TY - JOUR A1 - Motawa, Ibrahim A1 - Anumba, Chimay A1 - El-Hamalawi, A. T1 - Development of a Fuzzy System for Change Prediction in Construction Projects N2 - Change management has been the focus of different IT systems. These IT systems were developed to represent design information, record design rationale, facilitate design coordination and changes. They are largely based on managing reactive changes, particularly design changes, in which changes are recorded and then propagated to the relevant project members. However, proactive changes are hardly dealt with in IT systems. Proactive changes require estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. This is a major outcome of the case studies carried out as part of this research. Therefore, the proposed model considers that incomplete knowledge and certain project characteristics are always behind change causes. For proactive changes, predicting a change event is the main task for modelling. The prediction model should strive to integrate these main elements: 1) project characteristics that lead to change 2) causes of change, 3) the likelihood of change occurrence, and 4) the change consequences. It should also define the dependency relationships between these elements. However, limited data (documented) are only available from previous projects for change cases and many of the above elements can only be expressed in linguistic terms. This means that the model will simulate the uncertainty and subjectivity associated with these sets of elements. Therefore, a fuzzy model is proposed in this research to capture these elements. The model analyses the impact of each set of elements on the other by assigning fuzzy values for these elements that express the uncertainty and subjectivity of their impact. The main aim is to predict change events and evaluate change effects on project parameters. The fuzzy model described above was developed in an IT system for operational purposes and was designed as a Java package of components with their supporting classes, beans, and files. This paper describes the development and the architecture of the proposed IT system to achieve these requirements. The system is intended to help project teams in dealing with change causes and then the change consequences in construction projects. KW - Mehragentensystem KW - Lernendes System KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2180 ER - TY - JOUR A1 - Most, Thomas A1 - Eckardt, Stefan T1 - Application of a hybrid parallelization technique to accelerate the numerical simulation of nonlinear mechanical problems N2 - This paper presents the combination of two different parallelization environments, OpenMP and MPI, in one numerical simulation tool. The computation of the system matrices and vectors is parallelized with OpenMP and the solution of the system of equations is done with the MPIbased solver MUMPS. The efficiency of both algorithms is shown on several linear and nonlinear examples using the Finite Element Method and a meshless discretization technique. KW - Framework KW - API KW - Parallelverarbeitung KW - Finite-Elemente-Methode Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2599 ER - TY - JOUR A1 - Monobe, Kantaro A1 - Tanaka, Shigenori A1 - Furuta, Hitoshi T1 - Development of a System for Making Guide Maps based on the Idea of the Cognitive Map N2 - Digital maps are very easily applied as route guide maps. Route guide maps are provided through Web or a mobile phone services, and demand for such services is increasing. However, the production of a route guide map requires a great deal of time. Therefore, it is difficult for general users to make route guide maps. The purpose of the present research is the development of a system that can generate a route guide map using the Digital Map 2500 (Spatial Data Framework) published by the Geographical Survey Institute. This system will not require advanced equipment or expert knowledge. Therefore, anyone can produce route guide maps easily and quickly. By using the Digital Map 2500, the time and cost required in order to generate a map are reduced. Moreover, a useful route guide map can be created by simplifying the map form based on the human cognitive map. KW - Geoinformationssystem KW - Straßenkarte Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2688 ER - TY - CHAP A1 - Molkenthin, Frank T1 - Web-based Collaborative Engineering based on Information Sharing - HydroWeb: An Education Experiment in the Internet N2 - This paper describes the concept and experiences of the international Open Distance Learning Course ‘HydroWeb’. This course deals with the introduction of Web-based Collaborative Engineering in standard education programmes of water related engineering and civil engineering based on information sharing. Organized under the umbrella of IAHR and ETNET21 this course is collaboration from several universities from all over the world. Started in 1999 the course demonstrates the potential and innovative opportunities of Web-Technology in education, research and engineering: Students from the different partner universities form small distributed teams to solve a given engineering problem in a time window of two weeks. To overcome the spatial distribution the students apply modern Web technology such as video conferencing, application sharing and document management. All results as well as the final reports are presented as Web document on a shared Web-based project platform (http://www.hydro-web.org). Besides the experiences to apply standard Web tools and working methods based on information sharing instead the conventional information exchange in the daily engineering work the students improve their soft skills operate successfully in international and interdisciplinary project environments as part of the ‘Technical Culture’ of nowadays. KW - Architektur KW - Verteiltes System KW - Informationsaustausch KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1869 ER - TY - CHAP A1 - Molkenthin, Frank T1 - Web-based Information Systems: Data Monitoring, Analysis and Reporting for Measurements and Simulations N2 - This paper describes the concept, implementation and application of the Web-based Information System ‘Turtle’ for data monitoring, analysis, reporting and management in engineering projects. The system uses a generalised object-oriented approach for information modelling of physical state variables from measurements and simulations by sets of tensor objects and is implemented platform-independently as a Web application. This leads to a more flexible handling of measurement and simulation information in distributed and interdisciplinary engineering projects based on the concept of information sharing. The potential and advantages of Web-based information systems like ‘Turtle’ are described for one selected application example: a measurement programme dealing with the physical limnology of Lake Constance. KW - Mobile Computing KW - Funknetz KW - Informationssystem KW - World Wide Web Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1184 ER - TY - JOUR A1 - Mironov, Vadim A1 - Pahl, Peter Jan T1 - A Prismatic Finite Element for Accurate Arch Dam Analysis N2 - The displacements and stresses in arch dams and their abutments are frequently determined with 20-node brick elements. The elements are distorted near the contact plane between the wall and the abutment. A cantilever beam testbed has been developed to investigate the consequences of this distortion. It is shown that the deterioration of the accuracy in the computed stresses is significant. A compatible 18-node wedge element with linear stress variation is developed as an alternative to the brick element. The shape of this element type is readily adapted to the shape of the contact plane. It is shown that the accuracy of the computed stresses in the vicinity of the contact plane is improved significantly by the use of wedge elements. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Dammbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2467 ER - TY - CHAP A1 - Miles, John A1 - Taylor, Mark A1 - Anumba, Chimay T1 - VRML Virtual Worlds - An Alternative to the Desktop Metaphor for GUI's? N2 - Metaphors are commonly used by software developers in the creation of GUI's. This paper looks at the use of multi-user VRML to create virtual metaphors, developing a conceptual design tool that can be used intuitively with little or no training. KW - Architektur KW - Verteiltes System KW - Graphische Benutzeroberfläche KW - VRML Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1855 ER - TY - CHAP A1 - Miles, John A1 - Joita, Liviu A1 - Burnap, Peter T1 - Collaborative Engineering: Virtual Teams in a Grid Environment Supporting Consortia in the Construction Industry N2 - In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI). KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1362 ER - TY - CHAP A1 - Miles, John A1 - Cen, Mei A1 - Taylor, Mark T1 - Linking Sketching and Constraint Checking for Early Conceptual Design N2 - At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients. KW - Konzipieren KW - Bauwerk KW - Management KW - Constraintnetz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1547 ER - TY - JOUR A1 - Milbradt, Peter A1 - Schierbaum, Jochen A1 - Schwöppe, Axel T1 - Finite Cell-Elements of Higher Order N2 - The method of the finite elements is an adaptable numerical procedure for interpolation as well as for the numerical approximation of solutions of partial differential equations. The basis of these procedure is the formulation of suitable finite elements and element decompositions of the solution space. Classical finite elements are based on triangles or quadrangles in the two-dimensional space and tetrahedron or hexahedron in the threedimensional space. The use of arbitrary-dimensional convex and non-convex polyhedrons as the geometrical basis of finite elements increases the flexibility of generating finite element decompositions substantially and is sometimes the only way to get a clear decomposition... KW - Finite-Elemente-Methode KW - Physikalisches Verfahren Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2524 ER -