TY - CHAP A1 - Kitagawa, Estuji A1 - Tanaka, Shigenori A1 - Furuta, Hitoshi T1 - A research about the automatic construction of Web/3D model house from 2D digital pictures N2 - In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise. KW - Architektur KW - Verteiltes System KW - Dreidimensionales CAD Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1702 ER - TY - CHAP A1 - König, Markus A1 - Klinger, Axel A1 - Berkhahn, Volker T1 - Structural Correctness of Planning Processes in Building Engineering N2 - The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Planungsprozess KW - Konsistenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1690 ER - TY - CHAP A1 - Perevalova, Julia A1 - Pahl, Peter Jan T1 - Structural and Functional Dependence of Objects in Data Bases N2 - Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Objektorientierung KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1683 ER - TY - CHAP A1 - Keller, Martin A1 - Antoniadis, George A1 - Menzel, Karsten T1 - Resource Management for the Construction Industry N2 - The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Betriebsmittel Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1679 ER - TY - CHAP A1 - Huhnt, Wolfgang T1 - Progress Measurement in Planning Processes on the Base of Process Models N2 - This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmodell KW - Bauablauf Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1664 ER - TY - CHAP A1 - Zaneldin, Essam T1 - Investigate the Impact of Different Resource Allocation Strategies on the Design of Building Projects Using Simulation N2 - The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Simulation KW - Bauvorhaben Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1658 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Klauer, Thomas T1 - Internet-based Workflow-Management for Civil Engineering Projects N2 - The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1647 ER - TY - CHAP A1 - Biltchouk, Irina A1 - Pahl, Peter Jan T1 - Interaction of Data Bases and Graphical Interfaces in Civil Engineering N2 - Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Graphische Benutzeroberfläche KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1636 ER - TY - CHAP A1 - Palm, Johan T1 - Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment N2 - The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1625 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Gutzke, Thomas T1 - Groundwater-Monitoring based on dynamic co-operative eGovernment-Processes N2 - As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Grundwasser KW - Monitorüberwachung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1611 ER - TY - CHAP A1 - El-Rayes, Khaled A1 - Kandil, Amr T1 - Distributed Computing for the Optimization of Large-Scale Construction Projects N2 - Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Verteiltes System KW - Planung KW - Großbaustelle KW - Optimal Planning Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1601 ER - TY - CHAP A1 - Kopyto, Martin A1 - Petersen, Michael A1 - Diaz, Joaquin T1 - Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects N2 - The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1599 ER - TY - CHAP A1 - Freundt, Martin A1 - Beucke, Karl T1 - A flexible model for scheduling building processes based on graph theory and fuzzy numbers N2 - The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Scheduling KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1587 ER - TY - CHAP A1 - Katzer, Wolfgang T1 - Virtual Construction for our industry – an advantage now, a necessity soon N2 - Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented. KW - Konstruktion KW - construction industry Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1573 ER - TY - CHAP A1 - Cheng, Jinxing A1 - Lau, Gloria A1 - Law, Kincho T1 - A simulation access language and framework for project management applications N2 - As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1567 ER - TY - CHAP A1 - Swaddiwudhipong, Somsak A1 - Tho, Kee Kiat A1 - Liu, Zishun T1 - Material characterization using artificial neural network N2 - Indentation experiments have been carried out over the past century to determine hardness of materials. Modern indentation machines have the capability to continuously monitor load and displacement to high precision and accuracy. In recent years, research interests have focussed on methods to extract material properties from indentation load-displacement curves. Analytical methods to interpret the indentation load-displacement curves are difficult to formulate due to material and geometric nonlinearities as well as complex contact interactions. In the present study, an artificial neural network model was constructed for interpretation of indentation load-displacement curves. Large strain-large deformation finite element analyses were first carried out to simulate indentation experiments. The data from finite element analyses were then used to train the artificial neural network model. The artificial neural network model was able to accurately determine the material properties when presented with load-displacement curves which were not used in the training process. The proposed artificial neural network model is robust and directly relates the characteristics of the indentation loaddisplacement curve to the elasto-plastic material properties. KW - Neuronales Netz KW - Wasserbau KW - Werkstoffprüfung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1550 ER - TY - CHAP A1 - Taha, M. M. Reda A1 - Sherif, Alaa A1 - Hegger, Josef T1 - A nouvelle approach for predicting the shear cracking angle in RC and PC beams using artificial neural networks N2 - The truss model for predicting shear resistance of reinforced concrete beams has usually been criticized because of its underestimation of the concrete shear strength especially for beams with low shear reinforcement. Two challengers are commonly encountered in any truss model and are responsible for its inaccurate shear strength prediction. First: the cracking angle is usually assumed empirically and second the shear contribution of the arching action is usually neglected. This research introduces a nouvelle approach, by using Artificial Neural Network (ANN) for accurately evaluating the shear cracking angle of reinforced and prestressed concrete beams. The model inputs include the beam geometry, concrete strength, the shear reinforcement ratio and the prestressing stress if any. ... KW - Neuronales Netz KW - Wasserbau KW - Scherung KW - Rissbildung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1071 ER - TY - CHAP A1 - Schneider, Mike T1 - Radio Frequency Identification (RFID) Technology and its Applications in the Commercial Construction Industry N2 - This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole. KW - RFID KW - Automatische Identifikation KW - Materialflusssteuerung KW - Bauindustrie Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1061 ER - TY - CHAP A1 - Miles, John A1 - Cen, Mei A1 - Taylor, Mark T1 - Linking Sketching and Constraint Checking for Early Conceptual Design N2 - At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients. KW - Konzipieren KW - Bauwerk KW - Management KW - Constraintnetz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1547 ER - TY - CHAP A1 - Hänninen, Reijo A1 - Laine, Tuomas T1 - Product Models and Life Cycle Data Management in real Projects N2 - Building project, with many different players involved, requires open and commonly accepted standard for product model description. Product model based design tools support easy comparisons of design alternatives and optimisation of design solution technical quality. This supports client s decision-making and design target comparisons through the whole building project. Use of product models enable these tasks to meet both schedule and cost requirements Olof Granlund is using product models and interoperable software as the main tool in projects. The use and the realised benefits are illustrated by examples from 3 different real projects: University building, where product models were used already in the very early phases by the whole design team. Office building for research organisation, where product models were used in so called self-reporting building system. Headquarters for international company, where product models were widely used for building performance analysis and visualisations in design phase as well as for facilities management system configuration for operational phase. KW - Produktmodell KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1528 ER - TY - CHAP A1 - Rickelt, Christian A1 - Reese, Stefanie T1 - A model adaptive and model reduction strategy combining system-theoretical methods and substructuring N2 - This paper focuses on a new three-level discretisation strategy which enables the transition between continuum/structural (I) and structural/black box modelling (II). The transition (I) is realised by means of a model adaptive concept based on an innovative finite element technology. For transition (II) we apply the truncated balanced realisation method (TBR). The latter represents an established system theoretical model reduction technique which is here combined with a novel substructure technique. The approach provides a modular concept to facilitate the computational analysis of complex structures. The final goal is to apply the strategy to life time estimation. KW - Adaptives System Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1516 ER - TY - CHAP A1 - Gordon, Chris A1 - Akinci, Burcu A1 - Garrett, James H. T1 - An Approach for Planning Sensor-Based Inspection of the Built Environment N2 - The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site. KW - Monitorüberwachung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1500 ER - TY - CHAP A1 - Donath, Dirk A1 - Tonn, Christian T1 - Plausibility in Architectural Design - Software Support for the Architect-oriented Design of Colour Schemes for Interiors and Buildings N2 - The approach discussed here is part of research into an overall concept for digital instruments which support the entire planning process and help in enabling planning decisions to be based upon clear reasoning and plausible arguments. Such specialist systems must take into account currently available technology, such as networked working patterns, object-orientation, building and product models as well as the working method of the planner. The paper describes a plausibility instrument for the formulation of colour scheme proposals for building interiors and elevations. With the help of intuitively usable light simulations, colour, material and spatial concepts can be assessed realistically. The software prototype “Coloured Architecture” is conceived as a professional extension to conventional design tools for the modelling of buildings. As such it can be used by the architect in the earliest design phases of the planning process as well as for colour implementation on location. KW - CAD / Architektur KW - Farbenlehre Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1498 ER - TY - CHAP A1 - Alda, Sascha A1 - Cremers, Armin B. A1 - Bilek, Jochen T1 - Support of Collaborative Structural Design Processes through the Integration of Peer-to-Peer and Multiagent Architectures N2 - Structural engineering projects are increasingly organized in networked cooperations due to a permanently enlarged competition pressure and a high degree of complexity while performing the concurrent design activities. Software that intends to support such collaborative structural design processes implicates enormous requirements. In the course of our common research work, we analyzed the pros and cons of the application of both the peer-to-peer (University of Bonn) and multiagent architecture style (University of Bochum) within the field of collaborative structural design. In this paper, we join the benefits of both architecture styles in an integrated conceptual approach. We demonstrate the surplus value of the integrated multiagent–peer-to-peer approach by means of an example scenario in which several structural engineers are co-operatively designing the basic structural elements of an arched bridge, applying heterogeneous CAD systems. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Mehragentensystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1481 ER - TY - CHAP A1 - Lehner, Karlheinz A1 - Hartmann, Dietrich T1 - Scenarios for the deployment of distributed engineering applications N2 - Although there are some good reasons to design engineering software as a stand-alone application for a single computer, there are also numerous possibilities for creating distributed engineering applications, in particular using the Internet. This paper presents some typical scenarios how engineering applications can benefit from including network capabilities. Also, some examples of Internet-based engineering applications are discussed to show how the concepts presented can be implemented. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1476 ER - TY - CHAP A1 - Mundani, Ralf-Peter A1 - Bungartz, Hans-Joachim T1 - Octrees for Cooperative Work in a Network-Based Environment N2 - Assuring global consistency in a cooperative working environment is the main focus of many nowaday research projects in the field of civil engineering and others. In this paper, a new approach based on octrees will be discussed. It will be shown that by the usage of octrees not only the management and control of processes in a network-based working environment can be optimised but also an efficient integration platform for processes from various disciplines – such as architecture and civil engineering – can be provided. By means of an octree-based collision detection resp. consistency assurance a client-server-architecture will be described as well as sophisticated information services for a further support of cooperative work. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Oktalbaum Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1460 ER - TY - CHAP A1 - van Rooyen, G.C. A1 - Olivier, A. H. T1 - Notes on structural analysis in a distributed collaboratory N2 - The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Finite-Elemente-Methode Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1451 ER - TY - CHAP A1 - Meißner, Udo F. A1 - Rueppel, Uwe A1 - Theiss, Mirko T1 - Network-Based Fire Engineering Supported by Agents N2 - Building design in Civil Engineering is characterized by the cooperation of experts in multiple disciplines. Close cooperation of engineers in different fields is the basis of high product quality, short development periods and a minimum of investment costs. For each building the engineers have to create a new fire engineering model. The consistent realization of the fire engineering model in all details has high demands on communication, collaboration and building models. Thereby, to preserve the related design models consistent to each other and compatible with the rules of fire engineering is a complex task. In addition, regulations and guidelines vary according to the building location, so the knowledge base must be integrated dynamically into the planning process. This contribution covers the integration of engineers and design models into a cooperation network on the basis of mobile agents. The distributed models of architectural design, structural planning and fire engineering are supported. These models are implemented as XML-based models which can be accessed by mobile agents for information retrieval and for processing tasks. Agents are provided to all planners, they are enabled to check up the distributed design models with the knowledge base of the fire protection regulations,. With the use of such an agent each planner is supported to check up his planning for accordance with the fire protection requirements. The fire-engineering-agent analyzes the design and detects inconsistencies by processing fire protection requirements and design model facts in a rule-based expert system. The possibility to check the planning information at an early state in the sense of compatibility to the fire protection regulations enables a comprehensive diagnosis of the design and the reduction of planning errors. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Brandschutz KW - Mehragentensystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1447 ER - TY - CHAP A1 - Schley, Frank A1 - Mejstrik, Marcus A1 - Holz, K.-Peter T1 - Network Based Co-operation Platform for Geotechnical Engineering N2 - This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Geotechnik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1431 ER - TY - CHAP A1 - Eslimy-Isfahany, S. H. R. A1 - Pegels, Georg T1 - Net-distributed Co-operation Including Developing Countries, Practical Case Study - Iran N2 - The scientific transfer of key technology features to developing countries, together with adequate competence, localisation and adaptation, is the primary purpose of the proposed investigation. It is evident that introducing high-level CAD design and detailing will improve the planning process in developing countries. Successful utilization of applied information technology for the planning process, however, depends on the user-interface of individual software. Therefore, to open the great opportunity embedded in CAD software for clients globally, the language and character-set barrier of traditional user-interfaces must be overcome. A proposal for a research program is given here to address such issue in favour of global civil engineering. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Iran Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1421 ER - TY - CHAP A1 - Hartmann, Dietrich A1 - Meißner, Udo F. A1 - Rueppel, Uwe T1 - Integration of Productmodel Databases into Multi-Agent Systems N2 - This paper deals with two different agent-based approaches aimed at the incorporation of complex design information into multi-agent planning systems. The first system facilitates collaborative structural design processes, the second one supports fire engineering in buildings. Both approaches are part of two different research projects that belong to the DFG1 priority program 1103 entitled “Network-based Co-operative Planning Processes in Structural Engineering“ (DFG 2000). The two approaches provide similar database wrapper agents to integrate relevant design information into two multi-agent systems: Database wrapper agents make the relevant product model data usable for further agents in the multi-agent system, independent on their physical location. Thus, database wrapper agents act as an interface between multi-agent system and heterogeneous database systems. The communication between the database wrapper agents and other requesting agents presumes a common vocabulary: a specific database ontology that maps database related message contents into database objects. Hereby, the software-wrapping technology enables the various design experts to plug in existing database systems and data resources into a specific multi-agent system easily. As a consequence, dynamic changes in the design information of large collaborative engineering projects are adequately supported. The flexible architecture of the database wrapper agent concept is demonstrated by the integration of an XML and a relational database system. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Mehragentensystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1410 ER - TY - CHAP A1 - Gebbeken, Norbert A1 - Baumhauer, Andreas A1 - Ionita, Mihai T1 - Increasing the Reliability and Performance through Automatization and Parallel Working N2 - Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Parallelverarbeitung KW - Simulation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1397 ER - TY - CHAP A1 - Hartmann, Ulrich C. T1 - Collaboration in AEC Design : Web-enabling Applications using Peer-to-Peer Office Communicator N2 - A market analysis conducted by Gartner Dataquest in August 2001 has shown the typical characteristics of the AEC design process. High volatility in membership of AEC design groups and members dispersed over several external offices is the common collaboration scenario. Membership is most times short lived, compared to the overall duration of the process. A technical solution has to take that into account by making joining and leaving a collaborative work group very easy. The modelling of roles of collaboration between group members must be based on a commonly understood principle like the publisher / subscriber model, where the individual that is responsible for the distribution of vital information is clear. Security issues and trust in the confidentiality of the system is a central concern for the acceptance of the system. Therefore, keeping the subset of data that will be published under the absolute control of the publisher is a must. This is not the case with server-based scenarios, sometimes even due to psychological reasons. A loosely bound Peer-to-Peer network offers advantages over a server-based solution, because of less administrative overhead and simple installation procedures. In a peer-to-peer environment, a publish/subscribe role model can be more easily implemented. The publish/subscribe model matches the way AEC processes are modelled in real world scenarios today, where legal proof of information exchange between external offices is of high importance. Workflow management systems for small to midsize companies of the AEC industry may adopt the peer-to-peer approach to collaboration in the future. Further investigations are being made on the research level (WINDS) by integrating the viewer and redlining application Collaborate! into a collaborative environment. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Kommunikationsmodell Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1386 ER - TY - CHAP A1 - Lähr, André A1 - Bletzinger, Kai-Uwe T1 - Design of an Analysis Environment for Planning Decision Support N2 - In this contribution, the design of an analysis environment is presented, that supports an analyst to come to a decision within a gradual collaborative planning process. An analyst represents a project manager, planner or any other person, involved in the planning process. Today, planning processes are managed by several geographically distributed planners and project managers. Thus, complexity of such a process rises even more. Prediction of consequences of many planning decisions is not possible, in particular since assessment of a planning advance is not trivial. There have to be considered several viewpoints, that depend on individual perceptions. In the following, methods are presented to realize planning decision support. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Schlussfolgern Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1370 ER - TY - CHAP A1 - Miles, John A1 - Joita, Liviu A1 - Burnap, Peter T1 - Collaborative Engineering: Virtual Teams in a Grid Environment Supporting Consortia in the Construction Industry N2 - In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI). KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1362 ER - TY - CHAP A1 - Olivier, A. H. T1 - An application-centred framework for distributed engineering applications N2 - The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Framework Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1353 ER - TY - CHAP A1 - Yahiaoui, Azzedine A1 - Hensen, Jan A1 - Soethout, Luc T1 - Developing CORBA-based distributed control and building performance environments by run-time coupling N2 - Communication software and distributed applications for control and building performance simulation software must be reliable, efficient, flexible, and reusable. This paper reports on progress of a project, which aims to achieve better integrated building and systems control modeling in building performance simulation by run-time coupling of distributed computer programs. These requirements motivate the use of the Common Object Request Broker Architecture (CORBA), which offers sufficient advantage than communication within simple abstraction. However, set up highly available applications with CORBA is hard. Neither control modeling software nor building performance environments have simple interface with CORBA objects. Therefore, this paper describes an architectural solution to distributed control and building performance software tools with CORBA objects. Then, it explains how much the developement of CORBA based distributed building control simulation applications is difficult. The paper finishes by giving some recommendations. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - CORBA Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1347 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Meißner, Udo F. A1 - Greb, Steffen T1 - A Petri Net based Method for Distributed Process Modelling in Structural Engineering N2 - The contribution introduces a method for the distributed process modelling in order to support the process orientation in Structural Engineering, i.e., the modelling, analysis and management of planning processes. The approach is based on the Petri Net theory for the modelling of planning processes and workflows in Structural Engineering. Firstly, a central and coarse process model serves as a pre-structuring system for the detailed modelling of the technical planning activities. Secondly, the involved planning participants generate distributed process models with detailed technical workflow information. Finally, these distributed process models will be combined in the central workflow net. The final net is of great importance for the process orientation in Structural Engineering, i.e., the identification, publication, analysis, optimization and finally the management of planning processes. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Petri-Netz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1338 ER - TY - CHAP A1 - Garrett, James H. A1 - Akinci, Burcu A1 - Wang, Hongjun T1 - Towards Domain-Oriented Semi-Automated Model Matching for Supporting Data Exchange N2 - The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models. KW - Bauwerk KW - Datenmanagement KW - Datenaustausch Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1324 ER - TY - CHAP A1 - Boukamp, Frank A1 - Akinci, Burcu T1 - Towards Automated Defect Detection: Object-oriented Modeling of Construction Specifications N2 - This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system. KW - Bauwerk KW - Datenmanagement KW - Modellierung KW - Norm Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1315 ER - TY - CHAP A1 - Ward, Michael A1 - Thorpe, Tony A1 - Price, Andrew T1 - The Re-use of Site Data to Inform Business Processes N2 - The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure. KW - Bauwerk KW - Datenmanagement KW - Baustelle KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1308 ER - TY - CHAP A1 - Xie, Haiyan A1 - Issa, Raja A1 - O'Brien, William T1 - Structure of a Formal User Model for Construction Information Retrieval N2 - Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction. KW - Bauwerk KW - Datenmanagement KW - Benutzeroberfläche Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1296 ER - TY - CHAP A1 - Changwan, Kim A1 - Haas, Carl A1 - Caldas, Carlos T1 - Spatial data acquisition, integration, and modeling for real-time project life-cycle applications N2 - Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach. KW - Bauwerk KW - Datenmanagement KW - Echtzeitsystem KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1280 ER - TY - CHAP A1 - Petersen, Michael A1 - Seewald, Gerrit T1 - Establishing of fundamentals in building projects using web services N2 - During the establishing of fundamentals in a building project a huge amount of influence factors and boundary conditions have to be investigated in order to provide the prerequisites for further planning processes. These investigative tasks are often related with a great effort concerning time and money, because there are no standardized workflows and interfaces which provide an efficient access to the necessary information related to a specific construction site. Within the fundamental investigation human and natural circumstances have to be taken into account. Thus, in this project two examples have been chosen in order to demonstrate the holistic approach for an integration and provision of georeferenced information. The developed internet-site http://www.grundlagenermittlung.de has been designed to support architects and civil engineers in early planning phases of a building project efficiently. It offers web-based services based on dynamic interfaces for a flexible search and collection of information concerning the building site. Therefore, a central Metadatabase-Server for Description, Discovery and Integration has been established which enables a registration of georeferenced services and the redirection of incoming requests to other, distributed data pools. Using this Yellow-Page concept in combination with the underlying meta-data based on the ISO 19115 standard an efficient investigation of geographical and environmental information becomes possible. KW - Bauwerk KW - Datenmanagement KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1273 ER - TY - CHAP A1 - Pavlov, Alexander T1 - Data Transfer and Objects Recognition in Building Design N2 - The problem of data interoperability is now very important. The formal description of construction systems and objects must base upon the modeling for the description of construction data domain. The XML-language was selected as a basis of a universal data format, ensuring natural hierarchy of objects, flexibility, good layout and expandability. The language, developed by the author, is called Building Object Description Extensible Markup Language (bodXML). The types of all objects used by data transfer should be definite beforehand with existing methods of programming. It limits the possibilities of IT in application of new types. But the recipient software must recognize the building objects even if the kind of object is unknown at the outset. The author offers a set of main topological and geometric properties being sufficient for recognition of main three-dimensional building constructions with flat edges. The tests of artificial neuron network have shown that the recognition of a kind of the constructions represented as a set of indicated parameters happens enough confidently. KW - Bauwerk KW - Datenmanagement KW - Datenaustausch Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1265 ER - TY - CHAP A1 - Liu, Liang A1 - Soibelman, Lucio A1 - Wu, Jianfeng T1 - Data Fusion and Modeling for Construction Management Knowledge Discovery N2 - Advances in construction data analysis techniques have provided useful tools to discover explicit knowledge on historical databases supporting project managers’ decision making. However, in many situations, historical data are extracted and preprocessed for knowledge discovery based on time-consuming and problem-specific data preparation solutions, which often results in inefficiencies and inconsistencies. To overcome the problem, we are working on the development of a new data fusion methodology, which is designed to provide timely and consistent access to historical data for efficient and effective management knowledge discovery. The methodology is intended to be a new bridge between historical databases and data analysis techniques, which shields project managers from complex data preparation solutions, and enables them to use discovered knowledge for decision making more conveniently. This paper briefly describes the motivation, the background and the initial results of the ongoing research. KW - Bauwerk KW - Datenmanagement KW - Wissensverarbeitung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1254 ER - TY - CHAP A1 - Jianping, Zhang A1 - Tianyi, Ma A1 - Qiping, Shen T1 - Application of Data Warehouse and Data Mining in Construction Management N2 - All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper. KW - Bauwerk KW - Datenmanagement KW - Data-Warehouse-Konzept Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1247 ER - TY - CHAP A1 - Cheung, Moe M. S. A1 - Noruziaan, Bahman A1 - Li, W. C. T1 - Data acquisition, processing and management systems for a Canadian bridge monitoring project N2 - This paper will present a number of technical aspects for one of the most elaborate instrumentation and data acquisition projects ever undertaken in Canada. Confederation Bridge, the longest bridge built over ice covered seawater has been equipped with the state of the art data acquistition devices and systems as well as data transfer networks. The Bridge has been providing a fixed surface connection between Prince Edward Island and Province of New Brunswick in Canada since its opening in 1997. The Bridge has a rather long design service life of 100 years. Because of its large size and long span length, its design is not covered by any existing codes or standards worldwide. The focus of the paper is to introduce the data acquisition, transfer, processing and management systems. The instrumentation and communications infrastructure and devices will be presented in some details along with the data processing and management systems and techniques. Teams of engineers and researchers use the collected data to verify the analysis and design assumptions and parameters as well as investigate the short-term and long-term behaviour and health of the Bridge. The collected data are also used in furthering research activities in the field of bridge engineering and in elevating our knowledge about behaviour, reliability and durability of such complex structures, their components and materials. KW - Bauwerk KW - Datenmanagement KW - Brückenbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1235 ER - TY - CHAP A1 - Ma, Zhiliang A1 - Wong, K. D. A1 - Yang, Jun T1 - An Approach to Utilizing Exchanged Documents in Construction Projects Based on Data Warehouse Technology N2 - There are many construction projects in China and mass documents are exchanged among the multi-party, including the owner, the contractor and the engineer in the projects. Based on previous studies, an approach to the utilization of the exchanged documents is established by using data warehouse technology and a prototype system called EXPLYZER is developed. The approach and the prototype system are verified through their application in a construction project. It is concluded that the approach can support the decision-making in project management. KW - Bauwerk KW - Datenmanagement KW - Data-Warehouse-Konzept KW - Exchanged Documents KW - Managment Information System Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1227 ER - TY - CHAP A1 - Both, Petra von A1 - Kohler, Niklaus A1 - Gessmann, Robin T1 - A virtual life cycle structured platform for building applications N2 - The development of a life cycle structured cooperation platform is described, which is based on an integrated process and goal-oriented project model. Furthermore the structure of a life cycle oriented object structure model and its implementation in the platform are documented. The complete conceptual model is described, which represents the basis of a lifecycle -oriented structuring of the planning object and supports the thematic classification of the object and project management data. KW - Bauwerk KW - Datenmanagement KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1219 ER -