TY - CHAP A1 - Rodrigues, M. Manuela ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - OPERATIONAL PROPERTIES OF THE LAGUERRE TRANSFORM T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - The Laguerre polynomials appear naturally in many branches of pure and applied mathematics and mathematical physics. Debnath introduced the Laguerre transform and derived some of its properties. He also discussed the applications in study of heat conduction and to the oscillations of a very long and heavy chain with variable tension. An explicit boundedness for some class of Laguerre integral transforms will be present. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28186 SN - 1611-4086 ER - TY - CHAP A1 - Karaki, Ghada ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - SELECTION AND SCALING OF GROUND MOTION RECORDS FOR SEISMIC ANALYSIS USING AN OPTIMIZATION ALGORITHM T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - The nonlinear time history analysis and seismic performance based methods require a set of scaled ground motions. The conventional procedure of ground motion selection is based on matching the motion properties, e.g. magnitude, amplitude, fault distance, and fault mechanism. The seismic target spectrum is only used in the scaling process following the random selection process. Therefore, the aim of the paper is to present a procedure to select a sets of ground motions from a built database of ground motions. The selection procedure is based on running an optimization problem using Dijkstra’s algorithm to match the selected set of ground motions to a target response spectrum. The selection and scaling procedure of optimized sets of ground motions is presented by examining the analyses of nonlinear single degree of freedom systems. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28058 SN - 1611-4086 ER - TY - CHAP A1 - Wiggenbrock, Jens A1 - Smarsly, Kay ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - A GENERIC FRAMEWORK SUPPORTING DISTRIBUTED COMPUTING IN ENGINEERING APPLICATIONS T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - Modern distributed engineering applications are based on complex systems consisting of various subsystems that are connected through the Internet. Communication and collaboration within an entire system requires reliable and efficient data exchange between the subsystems. Middleware developed within the web evolution during the past years provides reliable and efficient data exchange for web applications, which can be adopted for solving the data exchange problems in distributed engineering applications. This paper presents a generic approach for reliable and efficient data exchange between engineering devices using existing middleware known from web applications. Different existing middleware is examined with respect to the suitability in engineering applications. In this paper, a suitable middleware is shown and a prototype implementation simulating distributed wind farm control is presented and validated using several performance measurements. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28260 SN - 1611-4086 ER - TY - JOUR A1 - Bargstädt, Hans-Joachim T1 - Challenges of BIM for Construction Site Operations JF - Procedia Engineering N2 - Building Information Modeling is a powerful tool for the design and for a consistent set of data in a virtual storage. For the application in the phases of realization and on site it needs further development. The paper describes main challenges and main features, which will help the development of software to better service the needs of construction site managers KW - Building Information Modeling KW - Baustelle KW - BIM; Building Information Modeling; site management; construction site. Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170413-31218 SP - 52 EP - 59 ER - TY - CHAP A1 - Nguyen-Tuan, Long A1 - Lahmer, Tom A1 - Datcheva, Maria A1 - Stoimenova, Eugenia A1 - Schanz, Tom ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - PARAMETER IDENTIFICATION APPLYING IN COMPLEX THERMO-HYDRO-MECHANICAL PROBLEMS LIKE THE DESIGN OF BUFFER ELEMENTS T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - This study contributes to the identification of coupled THM constitutive model parameters via back analysis against information-rich experiments. A sampling based back analysis approach is proposed comprising both the model parameter identification and the assessment of the reliability of identified model parameters. The results obtained in the context of buffer elements indicate that sensitive parameter estimates generally obey the normal distribution. According to the sensitivity of the parameters and the probability distribution of the samples we can provide confidence intervals for the estimated parameters and thus allow a qualitative estimation on the identified parameters which are in future work used as inputs for prognosis computations of buffer elements. These elements play e.g. an important role in the design of nuclear waste repositories. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28162 SN - 1611-4086 ER - TY - CHAP A1 - Jaouadi, Zouhour A1 - Lahmer, Tom ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - Topology optimization of structures subjected to multiple load cases by introducing the Epsilon constraint method T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - A topology optimization method has been developed for structures subjected to multiple load cases (Example of a bridge pier subjected to wind loads, traffic, superstructure...). We formulate the problem as a multi-criterial optimization problem, where the compliance is computed for each load case. Then, the Epsilon constraint method (method proposed by Chankong and Haimes, 1971) is adapted. The strategy of this method is based on the concept of minimizing the maximum compliance resulting from the critical load case while the other remaining compliances are considered in the constraints. In each iteration, the compliances of all load cases are computed and only the maximum one is minimized. The topology optimization process is switching from one load to another according to the variation of the resulting compliance. In this work we will motivate and explain the proposed methodology and provide some numerical examples. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28042 SN - 1611-4086 ER - TY - CHAP ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar T1 - Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen : 20. bis 22.7. 2015, Bauhaus-Universität Weimar T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - The 20th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering will be held at the Bauhaus University Weimar from 20th till 22nd July 2015. Architects, computer scientists, mathematicians, and engineers from all over the world will meet in Weimar for an interdisciplinary exchange of experiences, to report on their results in research, development and practice and to discuss. The conference covers a broad range of research areas: numerical analysis, function theoretic methods, partial differential equations, continuum mechanics, engineering applications, coupled problems, computer sciences, and related topics. Several plenary lectures in aforementioned areas will take place during the conference. We invite architects, engineers, designers, computer scientists, mathematicians, planners, project managers, and software developers from business, science and research to participate in the conference! KW - Angewandte Informatik KW - Angewandte Mathematik KW - Computerunterstütztes Verfahren KW - Building Information Modeling KW - Optimization in engineering applications KW - Data, information and knowledge modeling in civil engineering KW - Function theoretic methods and PDE in engineering sciences KW - Mathematical methods for (robotics and) computer vision KW - Numerical modeling in engineering Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20150828-24515 SN - 1611-4086 ER - TY - CHAP A1 - Tan, Fengjie A1 - Lahmer, Tom A1 - Siddappa, Manju Gyaraganahalll ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - SECTION OPTIMIZATION AND RELIABILITY ANALYSIS OF ARCH-TYPE DAMS INCLUDING COUPLED MECHANICAL-THERMAL AND HYDRAULIC FIELDS T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - From the design experiences of arch dams in the past, it has significant practical value to carry out the shape optimization of arch dams, which can fully make use of material characteristics and reduce the cost of constructions. Suitable variables need to be chosen to formulate the objective function, e.g. to minimize the total volume of the arch dam. Additionally a series of constraints are derived and a reasonable and convenient penalty function has been formed, which can easily enforce the characteristics of constraints and optimal design. For the optimization method, a Genetic Algorithm is adopted to perform a global search. Simultaneously, ANSYS is used to do the mechanical analysis under the coupling of thermal and hydraulic loads. One of the constraints of the newly designed dam is to fulfill requirements on the structural safety. Therefore, a reliability analysis is applied to offer a good decision supporting for matters concerning predictions of both safety and service life of the arch dam. By this, the key factors which would influence the stability and safety of arch dam significantly can be acquired, and supply a good way to take preventive measures to prolong ate the service life of an arch dam and enhances the safety of structure. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28212 SN - 1611-4086 ER - TY - CHAP A1 - Hartmann, Veronika A1 - Smarsly, Kay A1 - Lahmer, Tom ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - ROBUST SCHEDULING IN CONSTRUCTION ENGINEERING T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the optimization of the robustness of construction schedules has received little attention. In this paper, the effects of uncertainties inherent to the input data of construction schedules are discussed. Possibilities are investigated to improve the reliability of construction schedules by considering alternative processes for certain tasks and by identifying the combination of processes generating the most robust schedule with respect to the makespan of a construction project. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-27994 SN - 1611-4086 ER - TY - CHAP A1 - Bargstädt, Hans-Joachim A1 - Tarigan, Rina Sari ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - RULE BASED EXPANSION OF STANDARD CONSTRUCTION PROCESSES T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - The paper introduces a systematic construction management approach, supporting expansion of a specified construction process, both automatically and semi-automatically. Throughout the whole design process, many requirements must be taken into account in order to fulfil demands defined by clients. In implementing those demands into a design concept up to the execution plan, constraints such as site conditions, building code, and legal framework are to be considered. However, complete information, which is needed to make a sound decision, is not yet acquired in the early phase. Decisions are traditionally taken based on experience and assumptions. Due to a vast number of appropriate available solutions, particularly in building projects, it is necessary to make those decisions traceable. This is important in order to be able to reconstruct considerations and assumptions taken, should there be any changes in the future project’s objectives. The research will be carried out by means of building information modelling, where rules deriving from standard logics of construction management knowledge will be applied. The knowledge comprises a comprehensive interaction amongst bidding process, cost-estimation, construction site preparation as well as specific project logistics – which are usually still separately considered. By means of these rules, favourable decision taking regarding prefabrication and in-situ implementation can be justified. Modifications depending on the available information within current design stage will consistently be traceable. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28229 SN - 1611-4086 ER - TY - CHAP A1 - Nasir, A.R. A1 - Bargstädt, Hans-Joachim ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - AMELIORATING EMPLOYABILITY IN CONSTRUCTION THROUGH BIM INNOVATION T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - Low-skilled labor makes a significant part of the construction sector, performing daily production tasks that do not require specific technical knowledge or confirmed skills. Today, construction market demands increasing skill levels. Many jobs that were once considered to be undertaken by low or un-skilled labor, now demand some kind of formal skills. The jobs that require low skilled labor are continually decreasing due to technological advancement and globalization. Jobs that previously required little or no training now require skilful people to perform the tasks appropriately. The study aims at ameliorating employability of less skilled manpower by finding ways to instruct them for performing constructions tasks. A review of exiting task instruction methodologies in construction and the underlying gaps within them warrants an appropriate way to train and instruct low skilled workers for the tasks in construction. The idea is to ensure the required quality of construction with technological and didactic aids seeming particularly purposeful to prepare potential workers for the tasks in construction without exposing them to existing communication barriers. A BIM based technology is considered promising along with the integration of visual directives/animations to elaborate the construction tasks scheduled to be carried on site. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28157 SN - 1611-4086 ER - TY - CHAP A1 - Kraußhar, Rolf Sören A1 - de Almeida, Regina ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - FUNDAMENTALS OF A WIMAN VALIRON THEORY FOR POLYMONOGENIC FUNCTIONS T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - In this paper we present some rudiments of a generalized Wiman-Valiron theory in the context of polymonogenic functions. In particular, we analyze the relations between different notions of growth orders and the Taylor coefficients. Our main intention is to look for generalizations of the Lindel¨of-Pringsheim theorem. In contrast to the classical holomorphic and the monogenic setting we only obtain inequality relations in the polymonogenic setting. This is due to the fact that the Almansi-Fischer decomposition of a polymonogenic function consists of different monogenic component functions where each of them can have a totally different kind of asymptotic growth behavior. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28100 SN - 1611-4086 ER - TY - CHAP A1 - Hommel, Angela A1 - Gürlebeck, Klaus ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - THE RELATIONSHIP BETWEEN LINEAR ELASTICITY THEORY AND COMPLEX FUNCTION THEORY STUDIED ON THE BASIS OF FINITE DIFFERENCES T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - It is well-known that the solution of the fundamental equations of linear elasticity for a homogeneous isotropic material in plane stress and strain state cases can be equivalently reduced to the solution of a biharmonic equation. The discrete version of the Theorem of Goursat is used to describe the solution of the discrete biharmonic equation by the help of two discrete holomorphic functions. In order to obtain a Taylor expansion of discrete holomorphic functions we introduce a basis of discrete polynomials which fulfill the so-called Appell property with respect to the discrete adjoint Cauchy-Riemann operator. All these steps are very important in the field of fracture mechanics, where stress and displacement fields in the neighborhood of singularities caused by cracks and notches have to be calculated with high accuracy. Using the sum representation of holomorphic functions it seems possible to reproduce the order of singularity and to determine important mechanical characteristics. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28010 SN - 1611-4086 ER - TY - CHAP A1 - Kavrakov, Igor A1 - Timmler, Hans-Georg A1 - Morgenthal, Guido ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - STRUCTURAL OPTIMIZATION USING THE ENERGY METHOD WITH INTEGRAL MATERIAL BEHAVIOUR T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - With the advances of the computer technology, structural optimization has become a prominent field in structural engineering. In this study an unconventional approach of structural optimization is presented which utilize the Energy method with Integral Material behaviour (EIM), based on the Lagrange’s principle of minimum potential energy. The equilibrium condition with the EIM, as an alternative method for nonlinear analysis, is secured through minimization of the potential energy as an optimization problem. Imposing this problem as an additional constraint on a higher cost function of a structural property, a bilevel programming problem is formulated. The nested strategy of solution of the bilevel problem is used, treating the energy and the upper objective function as separate optimization problems. Utilizing the convexity of the potential energy, gradient based algorithms are employed for its minimization and the upper cost function is minimized using the gradient free algorithms, due to its unknown properties. Two practical examples are considered in order to prove the efficiency of the method. The first one presents a sizing problem of I steel section within encased composite cross section, utilizing the material nonlinearity. The second one is a discrete shape optimization of a steel truss bridge, which is compared to a previous study based on the Finite Element Method. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28065 SN - 1611-4086 ER - TY - CHAP A1 - Kersten, Jens A1 - Rodehorst, Volker ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - TOWARDS STEREO VISION- AND LASER SCANNER-BASED UAS POSE ESTIMATION T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - A central issue for the autonomous navigation of mobile robots is to map unknown environments while simultaneously estimating its position within this map. This chicken-eggproblem is known as simultaneous localization and mapping (SLAM). Asctec’s quadrotor Pelican is a powerful and flexible research UAS (unmanned aircraft system) which enables the development of new real-time on-board algorithms for SLAM as well as autonomous navigation. The relative UAS pose estimation for SLAM, usually based on low-cost sensors like inertial measurement units (IMU) and barometers, is known to be affected by high drift rates. In order to significantly reduce these effects, we incorporate additional independent pose estimation techniques using exteroceptive sensors. In this article we present first pose estimation results using a stereo camera setup as well as a laser range finder, individually. Even though these methods fail in few certain configurations we demonstrate their effectiveness and value for the reduction of IMU drift rates and give an outlook for further works towards SLAM. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28072 SN - 1611-4086 ER - TY - CHAP A1 - Alalade, Muyiwa A1 - Kafle, Binod A1 - Wuttke, Frank A1 - Lahmer, Tom ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - CALIBRATION OF CYCLIC CONSTITUTIVE MODELS FOR SOILS BY OSCILLATING FUNCTIONS T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - In order to minimize the probability of foundation failure resulting from cyclic action on structures, researchers have developed various constitutive models to simulate the foundation response and soil interaction as a result of these complex cyclic loads. The efficiency and effectiveness of these model is majorly influenced by the cyclic constitutive parameters. Although a lot of research is being carried out on these relatively new models, little or no details exist in literature about the model based identification of the cyclic constitutive parameters. This could be attributed to the difficulties and complexities of the inverse modeling of such complex phenomena. A variety of optimization strategies are available for the solution of the sum of least-squares problems as usually done in the field of model calibration. However for the back analysis (calibration) of the soil response to oscillatory load functions, this paper gives insight into the model calibration challenges and also puts forward a method for the inverse modeling of cyclic loaded foundation response such that high quality solutions are obtained with minimum computational effort. Therefore model responses are produced which adequately describes what would otherwise be experienced in the laboratory or field. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-27932 SN - 1611-4086 ER - TY - CHAP A1 - Khosravian, Reza A1 - Wuttke, Frank ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - QUALITATIVE INVESTIGATION OF THE EFFECT OF SOIL MODELING APPROACH ON DYNAMIC BEHAVIOR OF A SMALL-SCALE 2-DOF STRUCTURE WITH PILE FOUNDATION T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - Known as a sophisticated phenomenon in civil engineering problems, soil structure interaction has been under deep investigations in the field of Geotechnics. On the other hand, advent of powerful computers has led to development of numerous numerical methods to deal with this phenomenon, resulting in a wide variety of methods trying to simulate the behavior of the soil stratum. This survey studies two common approaches to model the soil’s behavior in a system consisting of a structure with two degrees of freedom, representing a two-storey frame structure made of steel, with the column resting on a pile embedded into sand in laboratory scale. The effect of soil simulation technique on the dynamic behavior of the structure is of major interest in the study. Utilized modeling approaches are the so-called Holistic method, and substitution of soil with respective impedance functions. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28080 SN - 1611-4086 ER - TY - THES A1 - Steinkrauß, Tobias T1 - Building Information Modeling im Erdbau - eine Potentialanalyse im Spezialtiefbau N2 - Jede Baumaßnahme ist durch einen Unikatcharakter geprägt. Individuelle Planung, Vergabe und Bauvorgänge stellen immer wieder aufs Neue eine große Herausforderung dar. Durch die sich teilweise sehr schnell ändernden Randbedingungen, müssen erarbeitete Abläufe häufig schnell geändert werden. Dies geschieht heutzutage meist auf Grundlage von Erfahrungen der am Bau Beteiligten. Auch bei bester Planung und Vorbereitung können Unwägbarkeiten den Bauprozess aufhalten. Das können ungeeigneter Baugrund, verschiedenste Hinderungen im Baufeld, schlechte Witterungsverhältnisse, Ausfälle von Maschinen, veränderte Zielsetzungen des Auftraggebers und vieles mehr sein. Dies führt zu Bauzeitverlängerungen und damit zu Kostensteigerungen. Um diesen Problemen besser begegnen zu können und diesen komplexen und fehler-anfälligen Prozess zu unterstützen, sind ein verbesserter Informationsfluss, genauere Boden-aufschlüsse und eine exaktere Dimensionierung des einzusetzenden Gerätes notwendig. Aus diesen Gründen ist der Einsatz von Building Information Modeling (BIM) sinnvoll. BIM bietet die Möglichkeit den Informationsfluss zu verbessern, die Datengenauigkeit zu erhöhen und Abläufe zu optimieren. Außerdem ermöglicht die Anwendung Planungsschritte miteinander zu verknüpfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das über den gesamten Lebenszyklus erweitert werden kann. Die Maßnahmen des Spezialtiefbaus zählen zu den kostenintensivsten auf einer Baustelle. Großes Gerät und spezialisierte Firmen sind für eine erfolgreiche Durchführung unerlässlich. Da der Baugrund immer einen großen Unsicherheitsfaktor bildet, müssen geeignete, unterstützende Anwendungen zum Einsatz kommen. Hierfür bildet BIM eine geeignete Plattform. Protokolle, Maschinendaten und Kontrolldaten können hier webbasiert analysiert und für alle zugänglich gemacht werden, um zum einen die Transparenz zu steigern und zum anderen den Überblick, selbst bei hochkomplexen Bauvorhaben zu behalten. In dieser Arbeit soll ein Überblick über die aktuelle Forschungssituation im Bereich Building Information Modeling im Erdbau, speziell im Spezialtiefbau, gegeben werden. Die Ergebnisse die mit Hilfe vorhandener Publikationen und Forschungsarbeiten verschiedener Universitäten und namhafter Forschungsgruppen zusammengetragen wurden sollen eine Grundlage für die weitere Forschung in diesem Bereich bilden. Über die Aufgabenstellung hinaus wird zusätzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt. Es wird versucht eine überschnittene Bohrpfahlwand zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm für den Einsatz bewertet. KW - BIM KW - Erdbau KW - Spezialtiefbau KW - Building Information Modeling Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20160623-26140 ER - TY - THES A1 - Kratt, Helen T1 - Building Information Modeling im Erdbau - eine Potentialanalyse im Tiefbau N2 - Die meisten Baustellen bieten Optimierungspotential. Vor allem der Erdbau fordert durch seine hohe Dynamik und großen Unsicherheiten eine hohe Planungsleistung für jedes neue Projekt. Doch auch bei bester Planung und Vorbereitung kann der Bauprozess durch nicht vorhersehbare Einwirkungen aufgehalten werden. Dazu zählen Witterungseinflüsse, Baumaschinenausfälle, unvorhergesehene Bodenschichten und veränderte Zielsetzungen des Auftraggebers. Dies kann zu Störungen im Bauablauf führen, die eine Bauzeitverzögerung und eine Kostensteigerung nach sich ziehen. Um diese Probleme zu umgehen, sind ein verbesserter Informationsfluss, genaue Bodenaufschlüsse und eine exakte Dimensionierung des einzusetzenden Gerätes notwendig. Hier kann Building Information Modeling (BIM) zum Einsatz kommen. Diese Anwendung bietet die Möglichkeit, die Datengenauigkeit zu erhöhen, den Informationsfluss auf der Baustelle zu verbessern, eine Informationsplattform für alle Beteiligten zu schaffen und die Abläufe transparent zu gestalten. Außerdem ermöglicht die Anwendung Planungsschritte miteinander zu verknüpfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das über den gesamten Lebenszyklus erweitert werden kann. Die Grundlagen dieser Arbeit bilden die Begriffsdefinitionen zu Erdbau, Tiefbau und Building Information Modeling. Diese Arbeit setzt sich speziell mit Erdbauwerken und deren Sicherungsmaßnahmen auseinander. Darauf aufbauend wird im Rahmen einer Recherche der Forschungsstand im Bereich Building Information Modeling und Tiefbau zusammengefasst. Mit Hilfe einiger Forschungsbeiträge, -projekte, -verbände, Dissertationen und Anwendungsprogrammen wird ein Überblick geschaffen. Die Übersicht soll eine Grundlage für die weitere Forschung auf diesem Gebiet bilden. Abschließend findet eine Bewertung statt. Über die Aufgabenstellung hinaus wird zusätzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt, um aufzuzeigen, dass das Potential auf Erdbaustellen mit BIM-Anwendungen besser ausgeschöpft werden kann. Es wird versucht eine Gabionenwand, eine Sicherungsmaßnahme von Erdbauwerken zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm für den Einsatz im Tiefbau bewertet. KW - BIM KW - Erdbau KW - Tiefbau KW - Building Information Modeling Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20160623-26132 ER - TY - JOUR A1 - Benz, Alexander A1 - Taraben, Jakob A1 - Lichtenheld, Thomas A1 - Morgenthal, Guido A1 - Völker, Conrad T1 - Thermisch-energetische Gebäudesimulation auf Basis eines Bauwerksinformationsmodells JF - Bauphysik N2 - Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar. Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher. Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products. By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data. KW - Building Information Modeling KW - Energiebedarf KW - Gebäudehülle KW - Schnittstelle KW - Simulation KW - BIM KW - Gebäudesimulation KW - IFC-basierte Gebäudesimulation KW - thermische Gebäudehülle KW - building simulation Y1 - 2018 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20181221-38354 N1 - Copyright 2018 Ernst & Sohn. Dieser Artikel kann für den persönlichen Gebrauch heruntergeladen werden. Andere Verwendungen bedürfen der vorherigen Zustimmung der Autoren und des Verlags Ernst & Sohn. Der folgende Artikel erschien in der Bauphysik 40 (2), 2018 und kann unter folgendem Link abgerufen werden. https://www.ernst-und-sohn.de/app/artikelrecherche/artikel.php?lang=de&ID=38470&utm_source=eus&utm_medium=artikel-db&utm_campaign=Bp_2018_2 IS - 40, Heft 2 SP - 61 EP - 67 ER -