TY - CHAP A1 - Wellmann Jelic, Andres A1 - Baitsch, Matthias A1 - Hartmann, Dietrich T1 - Distributed computing of failure probabilities for structures in civil engineering N2 - In this contribution the software design and implementation of an analysis server for the computation of failure probabilities in structural engineering is presented. The structures considered are described in terms of an equivalent Finite Element model, the stochastic properties, like e.g. the scatter of the material behavior or the incoming load, are represented using suitable random variables. Within the software framework, a Client-Server-Architecture has been implemented, employing the middleware CORBA for the communication between the distributed modules. The analysis server offers the possibility to compute failure probabilities for stochastically defined structures. Therefore, several different approximation (FORM, SORM) and simulation methods (Monte Carlo Simulation and Importance Sampling) have been implemented. This paper closes in showing several examples computed on the analysis server. KW - Konzipieren KW - Bauwerk KW - Verteiltes System KW - Fehler KW - Stochastik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1030 ER - TY - THES A1 - Huth, Olaf T1 - Ein adaptiertes Polyreferenz-Verfahren und seine Anwendung in der Systemidentifikation T1 - An adapted Polyreferenz procedure and its application in the system identification N2 - Die vorliegende Arbeit gliedert sich in das Gebiet der Systemidentifikation ein. Besonderes Augenmerk wird auf die Detektion, die Lokalisierung und die Quantifizierung von Systemveränderungen gerichtet. Für diese Ziele werden -basierend auf Schwingungsmessungen- modale Parameter sowie Ein- und Ausgangsgrößen im Frequenzbereich extrahiert. Die in dieser Arbeit entwickelte Adaption des Polyreferenz-Verfahrens beruht auf einer veränderten Bestimmung der Fundamentalmatrix mit Hilfe der verallgemeinerten Singulärwertzerlegung. Eine Vorfilterung, die eine Reduktion der Frequenzanteile im Signal bewirkt, ist dabei Voraussetzung. Diese basiert auf dem Einsatz rekursiver Filtertechiken und der einfachen Singulärwertzerlegung. Als Resultat können modale Parameter auch im Falle, wenn eng benachbarte und verrauschte Signalanteile vorliegen oder nur wenige Mess- und Anregungspunkte zur Verfügung stehen, präzise bestimmt und damit auch sehr geringe Syemveränderungen detektiert werden. Die mit dem adaptierten Polyreferenz-Verfahren extrahierten modalen Parameter werden in der Lokalisierung von Systemveränderungen eingesetzt. Zur Bestimmung modaler Parameter auch an realen Bauwerken wird die Konstruktion eines Impulshammers vorgestellt. Besonderes Gewicht wird dabei auf die Gestaltung des Erregerkraftspektrums gelegt. Die Arbeit enthält eine mögliche Vorgehensweise zum Abgleich von Finite-Elemente Modellen. In vielen praxisnahen Fällen sind weit weniger modale Parameter vorhanden, als freie, zum Abgleich bestimmte Parameter gesucht werden. Das Gleichungssystem ist schlechtgestellt und benötigt eine Regularisierung. Eine andere Möglichkeit zur Korrektur von Rechenmodellen bietet das Projektive Eingangsgrößenverfahren, das auf der Basis unvollständig gemessener Ein- und Ausgangsgrößen arbeitet. In einer Versagenswahrscheinlichkeitsstudie wird die Robustheit des Verfahrens gegenüber! Rauscheinflüssen untersucht N2 - This PhD thesis is related to the field of system identificaton focusing on detection of occurence, localisation and amount assessment of damage. This is done as well by extraction of modal parameters as input- and output residuals from vibration measurements. The presented work describes a developed adaption of the polyreference-procedure. It is based on a determination of the fundamental matrix by using the generalized singular value decomposition. A pre-filtering of the time series which kept the signals in a narrow frequenvy band higly supports this application. Two kinds of filter techniques can be combined: The classical way of recursive filter technique and the tool of the singular value decomposition. Therefore, modal parameters can be determined precisley in different cases if the data are strongly corrupted by noise, only few measuring- and excitation points are available, close-spa! ced frequency parts appear in the signal. This facts allow the detection of small structural changes in dynamic systems. The modal parameters extracted by the adapted polyreference-procedure are applied to localise the damage. For the extraction of modal parameters on real structures the construction of an impact hammer is presented with particular respect to the configuration of the excitation spectra. This work contains a possible way for a finite element model updating. In many relevant cases, if much more free parameters are searched than modal parameters are available, this problem is ill-posed and needs regularisation. The Projective Input Residual Method (PIRM) follows another way to correct computational models. It is operational on the extraction of input- and output residuals. Within a reliability study the robustness of the PIRM against noise influences is investigated. KW - Systemidentifikation KW - Bauwerk KW - Dynamische Belastung KW - Technische Überwachung KW - Langzeitverhalten KW - Modale Parameter KW - Schadensdiagnose KW - Schadensanalyse KW - Strukturdynamik KW - structural dynamics KW - system identification KW - modal parameters KW - fault diagnosis Y1 - 2002 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20040202-34 ER - TY - CHAP A1 - Kolbe, P. A1 - Ranglack, D. A1 - Steinmann, Frank T1 - Eine Schnittstelle für dynamische Objektstrukturen für Entwurfsanwendungen N2 - Trotz der langjährigen Erfahrung bei der Anwendung objektorientierter Konzepte bei der Modellierung von Gebäuden ist es bisher nicht gelungen, ein allgemein anerkanntes Gebäudemodell im Rechner abzubilden. Das mag zum einen daran liegen, daß die Standardisierung eines solchen Modells bis heute zu keinem Abschluß gekommen ist. Zum anderen aber scheint vor allem die Problematik der Abbildung eines solchen Gebäudemodells in das Objektmodell einer Programmiersprache bisher unterschätzt worden zu sein. Die erhoffte Durchgängigkeit von objektorientierter Analyse, Entwurf und Programmierung gelingt bei Anwendungen für Entwurfsaufgaben nicht. Das gilt vor allem für Anwendungen, die frühe Entwurfsphasen unterstützen und damit erst zur Definition eines Gebäudemodells beitragen. Im Bereich der Softwareentwicklung wird das Konzept des Objektes als Ordnungsbegriff zur Strukturierung von Softwaremodulen benutzt. Die Übertragung dieser Ordnung in die Welt des Ingenieurs oder Architekten zur Bezeichnung eines konkreten Elements aus einem Modell (Raum 42 aus der Menge aller Räume des Gebäudes Blumenstraße 7) kann daher nur zu begrenzten Erfolgen führen. Aus der Analyse der Widersprüchlichkeit des Objektbegriffs zwischen Softwareentwickler (Programmierer) und Softwareanwender (Ingenieur, Architekt) wird im folgenden ein Laufzeitsystem für dynamische Objektstrukturen entwickelt, das es dem Softwareentwickler erlaubt, sowohl auf die Struktur als auch auf die Ausprägung eines Modells zuzugreifen. Dem Softwareanwender können damit Werkzeuge zur Verfügung gestellt werden, die es ihm gestatten, Gebäudemodelle zu definieren. Das Laufzeitsystem enthält zum einen eine Reihe von Klassen, die es ermöglichen, die Struktur von Anwenderobjekten dynamisch zu beschreiben und zu analysieren. Eine zweite Art von Klassen erlaubt das Erzeugen und Verändern von Anwenderobjekten, die diesen Strukturen entsprechen KW - Bauwerk KW - CAD KW - Objektmodell Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4555 ER - TY - CHAP A1 - Hauschild, Thomas A1 - Hübler, Reinhard T1 - Entwicklung eines verteilbaren und kooperativ nutzbaren objektorientierten CAAD-Produktmodellierkerns N2 - Der Fokus des Projektes liegt auf einer besseren Unterstützung der kooperativen Aspekte im Bauwerksentwurf und der Anwendung von ComponentWare-Techniken in der Architektur des Entwurfssystems. Es muß festgestellt werden, daß die Kooperation der Beteiligten im Entwurfsprozeß von Bauwerken durch die heute praktizierten Datenaustauschverfahren nicht oder nur unbefriedigend unterstützt wird und das keine Lösung dieses Problems durch die Weiterentwicklung von filebasierten Datenaustauschformaten zu erwarten ist. Im Rahmen des Projektes wird mit einer CORBA-Umgebung für Smalltalk-80 ein verteilbares Objektsystem realisiert. Als Architektur des Systems wurde eine hybride Herangehensweise gewählt, bei der allgemeine Informationen auf einem zentralen Server verwaltet werden und die eigentlichen Projektinformationen bei Bedarf repliziert werden. Wie allgemein in GroupWare - orientierten Systemen notwendig, müssen effektive Mechanismen der Nebenläufigkeitskontrolle und zur Sperrung bestimmter Modellbereiche realisiert werden. Wichtig ist für kooperative Entwurfssysteme die Systemunterstützung der Beseitigung der Folgen von kollidierenden Entwurfsintensionen durch die Bearbeiter. Dazu werden unter anderem Remote-Pointer-Mechanismen realisiert. In Abhängigkeit von der Rolle eines Bearbeiters werden diesem Sichten auf des Objektmodell (Partialmodelle) zugeordnet. Es werden Mechanismen zur Autorisierung des Zugriffs auf Partialmodelle implementiert, zu diesem Zweck erfolgt eine Nutzerauthentifizierung. Beziehungen zwischen Partialmodellen werden durch eine spezielle Relation im Objektsystem abgebildet. Die Konzeption des Objektsystems lehnt sich an die PREPLAN-Philosophie an. Das impliziert die Unterstützung von Entwurfshandlungen sowohl in Bottom-Up- als auch in Top-Down - Richtung. Benutzer können das Objektsystem um eigene Klassen erweitern bzw. existierende Klassen modifizieren und Attribute mit Defaultwerten belegen, um das System inkrementell mit Domänenwissen anreichern zu können. Von großer Bedeutung für kooperative Entwurfssysteme sind eine Versionsverwaltung und die Bereitstellung von Undo - und Redo - Mechanismen. Es ist möglich, multimediale Daten im Objektmodell abzulegen und diese in Abhängigkeit von ihrem Format wiederzugeben bzw. zu bearbeiten. Das beschriebene System befindet sich derzeit in der Implementierung. KW - Bauwerk KW - Architektur KW - CAD KW - Datenaustausch Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4475 ER - TY - CHAP A1 - Petersen, Michael A1 - Seewald, Gerrit T1 - Establishing of fundamentals in building projects using web services N2 - During the establishing of fundamentals in a building project a huge amount of influence factors and boundary conditions have to be investigated in order to provide the prerequisites for further planning processes. These investigative tasks are often related with a great effort concerning time and money, because there are no standardized workflows and interfaces which provide an efficient access to the necessary information related to a specific construction site. Within the fundamental investigation human and natural circumstances have to be taken into account. Thus, in this project two examples have been chosen in order to demonstrate the holistic approach for an integration and provision of georeferenced information. The developed internet-site http://www.grundlagenermittlung.de has been designed to support architects and civil engineers in early planning phases of a building project efficiently. It offers web-based services based on dynamic interfaces for a flexible search and collection of information concerning the building site. Therefore, a central Metadatabase-Server for Description, Discovery and Integration has been established which enables a registration of georeferenced services and the redirection of incoming requests to other, distributed data pools. Using this Yellow-Page concept in combination with the underlying meta-data based on the ISO 19115 standard an efficient investigation of geographical and environmental information becomes possible. KW - Bauwerk KW - Datenmanagement KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1273 ER - TY - CHAP A1 - Asayama, Shuichi A1 - Mae, Toshifumi T1 - Fractal Truss Structure and Automatic Form Generation Using Iterated Function System N2 - This paper describes a couple of new truss structures based on fractal geometry. One is the famous Sierpinski Gasket and another is a fractal triangle derived by means of applying a process forming leaves of a cedar tree using M. F. Barnsley’s contraction mapping theory. Therefore a pair of x-y coordinates of an arbitrary nodal point on the structures are generated easily if IFS(Iterated Function System) codes and a scale of them are specified. Structural members are defined similarly. Thus data for frame analysis can be generated automatically, which is significant if the objective structure has complex configuration. Next analytical results under vertical and wind loadings in Japanese Building Code are shown. Here members are assumed to be timber and to have cross section of 15cm×15cm. Finally authors conclude that geometrically new truss structures were developed and automatic data generation for frame analysis was attained using IFS. Analytical results show they contribute to saving material when compared it with King-post truss. KW - Konzipieren KW - Bauwerk KW - Fraktal Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1046 ER - TY - CHAP A1 - Walukiewicz, Henryk T1 - Identification of Structural Models as a Problem of Group Representation Theory N2 - It has been shown that symmetries of moment functions of stochastic processes play an important role in identification of systems. They provide the group-theoretic method of choice of the model structure and model parameters. In the first stage the group-theoretic analysis of some fundamental concepts of stochastic dynamics: stochastic processes and functional series of Volterra-Wiener type has been undertaken. The analysis of group representations of the moment functions of order m for stochastic processes is the basic, original concept of the work. The following groups: symmetric Sm, special affine SAff(m), general linear GL(n, R), GL(n,C) and their subgroups play the main role in the models. In the second stage the informational entropy has been introduced as a measure of the randomness in the identified models. The group-theoretic approach underlines the unity of the nonlinear system identification and leads to useful engineering results in the range of the second-order (stochastic) theory. KW - Bauwerk KW - Modellierung KW - Gruppentheorie Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3725 ER - TY - JOUR A1 - Willenbacher, Heiko A1 - Hübler, Reinhard T1 - Intelligent Link-Management for the Support of Integration in Building Life Cycle N2 - The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants. KW - Mehragentensystem KW - Lernendes System KW - Bauwerk KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2223 ER - TY - THES A1 - Willenbacher, Heiko T1 - Interaktive verknüpfungsbasierte Bauwerksmodellierung als Integrationsplattform für den Bauwerkslebenszyklus T1 - Interactive link-based building modelling as an integration platform for the building life cycle N2 - Den Gegenstand der Dissertation bilden die Konzeption und die exemplarische Realisierung eines verknüpfungsbasierten Bauwerksmodellierungsansatzes zur Schaffung einer integrierenden Arbeits- und Planungsumgebung für den Lebenszyklus von Bauwerken. Die Basis der Integration bildet ein deklarativ ausgerichteter Bauwerksmodellverbund bestehend aus abstrahierten, domänenspezifischen Partialmodellen. Auf Grund der de facto existierenden Dynamik im Bauwerkslebenszyklus werden sowohl der Bauwerksmodellverbund als auch die einzelnen Partialmodelle dynamisch modifizierbar konzipiert und auf Basis spezieller Modellverwaltungssysteme technisch realisiert. Die Verständigung innerhalb der vorgeschlagenen Gesamtbauwerksmodellarchitektur basiert auf anwenderspezifisch zu erstellenden Verknüpfungen zwischen den Partialmodellen und wird im Sinne einer hybriden Modellarchitektur durch eine zentrale, die Verknüpfungen verwaltende Komponente koordiniert. Zur Verwaltung und Abarbeitung der Verknüpfungen wird der Einsatz von Softwareagenten im Rahmen eines Multiagentensystems vorgeschlagen und diskutiert. N2 - The subject of this thesis is the conception and the exemplary realisation of a link-based building modelling approach for the creation of an integrating work and planning environment for the life cycle of buildings. The basis of the integration forms a declarative aligned building model compound consisting of abstract, domain-specific partial models. Due to the in fact existing dynamics in the building life cycle, both the building model compound and the individual partial models are dynamically modifiable. The communication within the suggested total building model architecture is based on specific links provided by users between the partial models. This link-based communication is co-ordinated in the sense of a hybrid model architecture by a central, the links administering component. For the administration and processing of the links, a multiagent-system is suggested. KW - Bauwerk KW - Modellierung KW - Produktlebenszyklus KW - Planungsprozess KW - Mehragentensystem KW - Partialmodelle KW - Integration KW - Bauwerkslebenszyklus KW - Dynamik KW - Verknüpfungen KW - building modelling KW - partial models KW - building life cycle KW - dynamics KW - links Y1 - 2002 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20040216-328 ER - TY - CHAP A1 - Peng, Jun A1 - Law, Kincho A1 - Lau, Gloria T1 - Internet-Enabled Software Model for Nonlinear Structural Analysis and Simulations N2 - This paper describes an Internet-enabled software model that could facilitate the development and utilization of nonlinear structural analysis programs. The software model allows users easy access to the analysis core program and the analysis results by using a web-browser or other application programs. In addition, new and legacy codes can be incorporated as distributed services and be integrated with the software framework from disparate sites. A distributed project management system, taking advantages of Internet and database technologies, is implemented to store and manage model information and simulation results. Nonlinear dynamic analysis and simulations of a bridge structure is performed to illustrate the facilities of the Internet-enabled software model. KW - Konzipieren KW - Bauwerk KW - Verteiltes System KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1057 ER - TY - CHAP A1 - Miles, John A1 - Cen, Mei A1 - Taylor, Mark T1 - Linking Sketching and Constraint Checking for Early Conceptual Design N2 - At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients. KW - Konzipieren KW - Bauwerk KW - Management KW - Constraintnetz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1547 ER - TY - JOUR A1 - Rüppel, Uwe T1 - Multimediale Gestaltung von Bestandsverwaltungsprozessen im Bauwesen N2 - Die Kosten für die Unterhaltung von Bauwerken über den Lebenszyklus sind im Vergleich zu den Planungs- und Herstellungskosten erheblich größer. Insbesondere setzt eine Reduzierung des Instandhaltungsaufwandes als Teilprozeß der Bestandsverwaltung das rechtzeitige Erkennen von Bauschäden und das vorausschauende Ergreifen von Gegenmaßnahmen voraus. Das planmäßige Vorgehen beim Erkennen von Bauschäden, d.h. die regelmäßige Überwachung baulicher Anlagen, dient nicht nur dem sparsamen Umgang mit vorhandenen Mitteln, sondern verringert auch die Gefahr des plötzlichen Versagens von tragenden Bauteilen. Dadurch werden Gefahren für die Nutzer der Bauwerke frühzeitig abgewendet. Die Notwendigkeit der systematischen Instandhaltung mit modernen Methoden wird auch in den Schlußfolgerungen des dritten Bauschadensberichts des Bundesministeriums für Raumordnung, Bauwesen und Städtebau unterstrichen. Um den Zustand eines Bauteils festzustellen, werden ausreichende Informationen über Struktur, Material, Alter, Belastungen, Umweltbedingungen etc. benötigt. Zur Verarbeitung dieser Fülle von Informationen unterschiedlichen Typs (z.B. technische Dokumente, CAD-Zeichnungen, Photos etc.) bei der Überwachung und Dokumentation baulicher Anlagen ist eine geeignete DV-Unterstützung notwendig. Zur Verwaltung der komplexen Baustrukturinformationen werden objektorientierte Bauwerksmodelle benötigt. Zur bedarfsgerechten Aufbereitung der unterschiedlichen Informationsarten und -qualitäten ist zusätzlich eine multimediale Informationsverarbeitung sowohl intern als auch in der Benutzungsschnittstelle erforderlich. Im Beitrag werden die Grundlagen objektorientierter Methoden zur Bauwerksmodellierung sowie von Multimedia mit den Bereichen Text, Graphik (Vektor- und Pixelgraphik), Audio, Photo und Video einschließlich deren Verknüpfungsmöglichkeiten im Sinne von Hypermedia an Beispielen erläutert. Zusätzlich werden aktuelle Entwicklungstendenzen im Bereich der Telekommunikation mit den Möglichkeiten des Computernetzes INTERNET zur Bestandsverwaltung in verteilten Systemen aufgezeigt. Abschließend werden Anwendungen der objektorientierten und multimedialen Informationsverarbeitung in der täglichen Ingenieurpraxis am Beispiel des DV-Systems BestandManager zur Überwachung und Dokumentation baulicher Anlagen vorgestellt. KW - Bauwerk KW - Langzeitverhalten KW - Bauschaden KW - Instandhaltung KW - Objektmodell Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4839 ER - TY - CHAP A1 - Bargstädt, Hans-Joachim A1 - Blickling, Arno T1 - Neue Methoden für die bauteilorientierte Ausschreibung und Kalkulation unter Beachtung des Integrated Product Lifecycle Management von Bauwerken N2 - Die Autoren stellen Grundlagen und Methoden zur Erstellung von Ausschreibungen und zur Durchführung der Kalkulation vor, die direkt mit dreidimensionalen Bauteilmodellen arbeiten. Dies trägt dazu bei, den gesamten Lebenszyklus eines Bauwerkes durchgängig über 3-D-Modelle beschreiben zu können. Im ersten Abschnitt werden grundlegende Überlegungen zum Einsatz von PLM/PDM-Technologien im Bauwesen angestellt. Im Anschluß daran wird die herkömmliche Ausschreibungsmethodik analysiert. Die Unterschiede zwischen einem konventionellen Leistungsverzeichnis und einem dreidimensionalen Bauteilkatalog (Objektdatenbank) hinsichtlich der Datenstruktur werden dargestellt. Hieraus abgeleitet werden Methoden und Prozesse bei der Erstellung einer 3-D-Leistungsbeschreibung entwickelt. Dazu wird eine geeignete Benutzer-Schnittstelle eines dreidimensionalen Bauteilkataloges vorgestellt. Schließlich werden praxisrelevante Probleme bei der Verwendung von Bauteilkatalogen erörtert. Ein wesentlicher Baustein ist die Kalkulation. Hier werden Kalkulationsmethoden basierend auf einem zweidimensionalen Leistungsverzeichnis und einem dreidimensionalen Bauteilkatalog miteinander verglichen. Ergänzt wird dies um Lösungen zur Anbindung von elektronischen Marktplätzen an den Bauteilkatalog zum Zweck der Preisbildung. Schließlich wird ein Ausblick gegeben, wie eine Synthese zwischen dreidimensionalem Bauteilkatalog und textlichen Standard-Leistungsbeschreibungen erreicht werden kann. KW - Bauwerk KW - Kalkulation KW - Ausschreibung KW - Bauteil KW - Katalog KW - Dreidimensionales Modell Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-70 ER - TY - CHAP A1 - Romberg, Richard A1 - Treeck, Christioph van A1 - Niggl, Andreas T1 - Numerische Simulation auf Basis des IFC-Bauwerksmodells N2 - Dieser Beitrag zeigt einen Ansatz, verschiedene numerische Simulationsaufgaben auf ein gemeinsames und durchgängig dreidimensionales Geometriemodell zu gründen. Hinsichtlich der physikalischen Modelle reicht die Bandbreite der hier vorgestellten Anwendungen von einer ganzheitlichen Betrachtung der Gebäudestruktur in der Strukturmechanik über die raumbezogene, hochauflösende Modellierung konvektiver Raumluftströmungen bis hin zur Simulation des thermischen Verhaltens eines ganzen Gebäudes. Das jeweils zugrunde liegende numerische Verfahren setzt dabei auf einem stets gleichen Zwischenmodell der realen Geometrie der Struktur auf, ohne dabei vereinfachende dimensionsreduzierte Modelle anzuwenden. Nachfolgende Werkzeuge werden derzeit im Rahmen mehrerer Forschungsprojekte an dieses Geometriemodell angeschlossen: Die p-Version der FEM für die Strukturanalyse, ein sog. Mehrzonenmodell für die thermische Gebäudesimulation sowie ein auf dem sog. hybriden thermischen Gitter-Boltzmann-Verfahren (hTLBE) basierender Strömungssimulationscode. Der Import geometrischer wie semantischer Daten eines Bauwerks in das Simulations-Framework erfolgt nach dem Produktmodell der Industry Foundation Classes (IFC), das sich als Quasi-Standard für den Datenaustausch im Bauwesen etabliert hat. Das IFC-Schema dient dabei nicht als Modell zur internen Speicherung von Daten, sondern wird hier als Schnittstelle zur Anbindung unterschiedlicher Programme wie CAD-Anwendungen für Architekten oder anderen Modellierungstools verwendet. Die Implementierung dieser Schnittstelle erfolgt unter Verwendung einer sog. Toolbox, die das Objektschema der IFC auf ein Klassenmodell einer objektorientierten Programmiersprache abbildet und Werkzeuge für den effizienten Objektzugriff zur Verfügung stellt. Damit werden Grenzen zwischen spezialisierten Softwarepaketen, die maßgeschneidert auf spezielle Erfordernisse ausgerichtet sind, aufgebrochen und der Datenaustausch über die Anwendungsgrenzen hinaus unterstützt. Dies ist eine Konsequenz aus einer dem Wunsch nach vernetzt-kooperativen Planung von Bauwerken.... KW - Bauwerk KW - Dreidimensionales Modell KW - Datenaustausch Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3521 ER - TY - CHAP A1 - Nour, Mohamed A1 - Beucke, Karl T1 - Object Information Packs as a Base for Information Modelling in Construction N2 - The construction industry is suffering form the existence of isolated islands of software applications and bottle neck solutions. The idea of an integrated virtual database that consists of separated platforms, representing various disciplines, depending on the web technology is envisaged to solve the problem of integration. This paper is about the production and use of OIPs (Object Information Packs) as a part of the construction material product in the form of XML files that include all the technical and commercial data of the product, which might be needed by any discipline in its overall life cycle. This object information pack is neutral and independent of any software application. It is assumed to fit in a building product model at the IFC (resource layer). An example of brick - wall aggregation process is used to demonstrate the capability of the technology and the ability of non computer science experts to use it. KW - XML KW - Bauwerk KW - Objektmodell KW - Internet KW - IFC KW - OIP KW - Building Object Model Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3387 ER - TY - CHAP A1 - Baitsch, Matthias A1 - Hartmann, Dietrich T1 - Object Oriented Finite Element Analysis for Structural Optimization using p-Elements N2 - The optimization of continuous structures requires careful attention to discretization errors. Compared to ordinary low order formulation (h-elements) in conjunction with an adaptive mesh refinement in each optimization step, the use of high order finite elements (so called p-elements) has several advantages. However, compared to the h-method a higher order finite element analysis program poses higher demands from a software engineering point of view. In this article the basics of an object oriented higher order finite element system especially tailored to the use in structural optimization is presented. Besides the design of the system, aspects related to the employed implementation language Java are discussed. KW - Konzipieren KW - Bauwerk KW - Finite-Elemente-Methode Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1089 ER - TY - JOUR A1 - Abrahamczyk, Lars A1 - Uzair, Aanis T1 - On the use of climate models for estimating the non-stationary characteristic values of climatic actions in civil engineering practice JF - Frontiers in Built Environment N2 - The characteristic values of climatic actions in current structural design codes are based on a specified probability of exceedance during the design working life of a structure. These values are traditionally determined from the past observation data under a stationary climate assumption. However, this assumption becomes invalid in the context of climate change, where the frequency and intensity of climatic extremes varies with respect to time. This paper presents a methodology to calculate the non-stationary characteristic values using state of the art climate model projections. The non-stationary characteristic values are calculated in compliance with the requirements of structural design codes by forming quasi-stationary windows of the entire bias-corrected climate model data. Three approaches for the calculation of non-stationary characteristic values considering the design working life of a structure are compared and their consequences on exceedance probability are discussed. KW - Klimaänderung KW - Bauwerk KW - climate change KW - climate models KW - extreme value analysis KW - characteristic value KW - OA-Publikationsfonds2023 Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20230524-63751 UR - https://www.frontiersin.org/articles/10.3389/fbuil.2023.1108328/full VL - 2023 IS - volume 9, article 1108328 SP - 1 EP - 9 PB - Frontier Media CY - Lausanne ER - TY - CHAP A1 - Menzel, Karsten A1 - Garrett, James H. A1 - Mahdavi, A. A1 - Ries, R. T1 - Processing "fuzzy" materials sets for environmental impact analysis of buildings N2 - Processing technical and environmental data on building materials, components, and systems has become more important during the last few years. Increased sensitivity towards environmental and energy problems has lead to the demand for simulation and evaluation of the long term behavior of buildings. The results of such simulations are expected to enable architects and engineers to develop a broader, interdisciplinary understanding of the impact of their products (buildings) on the environment. However, conducting such evaluations is currently hampered by the lack of comprehensive, up-to-date, and ecologically relevant data on building materials, components, and systems. To address this problem, this paper proposes an approach to deal with the absent or uncertain attributes of building materials, components, and systems. In the past, various information systems have been developed to provide data on a limited set of building materials, including precise values pertaining to some of their characteristics, such as availability, manufacturers, costs, etc. These traditional information systems have difficulty in dealing with uncertain, incomplete and sparse data. However, uncertainty and incompleteness characterize the nature of most of the available and environmentally related characteristics of materials, components, and systems. In this paper, a fuzzy-logic-based augmentation of traditional information systems is proposed towards providing management, utilization and manipulation of incomplete and uncertain data. KW - Bauwerk KW - Umweltfaktor KW - CAD KW - Fuzzy-Logik Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4500 ER - TY - CHAP A1 - Schultmann, Frank T1 - Projektplanungsmodelle und -methoden für den Rückbau von Bauwerken N2 - Vor dem Hintergrund einer sich verschärfenden Umweltgesetzgebung sowie der Erkenntnis, dass Bauabfälle sich grundsätzlich für eine Stoffkreislaufführung eignen, hat der Rückbau von Bauwerken in den letzten Jahren verstärkt an Bedeutung gewonnen. Aufgrund oftmals strenger Zeit- und Kostenvorgaben für einen Rückbau, begrenzter Verfügbarkeit von Personal und Betriebsmitteln, einer weitgehenden Unikatfertigung sowie wechselnder Standorte kommt dabei der projektorientierten Planung von Maßnahmen auf der Baustelle große Bedeutung zu. Im Rahmen des Beitrages werden Ansätze zur Modellierung und Lösung der sich hieraus ergebenden Probleme zur Planung und Optimierung von (Rück-) Bauabläufen unter Verwendung von Projektplanungsmodellen und -methoden vorgestellt. Hierbei werden neben betriebswirtschaftlichen auch umweltrelevante sowie technische Fragestellungen im Zusammenhang mit der Planung von Rückbauprojekten aufgegriffen. Eine Anwendung der Planungsansätze auf reale Gebäude zeigt, dass sich durch Kombination von Gebäuderückbau und Aufbereitungstechnik eine Qualitätsverbesserung von Recyclingbaustoffen erzielen lässt. Zur Umsetzung der hierzu erforderlichen Maßnahmen werden unter Berücksichtigung individueller abfallwirtschaftlicher Rahmenbedingungen der jeweiligen Planungsregion, gebäude- und baustellenbezogener Besonderheiten, technischer sowie kapazitiver Restriktionen Ablaufpläne für den Gebäuderückbau berechnet. Die für unterschiedliche Planungsregionen vorgenommenen Modellrechnungen weisen nach, dass sich die Demontage von Gebäuden gegenüber einem konventionellen Gebäudeabbruch unter bestimmten Rahmenbedingungen bereits wirtschaftlich vorteilhaft realisieren lässt. Abgerundet wird der Beitrag durch einen Ausblick auf Möglichkeiten einer Realisierung komplexer Bauabläufe auch unter strengen Zeitvorgaben sowie bei begrenzten Platzverhältnissen mit Hilfe fertigungssynchroner Ressourceneinsatzplanung sowie auf die Berücksichtigung von Unsicherheiten in der Planung und Ausführung von Rückbauprojekten. KW - Bauwerk KW - Demontage KW - Bauplanung KW - Bauablauf KW - Stoffkreislauf Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-162 ER - TY - JOUR A1 - Voronin, V. P. T1 - Renovation's peculiarities of industrial enterprises in conditions of economic selfsufficiency N2 - Probleme of recrienfation of building complex, to the sharp increase of share of reconstruction works, capital repair and modernisation of in-dustrial plants are concidered in this work. The conception of develop-ment and creation of unitified system of expluatation and renovation of industrial plants are worded out. This system is based on date-computer technology and taking into conciderations of real economic relations. KW - Bauwerk KW - Rekonstruktion KW - Wirtschaftlichkeit Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5296 ER -