominated by vagueness and uncertainties, where the vagueness can be handled adequately through the fuzzy set theory but do not cover all sort of uncertainties due to its crisp membership functions. In this study, a novel method of rapid visual hazard safety assessment of buildings against earthquake is introduced in which an interval type-2 fuzzy logic system (IT2FLS) is used to cover uncertainties. In addition, the proposed method provides the possibility to evaluate the earthquake risk of the building by considering factors related to the building importance and exposure. A smartphone app prototype of the method has been introduced. For validation of the proposed method, two case studies have been selected, and the result of the analysis presents the robust efficiency of the proposed method. KW - Fuzzy-Logik KW - Erdbebensicherheit KW - Fuzzy logic KW - RC Buildings KW - Rapid Visual Assessment KW - Seismic Vulnerability KW - Uncertainty Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210326-43963 ER - TY - THES A1 - Spröte, Daniel T1 - Immobilienportfoliomanagement öffentlicher musealer Schlösserverwaltungen - Daten zur Investitionssteuerung N2 - Die Arbeit leistet einen wissenschaftlichen Beitrag zur Erforschung der Einsatzmöglichkeiten eines Immobilienportfoliomanagements für öffentliche museale Schlösserverwaltungen in Deutschland. Insbesondere wird ein für deren Organisation spezifisches Modell zur Investitionssteuerung herausgearbeitet und dessen Anwendbarkeit in der Praxis mit Experten diskutiert. KW - Unbewegliche Sache KW - Portfoliomanagement KW - Museum KW - Schloss KW - Investition Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210510-44260 ER - TY - THES A1 - Müller, Matthias T1 - Frost-Tausalz-Angriff auf Beton - Neue Erkenntnisse zum Schadensmechanismus N2 - Für die Verminderung der betonspezifischen CO2-Emissionen wird ein verstärkter Einsatz klinkerreduzierter Zemente bzw. Betone angestrebt. Die Reduzierung des Klinkergehaltes darf jedoch nicht zu einer lebensdauerrelevanten Beeinträchtigung der Betondauerhaftigkeit führen. In diesem Zusammenhang stellt der Frost-Tausalz-Widerstand eine kritische Größe dar, da er bei höheren Klinkersubstitutionsraten häufig negativ beeinflusst wird. Erschwerend kommt hinzu, dass für klinkerreduzierte Betone nur ein unzureichender Erfahrungsschatz vorliegt. Ein hoher Frost-Tausalz-Widerstand kann daher nicht ausschließlich anhand deskriptiver Vorgaben gewährleistet werden. Demgemäß sollte perspektivisch auch für frost-tausalzbeanspruchte Bauteile eine performancebasierte Lebensdauerbetrachtung erfolgen. Eine unverzichtbare Grundlage für das Erreichen dieser Ziele ist ein Verständnis für die Schadensvorgänge beim Frost-Tausalz-Angriff. Der Forschungsstand ist jedoch geprägt von widersprüchlichen Schadenstheorien. Somit wurde als Zielstellung für diese Arbeit abgeleitet, die existierenden Schadenstheorien unter Berücksichtigung des aktuellen Wissensstandes zu bewerten und mit eigenen Untersuchungen zu prüfen und einzuordnen. Die Sichtung des Forschungsstandes zeigte, dass nur zwei Theorien das Potential haben, den Frost-Tausalz-Angriff umfassend abzubilden – die Glue Spall Theorie und die Cryogenic Suction Theorie. Die Glue Spall Theorie führt die Entstehung von Abwitterungen auf die mechanische Schädigung der Betonoberfläche durch eine anhaftende Eisschicht zurück. Dabei sollen nur bei moderaten Tausalzkonzentrationen in der einwirkenden Lösung kritische Spannungszustände in der Eisschicht auftreten, die eine Schädigung der Betonoberfläche hervorrufen können. In dieser Arbeit konnte jedoch nachgewiesen werden, dass starke Abwitterungen auch bei Tausalz¬konzentrationen auftreten, bei denen eine mechanische Schädigung des Betons durch das Eis auszuschließen ist. Damit wurde die fehlende Eignung der Glue Spall Theorie aufgezeigt. Die Cryogenic Suction Theorie fußt auf den eutektischen Eigenschaften von Tausalz-lösungen, die im gefrorenen Zustand immer als Mischung auf festem Wassereis und flüssiger, hochkonzentrierter Salzlösung bestehen, solange ihre Eutektikumstemperatur nicht unter¬schritten wird. Die flüssige Phase im salzhaltigen Eis stellt für gefrorenen Beton ein bisher nicht berücksichtigtes Flüssigkeitsreservoir dar, welches trotz der hohen Salzkonzentration die Eisbildung in der Betonrandzone verstärken und so die Entstehung von Abwitterungen verursachen soll. In dieser Arbeit wurde bestätigt, dass die Eisbildung im Zementstein beim Gefrieren in hochkonzentrierter Tausalzlösung tatsächlich verstärkt wird. Das Ausmaß der zusätzlichen Eisbildung wurde dabei auch von der Fähigkeit des Zementsteins zur Bindung von Chloridionen aus der Tausalzlösung beeinflusst. Zusammenfassend wurde festgestellt, dass die Cryogenic Suction Theorie eine gute Beschreibung des Frost-Tausalz-Angriffes darstellt, aber um weitere Aspekte ergänzt werden muss. Die Berücksichtigung der intensiven Sättigung von Beton durch den Prozess der Mikroeislinsenpumpe stellt hier die wichtigste Erweiterung dar. Basierend auf dieser Überlegung wurde eine kombinierte Schadenstheorie aufgestellt. Wichtige Annahmen dieser Theorie konnten experimentell bestätigt werden. Im Ergebnis wurde so die Grundlage für ein tiefergehendes Verständnis des Frost-Tausalz-Angriffes geschaffen. Zudem wurde ein neuer Ansatz identifiziert, um die (potentielle) Verringerung des Frost-Tausalz-Widerstandes klinkerreduzierter Betone zu erklären. N2 - The reduction of the cement clinker content is an important prerequisite for the improvement of the CO2-footprint of concrete. Nevertheless, the durability of such concretes must be sufficient to guarantee a satisfactory service life of structures. Salt frost scaling resistance is a critical factor in this regard, as it is often diminished at increased clinker substitution rates. Furthermore, only insufficient long-term experience for such concretes exists. A high salt frost scaling resistance thus cannot be achieved by applying only descriptive criteria, such as the concrete composition. It is therefore to be expected, that in the long term a performance based service life prediction will replace the descriptive concept. To achieve the important goal of clinker reduction for concretes also in cold and temperate climates it is important to understand the underlying mechanisms for salt frost scaling. However, conflicting damage theories dominate the current State of the Art. It was consequently derived as the goal of this thesis to evaluate existing damage theories and to examine them experimentally. It was found that only two theories have the potential to describe the salt frost attack satisfactorily – the glue spall theory and the cryogenic suction theory. The glue spall theory attributes the surface scaling to the interaction of an external ice layer with the concrete surface. Only when moderate amounts of deicing salt are present in the test solution the resulting mechanical properties of the ice can cause scaling. However, the results in this thesis indicate that severe scaling also occurs at deicing salt levels, at which the ice is much too soft to damage concrete. Thus, the inability of the glue spall theory to account for all aspects of salt frost scaling was shown. The cryogenic suction theory is based on the eutectic behavior of salt solutions, which consist of two phases – water ice and liquid brine – between the freezing point and the eutectic temperature. The liquid brine acts as an additional moisture reservoir, which facilitates the growth of ice lenses in the surface layer of the concrete. The experiments in this thesis confirmed, that the ice formation in hardened cement paste increases due to the suction of brine at sub-zero temperatures. The extent of additional ice formation was influenced mainly by the porosity and by the chloride binding capacity of the hardened cement paste. Consequently, the cryogenic suction theory plausibly describes the actual generation of scaling, but it has to be expanded by some crucial aspects to represent the salt frost scaling attack completely. The most important aspect is the intensive saturation process, which is ascribed to the so-called micro ice lens pump. Therefore a combined damage theory was proposed, which considers multiple saturation processes. Important aspects of this combined theory were confirmed experimentally. As a result, the combined damage theory constitutes a good basis to understand the salt frost scaling attack on concrete on a fundamental level. Furthermore, a new approach was identified, to account for the reduced salt frost scaling resistance of concretes with reduced clinker content. KW - Beton KW - Frost KW - Beton KW - Frost-Tausalz-Angriff KW - Schadensmechanismus KW - Concrete KW - Salt-Frost-Attack Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210922-45025 ER - TY - THES A1 - Fauth, Judith T1 - Ein handlungsorientiertes Entscheidungsmodell zur Feststellung der Genehmigungsfähigkeit von Bauvorhaben N2 - Die Auseinandersetzung mit der Digitalisierung ist in den letzten Jahren in den Medien, auf Konferenzen und in Ausschüssen der Bau- und Immobilienbranche angekommen. Während manche Bereiche Neuerungen hervorbringen und einige Akteure als Pioniere zu bezeichnen sind, weisen andere Themen noch Defizite hinsichtlich der digitalen Transformation auf. Zu dieser Kategorie kann auch das Baugenehmigungsverfahren gezählt werden. Unabhängig davon, wie Architekten und Ingenieure in den Planungsbüros auf innovative Methoden setzen, bleiben die Bauvorlagen bisher zuhauf in Papierform oder werden nach der elektronischen Einreichung in der Behörde ausgedruckt. Vorhandene Ressourcen, beispielsweise in Form eines Bauwerksinformationsmodells, die Unterstützung bei der Baugenehmigungsfeststellung bieten können, werden nicht ausgeschöpft. Um mit digitalen Werkzeugen eine Entscheidungshilfe für die Baugenehmigungsbehörden zu erarbeiten, ist es notwendig, den Ist-Zustand zu verstehen und Gegebenheiten zu hinterfragen, bevor eine Gesamtautomatisierung der innerbehördlichen Vorgänge als alleinige Lösung zu verfolgen ist. Mit einer inhaltlich-organisatorischen Betrachtung der relevanten Bereiche, die Einfluss auf die Baugenehmigungsfeststellung nehmen, wird eine Optimierung des Baugenehmigungsverfahrens in den Behörden angestrebt. Es werden die komplexen Bereiche, wie die Gesetzeslage, der Einsatz von Technologie aber auch die subjektiven Handlungsalternativen, ermittelt und strukturiert. Mit der Entwicklung eines Modells zur Feststellung der Baugenehmigungsfähigkeit wird sowohl ein Verständnis für Einflussfaktoren vermittelt als auch eine Transparenzsteigerung für alle Beteiligten geschaffen. Neben einer internationalen Literaturrecherche diente eine empirische Studie als Untersuchungsmethode. Die empirische Studie wurde in Form von qualitativen Experteninterviews durchgeführt, um den Ist-Zustand im Bereich der Baugenehmigungsverfahren festzustellen. Das erhobene Datenmaterial wurde aufbereitet und anschließend einer softwaregestützten Inhaltsanalyse unterzogen. Die Ergebnisse wurden in Kombination mit den Erkenntnissen der Literaturrecherche in verschiedenen Analysen als Modellgrundlage aufgearbeitet. Ergebnis der Untersuchung stellt ein Entscheidungsmodell dar, welches eine Lücke zwischen den gegenwärtigen Abläufen in den Baubehörden und einer Gesamtautomatisierung der Baugenehmigungsprüfung schließt. Die prozessorientierte Strukturierung entscheidungsrelevanter Sachverhalte im Modell ermöglicht eine Unterstützung bei der Baugenehmigungsfeststellung für Prüfer und Antragsteller. Das theoretische Modell konnte in Form einer Webanwendung in die Praxis übertragen werden. N2 - In recent years, the debate on digitization has been a topic of discussion in the media, at conferences and in committees of the construction and real estate industry. While some areas are producing innovations and some actors can be called pioneers, others still have deficits with regard to the digital transformation. The building permit process can also be considered among this category. Regardless of how architects and engineers use innovative methods in the planning offices, building applications are still often in paper form or are printed out after electronic submission to the authorities. Existing resources, for example in the form of a building information model, which can provide support in obtaining building permits, are not being utilized. In order to develop a decision support for the building authorities with digital tools, it is necessary to understand the actual conditions and to question the circumstances before an overall automation of the internal official processes can be pursued as the sole solution. With a content-based organizational view of the relevant components, which take influence on the building permit determination, an optimization of the building permit procedure in the authorities is aimed at. The complex components, such as the legal situation, the use of technology, but also the subjective alternatives for action, have to be determined and structured. The development of a model for determining building permit ability provides both an understanding of influencing factors and an increase in transparency for all parties involved. In addition to an international literature review, an empirical study served as a method of investigation. The empirical study was conducted in the form of qualitative expert interviews to determine the current state in the field of building permit procedures. The collected data material was prepared and subjected to a software-supported content analysis. In combination with the results of the literature review, the results were processed in various analyses as a model basis. The result of the investigation represents a decision model which closes a gap between the current processes at the building authorities and an overall automation of the building permit review. The process-oriented structuring of decision-relevant factors in the model enables support for the reviewers and the applicants during the building permit assessment. The theoretical model could be transferred into practice in the form of a web application. T3 - Schriften der Professur Baubetrieb und Bauverfahren - 39 KW - Baugenehmigung KW - Entscheidungsmodell KW - Bauantrag KW - Prozessmanagement KW - Projektmanagement KW - Building Permit KW - Decision-making KW - Building application KW - Process management KW - Project management Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210928-45093 UR - https://e-pub.uni-weimar.de/opus4/frontdoor/index/index/docId/4602 SN - 978-3-95773-299-6 N1 - Die englische Übersetzung der Dissertation ist unter https://doi.org/10.25643/bauhaus-universitaet.4602 erfasst und hier als URL Link hinterleg PB - Bauhaus-Universitätsverlag CY - Ilmtal-Weinstraße ER - TY - THES A1 - Bianco, Marcelo José T1 - Coupling between Shell and Generalized Beam Theory (GBT) elements N2 - In the last decades, Finite Element Method has become the main method in statics and dynamics analysis in engineering practice. For current problems, this method provides a faster, more flexible solution than the analytic approach. Prognoses of complex engineer problems that used to be almost impossible to solve are now feasible. Although the finite element method is a robust tool, it leads to new questions about engineering solutions. Among these new problems, it is possible to divide into two major groups: the first group is regarding computer performance; the second one is related to understanding the digital solution. Simultaneously with the development of the finite element method for numerical solutions, a theory between beam theory and shell theory was developed: Generalized Beam Theory, GBT. This theory has not only a systematic and analytical clear presentation of complicated structural problems, but also a compact and elegant calculation approach that can improve computer performance. Regrettably, GBT was not internationally known since the most publications of this theory were written in German, especially in the first years. Only in recent years, GBT has gradually become a fertile research topic, with developments from linear to non-linear analysis. Another reason for the misuse of GBT is the isolated application of the theory. Although recently researches apply finite element method to solve the GBT's problems numerically, the coupling between finite elements of GBT and other theories (shell, solid, etc) is not the subject of previous research. Thus, the main goal of this dissertation is the coupling between GBT and shell/membrane elements. Consequently, one achieves the benefits of both sides: the versatility of shell elements with the high performance of GBT elements. Based on the assumptions of GBT, this dissertation presents how the separation of variables leads to two calculation's domains of a beam structure: a cross-section modal analysis and the longitudinal amplification axis. Therefore, there is the possibility of applying the finite element method not only in the cross-section analysis, but also the development for an exact GBT's finite element in the longitudinal direction. For the cross-section analysis, this dissertation presents the solution of the quadratic eigenvalue problem with an original separation between plate and membrane mechanism. Subsequently, one obtains a clearer representation of the deformation mode, as well as a reduced quadratic eigenvalue problem. Concerning the longitudinal direction, this dissertation develops the novel exact elements, based on hyperbolic and trigonometric shape functions. Although these functions do not have trivial expressions, they provide a recursive procedure that allows periodic derivatives to systematise the development of stiffness matrices. Also, these shape functions enable a single-element discretisation of the beam structure and ensure a smooth stress field. From these developments, this dissertation achieves the formulation of its primary objective: the connection of GBT and shell elements in a mixed model. Based on the displacement field, it is possible to define the coupling equations applied in the master-slave method. Therefore, one can model the structural connections and joints with finite shell elements and the structural beams and columns with GBT finite element. As a side effect, the coupling equations limit the displacement field of the shell elements under the assumptions of GBT, in particular in the neighbourhood of the coupling cross-section. Although these side effects are almost unnoticeable in linear analysis, they lead to cumulative errors in non-linear analysis. Therefore, this thesis finishes with the evaluation of the mixed GBT-shell models in non-linear analysis. T3 - ISM-Bericht // Institut für Strukturmechanik, Bauhaus-Universität Weimar - 2021,2 KW - Biegetheorie KW - Finite Elemente Methode KW - Generalized Bean Theory KW - Finite Element KW - Thin-walled Structures KW - Cross-Section Warping KW - Cross-Section Distortion KW - Verallgemeinerte Technische Biegetheorie Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210315-43914 ER - TY - THES A1 - Fauth, Judith T1 - A process-oriented decision model for determining the permitability of construction projects N2 - In recent years, the discussion of digitalization has arrived in the media, at conferences, and in committees of the construction and real estate industry. While some areas are producing innovations and some contributors can be described as pioneers, other topics still show deficits with regard to digital transformation. The building permit process can also be counted in this category. Regardless of how architects and engineers in planning offices rely on innovative methods, building documents have so far remained in paper form in too many cases, or are printed out after electronic submission to the authority. Existing resources – for example in the form of a building information model, which could provide support in the building permit process – are not being taken advantage of. In order to use digital tools to support decision-making by the building permit authorities, it is necessary to understand the current situation and to question conditions before pursuing the overall automation of internal authority processes as the sole solution. With a substantive-organizational consideration of the relevant areas that influence building permit determination, an improvement of the building permit procedure within authorities is proposed. Complex areas – such as legal situations, the use of technology, as well as the subjective alternative action – are determined and structured. With the development of a model for the determination of building permitability, both an understanding of influencing factors is conveyed and an increase in transparency for all parties involved is created. In addition to an international literature review, an empirical study served as the research method. The empirical study was conducted in the form of qualitative expert interviews in order to determine the current state in the field of building permit procedures. The collected data material was processed and subsequently subjected to a software-supported content analysis. The results were processed, in combination with findings from the literature review, in various analyses to form the basis for a proposed model. The result of the study is a decision model that closes the gap between the current processes within the building authorities and an overall automation of the building permit review process. The model offers support to examiners and applicants in determining building permit eligibility, through its process-oriented structuring of decision-relevant facts. The theoretical model could be transferred into practice in the form of a web application. KW - Baugenehmigung KW - Entscheidungsmodell KW - Bauantrag KW - Prozessmanagement KW - Projektmanagement KW - Building permit KW - Building application KW - Decision-making KW - Process management KW - Project management Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220309-46020 UR - https://e-pub.uni-weimar.de/opus4/frontdoor/index/index/docId/4509 N1 - This work is a translation of the original dissertation (German language) which is accessible at: https://doi.org/10.25643/bauhaus-universitaet.4509 and deposited here as URL link. ER -