TY - CHAP A1 - Hauschild, Thomas A1 - Borrmann, André A1 - Hübler, Reinhard T1 - Integration of Constraints into Digital Building Models for Cooperative Planning Processes N2 - The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given. KW - Architektur KW - Verteiltes System KW - Constraint KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1775 ER - TY - CHAP A1 - Soibelman, Lucio A1 - O'Brien, William A1 - Elvin, George T1 - Collaborative Design Processes: A Class on Concurrent Collaboration in Multidisciplinary Design N2 - The rise of concurrent engineering in construction demands early team formation and constant communication throughout the project life cycle, but educational models in architecture, engineering and construction have been slow to adjust to this shift in project organization. Most students in these fields spend the majority of their college years working on individual projects that do not build teamwork or communication skills. Collaborative Design Processes (CDP) is a capstone design course where students from the University of Illinois at Urbana-Champaign and the University of Florida learn methods of collaborative design enhanced by the use of information technology. Students work in multidisciplinary teams to collaborate from remote locations via the Internet on the design of a facility. An innovation of this course compared to previous efforts is that students also develop process designs for the integration of technology into the work of multidisciplinary design teams. The course thus combines both active and reflective learning about collaborative design and methods. The course is designed to provide students the experience, tools, and methods needed to improve design processes and better integrate the use of technology into AEC industry work practices. This paper describes the goals, outcomes and significance of this new, interdisciplinary course for distributed AEC education. Differences from existing efforts and lessons learned to promote collaborative practices are discussed. Principal conclusions are that the course presents effective pedagogy to promote collaborative design methods, but faces challenges in both technology and in traditional intra-disciplinary training of students. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Computer Supported Cooperative Work Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1948 ER - TY - CHAP A1 - Keller, Martin A1 - Antoniadis, George A1 - Menzel, Karsten T1 - Resource Management for the Construction Industry N2 - The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Betriebsmittel Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1679 ER - TY - JOUR A1 - Likhitruangsilp, Veerasak A1 - Ioannou, Photios T1 - Risk-sensitive Markov Decision Process for Underground Construction Planning and Estimating N2 - This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference. KW - Mehragentensystem KW - Lernendes System KW - Tunnel KW - Markowschke KW - Kette Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2247 ER - TY - JOUR A1 - Yabuki, Nobuyoshi A1 - Kotani, Jun A1 - Shitani, Tomoaki T1 - A Steel Bridge Design System Architecture using VR-CAD and Web Service-based Multi-Agents N2 - This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system. KW - Mehragentensystem KW - Lernendes System KW - Stahlbrücke KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2146 ER - TY - CHAP A1 - Menzel, Karsten A1 - Dittrich, Jörg A1 - Domschke, Sven T1 - About the implantation process of mobile computing in AEC N2 - The AEC industry is conscious of the potentials arising from the usage of mobile computer systems to increase productivity by streamlining their business processes. Discussions are no longer on whether or not to use a mobile computer solution, but rather, on how it should be used. However, the implantation process of this new technology in Architecture, Engineering and Construction (AEC) and Facility Management (FM) practise is very slow and should be improved. One way to encourage and ease the usage of mobile computer systems in AEC is a more process-oriented usability and context appropriateness of mobile computer solutions. Context-sensitivity is defined as a crucial feature to be taken into account for further research in the area of Mobile Computing. Context-sensitive, mobile IT-solutions depend on two features: (1) flexible definitions of (construction) processes describing the context and (2) tools for flexible, multi-dimensional information management representing the context. It is on this premise that the authors propose the n-dimensional data management approach for the implementation of mobile computing solutions. In this paper, we analyse working scenarios in the AEC and FM sector, defining context aspects which are transformed and formalized as dimension hierarchies of the envisaged context model. KW - Mobile Computing KW - Funknetz KW - Bauwesen Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1106 ER - TY - JOUR A1 - van Treeck, Christoph A1 - Rank, Ernst T1 - Analysis of building structure and topology based on Graph Theory N2 - Individual views on a building product of people involved in the design process imply different models for planning and calculation. In order to interpret these geometrical, topological and semantical data of a building model we identify a structural component graph, a graph of room faces, a room graph and a relational object graph as aids and we explain algorithms to derive these relations. The application of the technique presented is demonstrated by the analysis and discretization of a sample model in the scope of building energy simulation. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Graphentheorie KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2308 ER - TY - CHAP A1 - Gordon, Chris A1 - Akinci, Burcu A1 - Garrett, James H. T1 - An Approach for Planning Sensor-Based Inspection of the Built Environment N2 - The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site. KW - Monitorüberwachung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1500 ER - TY - CHAP A1 - van Rooyen, G.C. A1 - Olivier, A. H. T1 - Notes on structural analysis in a distributed collaboratory N2 - The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Finite-Elemente-Methode Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1451 ER - TY - CHAP A1 - Cheng, Jinxing A1 - Lau, Gloria A1 - Law, Kincho T1 - A simulation access language and framework for project management applications N2 - As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1567 ER - TY - CHAP A1 - Jianping, Zhang A1 - Tianyi, Ma A1 - Qiping, Shen T1 - Application of Data Warehouse and Data Mining in Construction Management N2 - All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper. KW - Bauwerk KW - Datenmanagement KW - Data-Warehouse-Konzept Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1247 ER - TY - JOUR A1 - Weise, Matthias A1 - Katranuschkov, Peter A1 - Scherer, Raimar J. T1 - Generic Services for the Support of Evolving Building Model Data N2 - Many problems related to data integration in AEC can be better tackled by an approach that takes into account the heterogeneity of tasks, models and applications but does not require continuous consistency of the evolving design data, at each data management operation. Such an approach must incorporate adequate services that can facilitate reintegration of concurrently modified data at reasonably selected coordination points. In this paper we present a set of methods which, used in combination, can achieve that goal. After a description of the principal envisaged cooperative work scenario each of these methods is discussed in detail and current observations drawn from their software realisation are given. Whilst the suggested approach is valid for any EXPRESS-based data model, the practical focus of work has been on facilitating IFC-driven integration. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - EXPRESS Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2077 ER - TY - CHAP A1 - König, Markus A1 - Klinger, Axel A1 - Berkhahn, Volker T1 - Structural Correctness of Planning Processes in Building Engineering N2 - The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Planungsprozess KW - Konsistenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1690 ER - TY - JOUR A1 - Abdalla, Jamal T1 - Elements of an Agent-based Mediative Communication Protocol for Design Objects N2 - Integrated structural engineering system usually consists of large number of design objects that may be distributed across different platforms. These design objects need to communicate data and information among each other. For efficient communication among design objects a common communication protocol need to be defined. This paper presents the elements of a communication protocol that uses a mediator agent to facilitate communication among design objects. This protocol is termed the Mediative Communication Protocol (MCP). The protocol uses certain design communication performatives and the semantics of an Agent Communication language (ACL) mainly the Knowledge and Query Manipulation Language (KQML) to implement its steps. Details of a Mediator Agent, that will facilitate the communication among design objects, is presented. The Unified Modeling Language (UML) is used to present the Meditative protocol and show how the mediator agent can be use to execute the steps of the meditative communication protocol. An example from structural engineering application is presented to demonstrate and validate the protocol. It is concluded that the meditative protocol is a viable protocol to facilitate object-to-object communication and also has potential to facilitate communication among the different project participants at the higher level of integrated structural engineering systems. KW - Mehragentensystem KW - Lernendes System KW - Kommunikationsprotokoll Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2207 ER - TY - JOUR A1 - Gao, Zuoren A1 - Wu, Weiyu A1 - Ren, Aizhu T1 - Physically Based Modeling and Multi-Physical Simulation System for Wood Structure Fire Performance N2 - This research is devoted to promoting the performance-based engineering in wood structure fire. It looks into the characteristic of the material, structural composing and collapse detecting to find out the main factors in the wood structure collapse in fire. The aim of the research is to provide an automatic simulation platform for the complicated circulation. A physically based model for slim member for beams and columns and a frame of multi-physical simulation are provided to implement the system. The physically based model contains material model, structural mechanics model, material mechanics model, as well as geometry model for the compositive simulation. The multi-physical simulation is built on the model and has the capacity to carry out a simulation combining structural, fire (thermal, CFD) and material degradation simulation. The structural and fire simulation rely on two sophisticated software respectively, ANSYS (an FEA software) and FDS (with a core of CFD). Researchers of the paper develop system by themselves to combine the two existing ones. The system has the capability to calculate the wood char to find out the loss of cross-section and to detect the collapse caused in different ways. The paper gives a sample of Chinese traditional house to show how this simulation system works. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Holzbau KW - Brandschutz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2381 ER - TY - CHAP A1 - Suzuki, Aketo T1 - Numerical Analysis for Prediction as to Influence of Digging a Tunnel on Groundwater N2 - This paper describes monitoring of the in-valley discharge and underground water level at the place where the tunnel will be constructed and also, the numerical analysis for prediction applying the Tank Model and Linear Filter Method to calculate the prediction. The application of these analyses has actually allowed the change of underground water level to be grasped and more effective information system to be established by comparing the real-time monitoring data with the real-time calculation of prediction. KW - Mobile Computing KW - Funknetz KW - Tunnelbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1133 ER - TY - CHAP A1 - Xie, Haiyan A1 - Issa, Raja A1 - O'Brien, William T1 - Structure of a Formal User Model for Construction Information Retrieval N2 - Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction. KW - Bauwerk KW - Datenmanagement KW - Benutzeroberfläche Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1296 ER - TY - JOUR A1 - Takagi, Kousuke A1 - Tani, Akinori A1 - Kawamura, Hiroshi T1 - Research on Intelligent Fuzzy Optimal Active and Hybrid Control Systems of Building Structures - Verification of Optimization Method on Switching Rules of Control Forces N2 - Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified. KW - Mehragentensystem KW - Lernendes System KW - Fuzzy-Logik KW - Optimierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2238 ER - TY - JOUR A1 - Willenbacher, Heiko A1 - Hübler, Reinhard T1 - Intelligent Link-Management for the Support of Integration in Building Life Cycle N2 - The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants. KW - Mehragentensystem KW - Lernendes System KW - Bauwerk KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2223 ER - TY - CHAP A1 - Miles, John A1 - Cen, Mei A1 - Taylor, Mark T1 - Linking Sketching and Constraint Checking for Early Conceptual Design N2 - At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients. KW - Konzipieren KW - Bauwerk KW - Management KW - Constraintnetz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1547 ER - TY - JOUR A1 - Motawa, Ibrahim A1 - Anumba, Chimay A1 - El-Hamalawi, A. T1 - Development of a Fuzzy System for Change Prediction in Construction Projects N2 - Change management has been the focus of different IT systems. These IT systems were developed to represent design information, record design rationale, facilitate design coordination and changes. They are largely based on managing reactive changes, particularly design changes, in which changes are recorded and then propagated to the relevant project members. However, proactive changes are hardly dealt with in IT systems. Proactive changes require estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. This is a major outcome of the case studies carried out as part of this research. Therefore, the proposed model considers that incomplete knowledge and certain project characteristics are always behind change causes. For proactive changes, predicting a change event is the main task for modelling. The prediction model should strive to integrate these main elements: 1) project characteristics that lead to change 2) causes of change, 3) the likelihood of change occurrence, and 4) the change consequences. It should also define the dependency relationships between these elements. However, limited data (documented) are only available from previous projects for change cases and many of the above elements can only be expressed in linguistic terms. This means that the model will simulate the uncertainty and subjectivity associated with these sets of elements. Therefore, a fuzzy model is proposed in this research to capture these elements. The model analyses the impact of each set of elements on the other by assigning fuzzy values for these elements that express the uncertainty and subjectivity of their impact. The main aim is to predict change events and evaluate change effects on project parameters. The fuzzy model described above was developed in an IT system for operational purposes and was designed as a Java package of components with their supporting classes, beans, and files. This paper describes the development and the architecture of the proposed IT system to achieve these requirements. The system is intended to help project teams in dealing with change causes and then the change consequences in construction projects. KW - Mehragentensystem KW - Lernendes System KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2180 ER - TY - CHAP A1 - Miles, John A1 - Joita, Liviu A1 - Burnap, Peter T1 - Collaborative Engineering: Virtual Teams in a Grid Environment Supporting Consortia in the Construction Industry N2 - In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI). KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1362 ER - TY - CHAP A1 - Palm, Johan T1 - Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment N2 - The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1625 ER - TY - CHAP A1 - Olivier, A. H. T1 - An application-centred framework for distributed engineering applications N2 - The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Framework Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1353 ER - TY - JOUR A1 - Yabuki, Nobuyoshi A1 - Yoshimura, Yutaka T1 - An Evaluation System for Steel Structures of Hydroelectric Power Stations based on Fault Tree Analysis and Performance Maps N2 - This paper presents an evaluation system for steel structures of hydroelectric power stations, including hydraulic gates and penstocks, based on Fault Tree Analyasis (FTA) and performance maps. This system consists of fault tree diagrams of FTA, performance maps, design and analysis systems, and engineerin databases. These four modules are integrated by appropriate hyperlinks so that the user of this system can use it easily and seamlessly. A well developed system was applied to some illustrative example cases, and they showed that the developed methodology and system worked well and the users found the system useful and effective for their maintenance tasks at powerstations. KW - Wissensmanagement KW - Stahlbau KW - Wasserkraftwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2564 ER - TY - CHAP A1 - Cheung, Moe M. S. A1 - Noruziaan, Bahman A1 - Li, W. C. T1 - Data acquisition, processing and management systems for a Canadian bridge monitoring project N2 - This paper will present a number of technical aspects for one of the most elaborate instrumentation and data acquisition projects ever undertaken in Canada. Confederation Bridge, the longest bridge built over ice covered seawater has been equipped with the state of the art data acquistition devices and systems as well as data transfer networks. The Bridge has been providing a fixed surface connection between Prince Edward Island and Province of New Brunswick in Canada since its opening in 1997. The Bridge has a rather long design service life of 100 years. Because of its large size and long span length, its design is not covered by any existing codes or standards worldwide. The focus of the paper is to introduce the data acquisition, transfer, processing and management systems. The instrumentation and communications infrastructure and devices will be presented in some details along with the data processing and management systems and techniques. Teams of engineers and researchers use the collected data to verify the analysis and design assumptions and parameters as well as investigate the short-term and long-term behaviour and health of the Bridge. The collected data are also used in furthering research activities in the field of bridge engineering and in elevating our knowledge about behaviour, reliability and durability of such complex structures, their components and materials. KW - Bauwerk KW - Datenmanagement KW - Brückenbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1235 ER - TY - CHAP A1 - Chou, Yu-Hur A1 - Hsieh, Shang-Hsien T1 - Design of Partial Scoring Assessment System for Reinforcement Concrete Design Course : Development of Partial Scoring Assessment System for Reinforcement Concrete Design Course N2 - In the field of Civil Engineering, the content of reinforcement concrete design course (RC course) has complicated design procedures and many difficult specifications to recognize, so most of the students regard the RC course a tough course, and teachers very often find the class time insufficient. Also, teachers of the RC course usually spend a lot of time in organizing the examinations for handling tedious calculations and complicated logical reasoning. Furthermore, correcting examination papers with partial scoring takes even more time of the teacher’s. Therefore, the objective of this research is to design and develop a partial scoring assessment system to meet the needs in engineering design courses, such as the RC course. This assessment system can generate test items with variable parameters. It also supports inference diagnosis on the examinee’s misconceptions and gives partial scores in grading the examination. In this research, the example test subject is the analysis of rectangular reinforced concrete beam with single layer steel bars. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Stahlbeton Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-905 ER - TY - CHAP A1 - Bürgy, Christian A1 - Garrett, James H. T1 - Supporting Domain Experts in Determining Viable User Interface Designs for Wearable Computers Used in AEC Work Situations N2 - The design of mobile IT systems, especially the design of wearable computer systems, is a complex task that requires computer science knowledge, such as that related to hardware configuration and software development, in addition to knowledge of the domain in which the system is intended to be used. Particularly in the AEC sector, it is necessary that the support from mobile information technology fit the work situation at hand. Ideally, the domain expert alone can adjust the wearable computer system to achieve this fit without having to consult IT experts. In this paper, we describe a model that helps in transferring existing design knowledge from non-AEC domains to new projects in the construction area. The base for this is a model and a methodology that describes the usage scenarios of said computer systems in an application-neutral and domain-independent way. Thus, the actual design information and experience will be transferable between different applications and domains. KW - Mobile Computing KW - Funknetz KW - Benutzeroberfläche KW - Mensch-Maschine-Kommunikation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1168 ER - TY - JOUR A1 - Kicinger, Rafal A1 - Arciszewski, Tomasz A1 - De Jong, Kenneth T1 - Distributed Evolutionary Design: Island-Model-based Optimization of Steel Skeleton Structures in Tall Buildings N2 - This paper presents results of a study on distributed, or parallel, evolutionary computation in the topological design of steel structural systems in tall buildings. It describes results of extensive experimental research on various parallel evolutionary architectures applied to a complex structural design problem. The experiments were conducted using Inventor 2003, a networkbased evolutionary design support tool developed at George Mason University. First, a general introduction to evolutionary computation is provided with an emphasis on recent developments in parallel evolutionary architectures. Next, a discussion of conceptual design of steel structural systems in tall buildings is presented. Further, Inventor 2003 is briefly introduced as well as its design representation and evolutionary computation characteristics. Next, the results obtained from systematic design experiments conducted with Inventor 2003 are discussed. The objective of these experiments was to qualitatively and quantitatively investigate evolution of steel structural systems in tall buildings during a distributed evolutionary design process as well as to compare efficiency and effectiveness of various parallel evolutionary architectures with the traditional evolutionary design approaches. Two connectivity topologies (ring topology and fully-connected topology) have been investigated for four populations of structural designs evolving in parallel and using various migration strategies. Also, results of the initial sensitivity studies are reported in which two ways of initializing distributed evolutionary design processes were investigated, using either arbitrarily selected designs as initial parents or randomly generated ones. Finally, initial research conclusions are presented. KW - Mehragentensystem KW - Lernendes System KW - Stahlbau KW - Skelettbau KW - Optimierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2195 ER - TY - CHAP A1 - Breit, Manfred A1 - Kündig, Daniel A1 - Häubi, Fritz T1 - Project oriented learning environment (POLE-Europe) N2 - The presented work focuses on collaboration- experiences gathered with complex design and engineering projects, using the learning platform POLE- Europe. Within the POLE environment student-teams from different universities, disciplines and cultural backgrounds are assigned to real-world projects with clearly defined design - tasks, usually to be accomplished within one semester while working in a virtual environment for most of the time. The concept of POLE and the information and collaboration technology is described. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-935 ER - TY - JOUR A1 - Milbradt, Peter A1 - Schierbaum, Jochen A1 - Schwöppe, Axel T1 - Finite Cell-Elements of Higher Order N2 - The method of the finite elements is an adaptable numerical procedure for interpolation as well as for the numerical approximation of solutions of partial differential equations. The basis of these procedure is the formulation of suitable finite elements and element decompositions of the solution space. Classical finite elements are based on triangles or quadrangles in the two-dimensional space and tetrahedron or hexahedron in the threedimensional space. The use of arbitrary-dimensional convex and non-convex polyhedrons as the geometrical basis of finite elements increases the flexibility of generating finite element decompositions substantially and is sometimes the only way to get a clear decomposition... KW - Finite-Elemente-Methode KW - Physikalisches Verfahren Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2524 ER - TY - CHAP A1 - Hassan, Tarek A1 - Shelbourn, Mark A1 - Carter, Chris T1 - Collaboration in Construction: Legal and Contractual Issues in ICT Applications N2 - The construction industry is a project-based business bringing together many different organisations to complete a desired goal. The strategic use of Information and Communication Technologies (ICT) has enabled this goal to be completed more effectively. Two issues require addressing, the technology itself and the implementation factors of the technology. Such implementation factors should consider, among other factors, the legal and contractual issues associated with the use of ICT, training requirements and its effects on the organisational culture. To date the legal and contractual issues have not been extensively covered, and it is recognised that the technologies have not been properly covered by any recognised legal and contractual practices. This in turn is threatening to inhibit the growth and prosperity of the use of the technology on construction projects. This paper discusses these legal and contractual issues and describes methods and tools that can be used to enable the growth of technology to be used in a legal and contractually valid environment. KW - Forschung KW - Europa KW - Informationstechnik KW - Bauindustrie KW - Vertrag Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2005 ER - TY - JOUR A1 - El-Rayes, Khaled A1 - Hyari, Khalied T1 - A Multi-objective Model for Optimizing Construction Planning of Repetitive Infrastructure Projects N2 - This paper presents the development of a model for optimizing resource utilization in repetitive infrastructure projects. The model provides the capability of simultaneous minimization of both project duration and work interruptions for construction crews. The model provides in a single run, a set of nondominated solutions that represent the tradeoff between these two objectives. The model incorporates a multiobjective genetic algorithm and scheduling algorithm. The model initially generates a randomly selected set of solutions that evolves to a near optimal set of tradeoff solutions in subsequent generations. Each solution represents a unique scheduling solution that is associated with certain project duration and a number of interruption days for utilized construction crews. As such, the model provides project planners with alternative schedules along with their expected duration and resource utilization efficiency. KW - Mehragentensystem KW - Lernendes System KW - Infrastruktur Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2135 ER - TY - CHAP A1 - Flood, Ian A1 - Issa, Raja A1 - Abu-Shdid, Caesar T1 - Developments in Hyper Real-Time Simulation of Transient Heat-Flow in Buildings N2 - This paper reports on the latest results in the development of a new approach for simulating the thermal behavior of buildings that overcomes the limitations of conventional heat-transfer simulation methods such as FDM and FEM. The proposed technique uses a coarse-grain approach to model development whereby each element represents a complete building component such as a wall, internal space, or floor. The thermal behavior of each coarse-grain element is captured using empirical modeling techniques such as artificial neural networks (ANNs). The main advantages of the approach compared to conventional simulation methods are: (a) simplified model construction for the end-user; (b) simplified model reconfiguration; (c) significantly faster simulation runs (orders of magnitude faster for two and three-dimensional models); and (d) potentially more accurate results. The paper demonstrates the viability of the approach through a number of experiments with a model of a composite wall. The approach is shown to be able to sustain highly accurate longterm simulation runs, if the coarse-grain modeling elements are implemented as ANNs. In contrast, an implementation of the coarse-grain elements using a linear model is shown to function inaccurately and erratically. The paper concludes with an identification of on-going work and future areas for development of the technique. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Echtzeitverarbeitung KW - Konvektion Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1961 ER - TY - JOUR A1 - Kaklauskas, Gintaris A1 - Cervenka, Vladimir A1 - Cervenka, Jan T1 - Deflection Calculation of RC Beams: Finite Element Software versus Design Code Methods N2 - The paper investigates accuracy of deflection predictions made by the finite element package ATENA and design code methods ACI and EC2. Deflections have been calculated for a large number of experimental reinforced concrete beams reported by three investigators. Statistical parameters have been established for each of the technique at different load levels, separately for the beams with small and moderate reinforcement ratio. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Balken Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2498 ER - TY - CHAP A1 - Biltchouk, Irina A1 - Pahl, Peter Jan T1 - Interaction of Data Bases and Graphical Interfaces in Civil Engineering N2 - Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Graphische Benutzeroberfläche KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1636 ER - TY - CHAP A1 - Tonn, Christian A1 - Wolkowicz, Christian A1 - Thurow, Torsten T1 - Plausibility in Architectural Design - DOMEdesign – Software Support for the formal shaping and architect-oriented design of shell structures N2 - Complex gridshell structures used in architecturally ambitious constructions remain as appealing as ever in the public realm. This paper describes the theory and approach behind the software realisation of a tool which helps in finding the affine self-weight geometry of gridshell structures. The software tool DOMEdesign supports the formal design process of lattice and grid shell structures based upon the laws of physics. The computer-aided simulation of suspension models is used to derive structurally favourable forms for domes and arches subject to compression load, based upon the input of simple architectonic parameters. Irregular plans, three-dimensional topography, a choice different kinds of shell lattice structures and the desired height of the dome are examples of design parameters which can be used to modify the architectural design. The provision of data export formats for structural dimensioning and visualisation software enables engineers and planners to use the data in future planning and to communicate the design to the client. KW - Architektur KW - Verteiltes System KW - Schale Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1812 ER - TY - JOUR A1 - Katranuschkov, Peter A1 - Gehre, Alexander A1 - Scherer, Raimar J. T1 - User Requirements Capture in Distributed Project Environments: A Process-centred Approach N2 - Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives. KW - Informationstechnik KW - Forschung KW - Europa KW - Bedarfsforschung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2029 ER - TY - CHAP A1 - Raue, Erich A1 - Weitzmann, Rüdiger T1 - Analysis and Design of Hybrid Structures using Optimization Strategies N2 - The paper gives a general overview and concerns with a specified set of computer-aided analysis modules for hybrid structures loaded by extreme excitations. All problems are solved by methods of linear, quadratic or nonlinear mathematical optimization, that leads to very effective and economic design solutions. All approaches are derived from general optimization problem that can be easily altered to conform to specific design tasks. Some advantages and possibilities of hybrid structural modeling (single or mixed model-supported) are discussed. The methods will be illustrated by an example structure and optimization schemes. KW - Konzipieren KW - Bauwerk KW - Optimierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1023 ER - TY - JOUR A1 - Ma, Zhiliang A1 - Qin, Liang T1 - A Framework of Management Information System for Construction Projects N2 - A comprehensive framework of information management system for construction projects in China has been established through extensive literature survey and field investigation. It utilizes the potential information technologies and covers the practical management patterns as well as the major aspects of construction project management. It can be used to guide and evaluate the design of the information management systems for construction projects in order to make the system to be applicable to a wide variety of construction projects and survive the changes in project management. KW - Mehragentensystem KW - Lernendes System KW - Managementinformationssystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2126 ER - TY - CHAP A1 - Ma, Zhiliang A1 - Wong, K. D. A1 - Yang, Jun T1 - An Approach to Utilizing Exchanged Documents in Construction Projects Based on Data Warehouse Technology N2 - There are many construction projects in China and mass documents are exchanged among the multi-party, including the owner, the contractor and the engineer in the projects. Based on previous studies, an approach to the utilization of the exchanged documents is established by using data warehouse technology and a prototype system called EXPLYZER is developed. The approach and the prototype system are verified through their application in a construction project. It is concluded that the approach can support the decision-making in project management. KW - Bauwerk KW - Datenmanagement KW - Data-Warehouse-Konzept KW - Exchanged Documents KW - Managment Information System Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1227 ER - TY - JOUR A1 - Kang, Shihchung A1 - Miranda, Eduardo T1 - Automated Simulation of the Erection Activities in Virtual Construction N2 - The goal of the research is the development of a computer system to plan, simulate and visualize erection processes in construction. In the research construction cranes are treated as robots with predefined degrees of freedom and crane-specific motion planning techniques are developed to generate time-optimized and collision-free paths for each piece to be erected in the project. Using inverse kinematics and structural dynamics simulation, the computer system then computes the crane motions and velocities necessary to achieve the previously calculated paths. The main benefits of the research are the accurate planning and scheduling of crane operations leading to optimization of crane usage and project schedules, as well as improving overall crane safety in the project. This research is aimed at the development of systems that will allow computer-assisted erection of civil infrastructure and ultimately to achieve fully-automated erection processes using robotic cranes... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Baukonstruktion KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2310 ER - TY - JOUR A1 - Neuberg, Frank A1 - Fank, Ernst A1 - Ekkerlein, Christian T1 - Integrated Life Cycle Simulation and Assessment of Buildings N2 - Buildings require both for construction and, due to their comparatively long life cycle for maintenance, significant raw material and energy resources. So far available knowledge about resource consumption during an entire life cycle of a building is still quite rare, because various criteria affect each other and/or overlay mutually. In this contribution a model based software concept is presented using an integrated approach for life cycle simulation and assessment of buildings. The essential point of the development consists of connecting an IFC compliant product model of a building via the Internet with data bases for the resource and energy requirement of building materials. Furthermore, numerical simulations allow calculating and minimizing the energy consumption, the resource requirement, the waste streams and also the noxious emissions. In the context of this paper we present the first release of software programs for architects and engineers, which help them to evaluate their design decisions objectively in early planning steps. Additionally the usage of the software is demonstrated by a test case study for a real world building. By applying this software in practice a substantial contribution for saving energy and natural resources can be provided in the sense of sustainable and ecological building design. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2351 ER - TY - CHAP A1 - Gebbeken, Norbert A1 - Baumhauer, Andreas A1 - Ionita, Mihai T1 - Increasing the Reliability and Performance through Automatization and Parallel Working N2 - Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Parallelverarbeitung KW - Simulation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1397 ER - TY - JOUR A1 - Semenov, Vitaly A1 - Alekseeva, Elena A1 - Tarlapan, Oleg T1 - Virtual Construction using Map-based Approach N2 - The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Virtuelle Realität KW - Bauwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2447 ER - TY - JOUR A1 - Kiviniemi, Arto A1 - Fischer, Martin T1 - Requirements Management Interface to Building Product Models N2 - In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Bauwerk KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2427 ER - TY - JOUR A1 - Kang, Shihchung A1 - Miranda, Eduardo T1 - Physics Based Model for Simulating the Dynamics of Tower Cranes N2 - The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Turmdrehkran KW - Dynamische Belastung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2409 ER - TY - JOUR A1 - Holtzhauer, Eric A1 - Saal, Helmut T1 - Product modelling in the steel construction domain N2 - The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Stahlbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2415 ER - TY - JOUR A1 - Rose, Martin T1 - Modeling of Freeway Traffic N2 - An integrated modeling of freeway traffic is developed, whose implementation in an uniform computer –aided simulation model facilitate comparative evaluation and systematic coupling of several traffic simulations, traffic controls, traffic measurements and traffic scenarios. The integrated modeling of freeway traffic is a basic mapping of freeway networks, control methods, measurements and different simulations of traffic flow... KW - Verkehrsplanung KW - Simulation KW - Autobahn Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2639 ER - TY - JOUR A1 - Shih, Naai-Jung A1 - Lee, Wen-Pang T1 - Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space N2 - An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Luft KW - Schadstoffkonzentration Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2376 ER -