TY - CHAP A1 - Huhnt, Wolfgang T1 - Progress Measurement in Planning Processes on the Base of Process Models N2 - This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmodell KW - Bauablauf Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1664 ER - TY - CHAP A1 - El-Rayes, Khaled A1 - Kandil, Amr T1 - Distributed Computing for the Optimization of Large-Scale Construction Projects N2 - Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Verteiltes System KW - Planung KW - Großbaustelle KW - Optimal Planning Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1601 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Klauer, Thomas T1 - Internet-based Workflow-Management for Civil Engineering Projects N2 - The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1647 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Gutzke, Thomas T1 - Groundwater-Monitoring based on dynamic co-operative eGovernment-Processes N2 - As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Grundwasser KW - Monitorüberwachung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1611 ER - TY - CHAP A1 - Freundt, Martin A1 - Beucke, Karl T1 - A flexible model for scheduling building processes based on graph theory and fuzzy numbers N2 - The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Scheduling KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1587 ER - TY - CHAP A1 - Perevalova, Julia A1 - Pahl, Peter Jan T1 - Structural and Functional Dependence of Objects in Data Bases N2 - Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Objektorientierung KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1683 ER - TY - CHAP A1 - Kopyto, Martin A1 - Petersen, Michael A1 - Diaz, Joaquin T1 - Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects N2 - The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1599 ER - TY - CHAP A1 - Ignatova, Elena A1 - Kirschke, Heiko A1 - Tauscher, Eike A1 - Smarsly, Kay ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - PARAMETRIC GEOMETRIC MODELING IN CONSTRUCTION PLANNING USING INDUSTRY FOUNDATION CLASSES T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - One of the most promising and recent advances in computer-based planning is the transition from classical geometric modeling to building information modeling (BIM). Building information models support the representation, storage, and exchange of various information relevant to construction planning. This information can be used for describing, e.g., geometric/physical properties or costs of a building, for creating construction schedules, or for representing other characteristics of construction projects. Based on this information, plans and specifications as well as reports and presentations of a planned building can be created automatically. A fundamental principle of BIM is object parameterization, which allows specifying geometrical, numerical, algebraic and associative dependencies between objects contained in a building information model. In this paper, existing challenges of parametric modeling using the Industry Foundation Classes (IFC) as a federated model for integrated planning are shown, and open research questions are discussed. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28024 SN - 1611-4086 ER - TY - CHAP A1 - Smarsly, Kay A1 - Tauscher, Eike ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - IFC-BASED MONITORING INFORMATION MODELING FOR DATA MANAGEMENT IN STRUCTURAL HEALTH MONITORING T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - This conceptual paper discusses opportunities and challenges towards the digital representation of structural health monitoring systems using the Industry Foundation Classes (IFC) standard. State-of-the-art sensor nodes, collecting structural and environmental data from civil infrastructure systems, are capable of processing and analyzing the data sets directly on-board the nodes. Structural health monitoring (SHM) based on sensor nodes that possess so called “on-chip intelligence” is, in this study, referred to as “intelligent SHM”, and the infrastructure system being equipped with an intelligent SHM system is referred to as “intelligent infrastructure”. Although intelligent SHM will continue to grow, it is not possible, on a well-defined formalism, to digitally represent information about sensors, about the overall SHM system, and about the monitoring strategies being implemented (“monitoring-related information”). Based on a review of available SHM regulations and guidelines as well as existing sensor models and sensor modeling languages, this conceptual paper investigates how to digitally represent monitoring-related information in a semantic model. With the Industry Foundation Classes, there exists an open standard for the digital representation of building information; however, it is not possible to represent monitoring-related information using the IFC object model. This paper proposes a conceptual approach for extending the current IFC object model in order to include monitoring-related information. Taking civil infrastructure systems as an illustrative example, it becomes possible to adequately represent, process, and exchange monitoring-related information throughout the whole life cycle of civil infrastructure systems, which is referred to as monitoring information modeling (MIM). However, since this paper is conceptual, additional research efforts are required to further investigate, implement, and validate the proposed concepts and methods. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28237 SN - 1611-4086 ER - TY - CHAP ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar T1 - Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen : 20. bis 22.7. 2015, Bauhaus-Universität Weimar T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - The 20th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering will be held at the Bauhaus University Weimar from 20th till 22nd July 2015. Architects, computer scientists, mathematicians, and engineers from all over the world will meet in Weimar for an interdisciplinary exchange of experiences, to report on their results in research, development and practice and to discuss. The conference covers a broad range of research areas: numerical analysis, function theoretic methods, partial differential equations, continuum mechanics, engineering applications, coupled problems, computer sciences, and related topics. Several plenary lectures in aforementioned areas will take place during the conference. We invite architects, engineers, designers, computer scientists, mathematicians, planners, project managers, and software developers from business, science and research to participate in the conference! KW - Angewandte Informatik KW - Angewandte Mathematik KW - Computerunterstütztes Verfahren KW - Building Information Modeling KW - Optimization in engineering applications KW - Data, information and knowledge modeling in civil engineering KW - Function theoretic methods and PDE in engineering sciences KW - Mathematical methods for (robotics and) computer vision KW - Numerical modeling in engineering Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20150828-24515 SN - 1611-4086 ER - TY - CHAP A1 - Hartmann, Veronika A1 - Smarsly, Kay A1 - Lahmer, Tom ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - ROBUST SCHEDULING IN CONSTRUCTION ENGINEERING T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the optimization of the robustness of construction schedules has received little attention. In this paper, the effects of uncertainties inherent to the input data of construction schedules are discussed. Possibilities are investigated to improve the reliability of construction schedules by considering alternative processes for certain tasks and by identifying the combination of processes generating the most robust schedule with respect to the makespan of a construction project. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-27994 SN - 1611-4086 ER -