TY - CHAP A1 - Hauschild, Thomas A1 - Borrmann, André A1 - Hübler, Reinhard T1 - Integration of Constraints into Digital Building Models for Cooperative Planning Processes N2 - The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given. KW - Architektur KW - Verteiltes System KW - Constraint KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1775 ER - TY - CHAP A1 - Soibelman, Lucio A1 - O'Brien, William A1 - Elvin, George T1 - Collaborative Design Processes: A Class on Concurrent Collaboration in Multidisciplinary Design N2 - The rise of concurrent engineering in construction demands early team formation and constant communication throughout the project life cycle, but educational models in architecture, engineering and construction have been slow to adjust to this shift in project organization. Most students in these fields spend the majority of their college years working on individual projects that do not build teamwork or communication skills. Collaborative Design Processes (CDP) is a capstone design course where students from the University of Illinois at Urbana-Champaign and the University of Florida learn methods of collaborative design enhanced by the use of information technology. Students work in multidisciplinary teams to collaborate from remote locations via the Internet on the design of a facility. An innovation of this course compared to previous efforts is that students also develop process designs for the integration of technology into the work of multidisciplinary design teams. The course thus combines both active and reflective learning about collaborative design and methods. The course is designed to provide students the experience, tools, and methods needed to improve design processes and better integrate the use of technology into AEC industry work practices. This paper describes the goals, outcomes and significance of this new, interdisciplinary course for distributed AEC education. Differences from existing efforts and lessons learned to promote collaborative practices are discussed. Principal conclusions are that the course presents effective pedagogy to promote collaborative design methods, but faces challenges in both technology and in traditional intra-disciplinary training of students. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Computer Supported Cooperative Work Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1948 ER - TY - CHAP A1 - Keller, Martin A1 - Antoniadis, George A1 - Menzel, Karsten T1 - Resource Management for the Construction Industry N2 - The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Betriebsmittel Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1679 ER - TY - CHAP A1 - Menzel, Karsten A1 - Dittrich, Jörg A1 - Domschke, Sven T1 - About the implantation process of mobile computing in AEC N2 - The AEC industry is conscious of the potentials arising from the usage of mobile computer systems to increase productivity by streamlining their business processes. Discussions are no longer on whether or not to use a mobile computer solution, but rather, on how it should be used. However, the implantation process of this new technology in Architecture, Engineering and Construction (AEC) and Facility Management (FM) practise is very slow and should be improved. One way to encourage and ease the usage of mobile computer systems in AEC is a more process-oriented usability and context appropriateness of mobile computer solutions. Context-sensitivity is defined as a crucial feature to be taken into account for further research in the area of Mobile Computing. Context-sensitive, mobile IT-solutions depend on two features: (1) flexible definitions of (construction) processes describing the context and (2) tools for flexible, multi-dimensional information management representing the context. It is on this premise that the authors propose the n-dimensional data management approach for the implementation of mobile computing solutions. In this paper, we analyse working scenarios in the AEC and FM sector, defining context aspects which are transformed and formalized as dimension hierarchies of the envisaged context model. KW - Mobile Computing KW - Funknetz KW - Bauwesen Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1106 ER - TY - CHAP A1 - Gordon, Chris A1 - Akinci, Burcu A1 - Garrett, James H. T1 - An Approach for Planning Sensor-Based Inspection of the Built Environment N2 - The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site. KW - Monitorüberwachung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1500 ER - TY - CHAP A1 - van Rooyen, G.C. A1 - Olivier, A. H. T1 - Notes on structural analysis in a distributed collaboratory N2 - The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Finite-Elemente-Methode Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1451 ER - TY - CHAP A1 - Cheng, Jinxing A1 - Lau, Gloria A1 - Law, Kincho T1 - A simulation access language and framework for project management applications N2 - As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1567 ER - TY - CHAP A1 - Jianping, Zhang A1 - Tianyi, Ma A1 - Qiping, Shen T1 - Application of Data Warehouse and Data Mining in Construction Management N2 - All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper. KW - Bauwerk KW - Datenmanagement KW - Data-Warehouse-Konzept Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1247 ER - TY - CHAP A1 - König, Markus A1 - Klinger, Axel A1 - Berkhahn, Volker T1 - Structural Correctness of Planning Processes in Building Engineering N2 - The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Planungsprozess KW - Konsistenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1690 ER - TY - CHAP A1 - Suzuki, Aketo T1 - Numerical Analysis for Prediction as to Influence of Digging a Tunnel on Groundwater N2 - This paper describes monitoring of the in-valley discharge and underground water level at the place where the tunnel will be constructed and also, the numerical analysis for prediction applying the Tank Model and Linear Filter Method to calculate the prediction. The application of these analyses has actually allowed the change of underground water level to be grasped and more effective information system to be established by comparing the real-time monitoring data with the real-time calculation of prediction. KW - Mobile Computing KW - Funknetz KW - Tunnelbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1133 ER - TY - CHAP A1 - Xie, Haiyan A1 - Issa, Raja A1 - O'Brien, William T1 - Structure of a Formal User Model for Construction Information Retrieval N2 - Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction. KW - Bauwerk KW - Datenmanagement KW - Benutzeroberfläche Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1296 ER - TY - CHAP A1 - Miles, John A1 - Cen, Mei A1 - Taylor, Mark T1 - Linking Sketching and Constraint Checking for Early Conceptual Design N2 - At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients. KW - Konzipieren KW - Bauwerk KW - Management KW - Constraintnetz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1547 ER - TY - CHAP A1 - Miles, John A1 - Joita, Liviu A1 - Burnap, Peter T1 - Collaborative Engineering: Virtual Teams in a Grid Environment Supporting Consortia in the Construction Industry N2 - In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI). KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1362 ER - TY - CHAP A1 - Palm, Johan T1 - Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment N2 - The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1625 ER - TY - CHAP A1 - Olivier, A. H. T1 - An application-centred framework for distributed engineering applications N2 - The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Framework Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1353 ER - TY - CHAP A1 - Cheung, Moe M. S. A1 - Noruziaan, Bahman A1 - Li, W. C. T1 - Data acquisition, processing and management systems for a Canadian bridge monitoring project N2 - This paper will present a number of technical aspects for one of the most elaborate instrumentation and data acquisition projects ever undertaken in Canada. Confederation Bridge, the longest bridge built over ice covered seawater has been equipped with the state of the art data acquistition devices and systems as well as data transfer networks. The Bridge has been providing a fixed surface connection between Prince Edward Island and Province of New Brunswick in Canada since its opening in 1997. The Bridge has a rather long design service life of 100 years. Because of its large size and long span length, its design is not covered by any existing codes or standards worldwide. The focus of the paper is to introduce the data acquisition, transfer, processing and management systems. The instrumentation and communications infrastructure and devices will be presented in some details along with the data processing and management systems and techniques. Teams of engineers and researchers use the collected data to verify the analysis and design assumptions and parameters as well as investigate the short-term and long-term behaviour and health of the Bridge. The collected data are also used in furthering research activities in the field of bridge engineering and in elevating our knowledge about behaviour, reliability and durability of such complex structures, their components and materials. KW - Bauwerk KW - Datenmanagement KW - Brückenbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1235 ER - TY - CHAP A1 - Chou, Yu-Hur A1 - Hsieh, Shang-Hsien T1 - Design of Partial Scoring Assessment System for Reinforcement Concrete Design Course : Development of Partial Scoring Assessment System for Reinforcement Concrete Design Course N2 - In the field of Civil Engineering, the content of reinforcement concrete design course (RC course) has complicated design procedures and many difficult specifications to recognize, so most of the students regard the RC course a tough course, and teachers very often find the class time insufficient. Also, teachers of the RC course usually spend a lot of time in organizing the examinations for handling tedious calculations and complicated logical reasoning. Furthermore, correcting examination papers with partial scoring takes even more time of the teacher’s. Therefore, the objective of this research is to design and develop a partial scoring assessment system to meet the needs in engineering design courses, such as the RC course. This assessment system can generate test items with variable parameters. It also supports inference diagnosis on the examinee’s misconceptions and gives partial scores in grading the examination. In this research, the example test subject is the analysis of rectangular reinforced concrete beam with single layer steel bars. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Stahlbeton Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-905 ER - TY - CHAP A1 - Bürgy, Christian A1 - Garrett, James H. T1 - Supporting Domain Experts in Determining Viable User Interface Designs for Wearable Computers Used in AEC Work Situations N2 - The design of mobile IT systems, especially the design of wearable computer systems, is a complex task that requires computer science knowledge, such as that related to hardware configuration and software development, in addition to knowledge of the domain in which the system is intended to be used. Particularly in the AEC sector, it is necessary that the support from mobile information technology fit the work situation at hand. Ideally, the domain expert alone can adjust the wearable computer system to achieve this fit without having to consult IT experts. In this paper, we describe a model that helps in transferring existing design knowledge from non-AEC domains to new projects in the construction area. The base for this is a model and a methodology that describes the usage scenarios of said computer systems in an application-neutral and domain-independent way. Thus, the actual design information and experience will be transferable between different applications and domains. KW - Mobile Computing KW - Funknetz KW - Benutzeroberfläche KW - Mensch-Maschine-Kommunikation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1168 ER - TY - CHAP A1 - Breit, Manfred A1 - Kündig, Daniel A1 - Häubi, Fritz T1 - Project oriented learning environment (POLE-Europe) N2 - The presented work focuses on collaboration- experiences gathered with complex design and engineering projects, using the learning platform POLE- Europe. Within the POLE environment student-teams from different universities, disciplines and cultural backgrounds are assigned to real-world projects with clearly defined design - tasks, usually to be accomplished within one semester while working in a virtual environment for most of the time. The concept of POLE and the information and collaboration technology is described. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-935 ER - TY - CHAP A1 - Hassan, Tarek A1 - Shelbourn, Mark A1 - Carter, Chris T1 - Collaboration in Construction: Legal and Contractual Issues in ICT Applications N2 - The construction industry is a project-based business bringing together many different organisations to complete a desired goal. The strategic use of Information and Communication Technologies (ICT) has enabled this goal to be completed more effectively. Two issues require addressing, the technology itself and the implementation factors of the technology. Such implementation factors should consider, among other factors, the legal and contractual issues associated with the use of ICT, training requirements and its effects on the organisational culture. To date the legal and contractual issues have not been extensively covered, and it is recognised that the technologies have not been properly covered by any recognised legal and contractual practices. This in turn is threatening to inhibit the growth and prosperity of the use of the technology on construction projects. This paper discusses these legal and contractual issues and describes methods and tools that can be used to enable the growth of technology to be used in a legal and contractually valid environment. KW - Forschung KW - Europa KW - Informationstechnik KW - Bauindustrie KW - Vertrag Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2005 ER -