TY - CHAP A1 - Schneider, Mike T1 - Radio Frequency Identification (RFID) Technology and its Applications in the Commercial Construction Industry N2 - This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole. KW - RFID KW - Automatische Identifikation KW - Materialflusssteuerung KW - Bauindustrie Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1061 ER - TY - CHAP A1 - Schmutzler, Bernd T1 - Ein Algorithmus zur Lösung von Tourenproblemen mit Zeitrestriktionen und inhomogenem Fahrzeugpark N2 - Es wird ein Algorithmus vorgestellt, der auf Tourenprobleme mit verschiedenen Restriktionen anwendbar ist. Zum einen können sowohl die Aufträge der Kunden als auch die Fahrzeuge mit Zeitrestriktionen in Form eines oder mehrerer Zeitfenster versehen sein. Zum anderen stehen auszuliefernde Waren nur in gewissen zeitabhängigen Stückzahlen zur Verfügung. Die vorhandenen Fahrzeuge besitzen hinsichtlich Kapazität und Geschwindigkeit unterschiedliche Eigenschaften, wobei von den Kunden gewisse Fahrzeugtypen ausgeschlossen werden können. Die Aufträge werden zunächst hinsichtlich örtlichem und zeitlichem Abstand in Cluster unterteilt. Den Clustern werden auf der Basis von Bewertungen Fahrzeuge zugeordnet, mit denen Touren innerhalb der Cluster erzeugt werden. Das Aufstellen der Touren erfolgt mittels eines Savingsverfahrens, bei dem das Saving aus einer örtlichen und einer zeitlichen Komponente besteht. Der Algorithmus läßt sich über eine Vielzahl an Parametern steuern. KW - Transportproblem KW - Zeitrestriktion Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3601 ER - TY - CHAP A1 - Schley, Frank A1 - Mejstrik, Marcus A1 - Holz, K.-Peter T1 - Network Based Co-operation Platform for Geotechnical Engineering N2 - This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment. KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Geotechnik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1431 ER - TY - CHAP A1 - Schlegel, Roger A1 - Rautenstrauch, Karl T1 - Numerische Simulation von Mauerwerk als Kontinuum N2 - Im vorliegenden Beitrag wird ein in das FE-Programmsystem ANSYS implementiertes elastoplastisches Berechnungsmodell zur nichtlinearen, räumlichen Untersuchung von Mauerwerkstrukturen vorgestellt. Die Modellierung des heterogenen Baustoffs Mauerwerk erfolgt mit Hilfe eines verschmierten Ersatzkontinuums. Das anisotrope Materialverhalten wird sowohl hinsichtlich der Spannungs-Dehnungsbeziehung als auch bei der Beschreibung der Festigkeit berücksichtigt. Durch die Verwendung einer zusammengesetzten Fließbedingung ist es möglich, das Versagen der einzelnen Mauerwerkkomponenten Stein und Mörtelfugen und des Verbundes zu berücksichtigen. Dadurch ist die Anwendbarkeit des Modells für mehrere Mauerwerksarten gegeben. Die hierfür verwendeten Materialparameter sind aus einfachen Kleinkörperversuchen bestimmbar oder innerhalb gewisser Grenzen aus empirischen Formeln berechenbar. Die notwendige Beschränkung der Anzahl der Materialparameter sichert die praktische Anwendbarkeit des entwickelten Berechnungsmodells. Die numerische Umsetzung des hier verwendeten impliziten Berechnungsverfahrens lässt sich in eine lokale und eine globale Iterationsebene gliedern. Die lokale Iteration am Integrationspunkt dient der Spannungsrückführung. Dabei sind die Besonderheiten der Verarbeitung mehrflächiger Fließfiguren zu beachten. Die globale Iteration auf Systemebene sichert die Umlagerung des Residuums. Mit der Nachrechnung von Versuchsergebnissen soll das entwickelte Modell verifiziert und seine physikalische Leistungsfähigkeit eingeschätzt werden. KW - Mauerwerk KW - Modellierung KW - Elastoplastizität KW - Finite-Elemente-Methode KW - ANSYS KW - Zusammengesetzte Fließbedingung KW - Kontinuum Y1 - 2000 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-6106 ER - TY - CHAP A1 - Schink, Claus-Jürgen A1 - Koch, Volker T1 - Interdisciplinary Cooperation Modules in Mobile Networks N2 - The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication. KW - Architektur KW - Verteiltes System KW - Mobile Computing KW - Rechnernetz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1788 ER - TY - CHAP A1 - Scherer, Raimar J. A1 - Keller, Martin T1 - Modellbasierte Prozesskoordination für das virtueller Planungsteams N2 - >Virtual Organizations<, >Virtual Enterprises< und >Smart Organizations< werden immer häufiger als zukünftige Geschäftsform für des Bauwesens und insbesondere der Bauplanung gesehen. Ziel dieser Organisationsformen ist es, eine temporäre geschäftliche Zusammenarbeit zur Erschließung neuer Geschäftsfelder aufzubauen, ausgehend von einer strategischen Geschäftsverbindung. Insbesondere für kleine Planungsbüros können sich hieraus Möglichkeiten zur Durchführung größerer Projekte eröffnen, indem notwendige Ressourcen, wie z.B. Fachingenieure, jeder Zeit flexibel integriert werden können. Neben dem Auftreten als Projektmanager besteht für die Planungsbüros auch die Möglichkeit Spezialwissen sowie nicht benötigte Ressourcen in andere Projekte zu integrieren. Ziel ist es dabei, eine kontinuierliche Auslastung der Mitarbeiter sicherzustellen. Durch die Nutzung einer geeigneten und allgemein zugänglichen IT-Infrastruktur über das Internet können neue Partner ohne großen Aufwand in ein Projekt aufgenommen werden indem diesen Zugriffe auf alle notwendigen Projektinformationen gegeben wird. Mit der Bereitstellung passender IT-Werkzeuge für das Projektmanagement, Datenmanagement und Vertragsmanagement wird eine effektive Projektbearbeitung gewährleistet. In diesem Beitrag werden die konzeptionellen Grundlagen virtueller Organisation genauer betrachtet und deren Anwendbarkeit auf virtuelle Planungsteams im Bauwesen untersucht. Anschließend wird, aufbauend auf diese Erkenntnisse, der Aufbau und die Komponenten einer Softwareumgebung zur Unterstützung des virtuellen Planungsteams erörtert. Zum Schluss erfolgt eine Darstellung des durch das BmBF geförderte Projekt iCSS. KW - Bauplanung KW - Virtuelles Unternehmen KW - Teamorganisation KW - Projektmanagement KW - Datenaustausch Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3599 ER - TY - CHAP A1 - Schelle, H. T1 - Operations Research and Projektmanagement: kritischer Rückblick und Zukunftsperspektiven N2 - Anwendungen der Methoden des Operations Research in der Praxis des Projektmanagements sind so gut wie kaum zu finden. Diese Anwendungslücke ist umso erstaunlicher, als es eine große Zahl von theoretischen Veröffentlichungen zum Themenkreis >Operations Research und Projektmanagement< gibt . Der Beitrag arbeitet die verschiedenen Ursachen für die bislang geringe praktische Relevanz der Disziplin >Operations Research< heraus und macht Vorschläge, wie in Zukunft anwendungsfreundlichere Modelle entwickelt werden können. KW - Projektmanagement KW - Operations Research Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4227 ER - TY - CHAP A1 - Scheer, Sergio A1 - Gama, Carmen Lúcia G. T1 - Learning objects for a teaching and learning network in structural engineering : Developing learning objects for a structural engineering educational network N2 - Information and Communication Technologies (ITC) in education have been extensively discussed nowadays. In this e-learning scenario, the construction and use of environments that support teaching and learning is a reality. Therefore, for time and general resource savings it is crucial the access to hypermedia contents with great interactivity and with high reusability. Substantial efforts have been centered in the search for a metadata proposal (metadata is a generic term used to describe data that can be used to identify and to describe common characteristics among different documents) that can be standardized and is system independent for the so called learning objects. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Wissensverarbeitung KW - learning objects KW - repository KW - applets KW - reusability KW - structural engineering Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-856 ER - TY - CHAP A1 - Scheer, Sergio A1 - Dos Santos, Aguinaldo A1 - Hinks, John T1 - An approach for promoting knowledge exchange on production practices through the Internet N2 - Recent research shows that current learning strategies in construction industry have not been effective in implementing lean principles in construction. With that in mind the researchers set to investigate an alternative learning strategy in order to promote learning at the international level. A web-based environment, was developed for this project with the intent of promoting learning and knowledge exchange on the theory and practice of "process transparency" across different countries. KW - Bautechnik KW - Computerunterstütztes Lernen KW - Wissensverarbeitung KW - pull learning KW - transparency KW - knowledge exchange KW - web-based learning Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-821 ER - TY - CHAP A1 - Schapke, Sven-Eric A1 - Scherer, Raimar J. T1 - A Four Layer Bayesian Network for Product Model Based Information Mining N2 - Business and engineering knowledge in AEC/FM is captured mainly implicitly in project and corporate document repositories. Even with the increasing integration of model-based systems with project information spaces, a large percentage of the information exchange will further on rely on isolated and rather poorly structured text documents. In this paper we propose an approach enabling the use of product model data as a primary source of engineering knowledge to support information externalisation from relevant construction documents, to provide for domain-specific information retrieval, and to help in re-organising and re-contextualising documents in accordance to the user’s discipline-specific tasks and information needs. Suggested is a retrieval and mining framework combining methods for analysing text documents, filtering product models and reasoning on Bayesian networks to explicitly represent the content of text repositories in personalisable semantic content networks. We describe the proposed basic network that can be realised on short-term using minimal product model information as well as various extensions towards a full-fledged added value integration of document-based and model-based information. KW - Bauwerk KW - Datenmanagement KW - Produktmodell Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1207 ER - TY - CHAP A1 - Schallehn, W. T1 - Umweltorientiertes Projektmanagement N2 - Das studentische Projekt Umweltorientiertes Projektmanagement (UWoPM) eröffnet eine neue Generation von Arbeitsweisen im Projektmanagement. Umweltbelange wirken über Rechtsvorschriften immer stärker in das Projektgeschäft hinein. Durch Einbeziehung von rechtsrelevanten Daten in die Projektdatenbasis sowie von Rechtsbestimmungen in die Wissensbasis wird eine Softwareunterstützung für (wenn auch zunächst nur elementare) Rechtsfragen geboten. Eine spezielle Präsentation von Rechtswissen und eine komfortable Unterstützung der Antragstellung sollen dies in die Selbstverständlichkeiten des Projektmanagements einbringen. Gleichzeitig bietet der UWoPM-Prototyp zeitgemäße Systemlösungen für die Kommunikation Antragsteller - Behörde sowie für den Workflow innerhalb der Genehmigungsbehörde. Dieser Vortrag gibt Einführung und Übersicht zu insgesamt 18 Diplomarbeiten, in denen die Einzelkomponenten des UWoPM entwickelt wurden. Zentrales Problem war die Überführung gesetzlicher Vorschriften in Wissensbasen. Durch Beschränkung auf >Kernbestimmungen< und Ausweis von Interpretationsbedarf wurde ein prinzipieller Lösungsweg realisiert. Die technische Realisierung konnte zwar über einen Prototyp noch nicht hinausgehen, weist aber die Realisierbarkeit des Gesamtansatzes nach. KW - Projektmanagement KW - Umweltfaktor Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4528 ER - TY - CHAP A1 - Sariyildiz, Sevil A1 - Schwenck, M. T1 - An Integrated Software Environment for the Architectural Design Process N2 - The general motivation of this research is to develop software to support the handling of the increased complexity of architectural design. In this paper we describe a system providing general support during the whole process. Instead of only developing design tools we are also addressing the problem of the operating environment of these tools. We conclude that design tools have to be integrated in an open, modular, distributed, user friendly and efficient environment. Two major fields have to be addressed - the development of design tools and the realisation of an integrated system as their operation environment. We will briefly focus on the latter by discussing known technologies in the field of information technology and other design disciplines that can be used to realise such an environment. Regarding the first subject we have to state the need of a detailed tool specification. As a solution we suggest a strategy where the tool functions are specified on the basis of a transformation, where a hierarchical process model is mapped into specifications of different design tools realising appropriate support for all sub-processes of architectural design. Using this strategy the main steps to develop such a support system are: implementation of a framework as basis for the integrated design system decision whether the tool specification are already implemented in available tools in this case these tools can be integrated using known methods for tool coupling otherwise new design tools have to be developed according to the framework KW - Architektur KW - CAD Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4447 ER - TY - CHAP A1 - Sampaio, Alcinia Zita A1 - Henriques, Pedro T1 - Interactive project planning in construction based on virtual reality technology N2 - This paper describes a didactic application that is part of a research project whose main aim is to develop a computer-aided system which will assist design and construction processes. It is based on the visual simulation of construction activities. Geometric modeling and virtual reality techniques are used in the visualization of the design process and to define user-friendly interfaces in order to access construction information, which could prove useful to Civil Engineering professionals. As a first step, was developed a prototype that serves as a didactic tool for Civil Engineering students of disciplines concerned with building construction. The construction of a double brick wall is the case studied. The wall is defined as a three dimensional model formed with the several components needed to edify it. Using the wall's virtual model it is possible to show, in an interactive way, the sequence of the construction process and observe from any point of view the configurations in detail of the building components. This is then a didactic tool application in construction processes domain of great interest to Civil Engineering students. KW - Bauwesen KW - CAD KW - Optimierung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3588 ER - TY - CHAP A1 - Sampaio, Alcinia Zita T1 - Definition of a bridge deck geometrical modelling process to automate design graphical representations N2 - The construction of a new building interferes with the existent environment. A careful aesthetic study must be made at an early stage in the design and the visualization of a three-dimensional (3D) model of the structure is the best way to analyse it. As some structures presents a complex shape is difficult to execute a 3D model as well as the specific drawings. Using traditional graphical systems, the execution of deck specific drawings is extremely time consuming and the 3D deck model gives an approximation only of the exterior shape of the deck. The modelling scheme proposed here allows the automation of the geometric design phases related to the deck bridge element using as a means of integration a geometric database representative of the real deck shape. This concept was implemented in a computer program. This application is an important support in the process design namely at the conceptual and graphical stages. The computer application provides an important tool to the bridge designer particularly at the conceptual stage, as it allows aesthetic and structural evaluation of the bridge at an early stage in the design. The geometric modelling process and graphical results of a case study are presented. KW - Brückenbau KW - CAD KW - Dreidimensionales Modell Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3575 ER - TY - CHAP A1 - Rüppel, Uwe A1 - Meißner, Udo F. A1 - Theiss, Mirko T1 - Dynamisch-adaptive Kostenkalkulation für die Bauprojektentwicklung in vernetzten Systemen N2 - Die Entwicklung von Projekten des Hoch- und Industriebaus ist durch eine Vielzahl von zu verarbeitenden Informationen und Bewertungsgrundlagen in den Planungsphasen der Bau-land- sowie der Hoch- und Industriebauentwicklung für die Kostenkalkulation geprägt. Die Identifizierung, Beschaffung, Verwaltung und Verarbeitung dieser nach Art, Form und Inhalt bei den Kommunikationspartnern verteilt vorliegenden Informationen führt zu komplexen Planungsprozessen. Zur Bewältigung dieser Komplexität ist die Bauprojektentwicklung kooperativ in vernetzten Systemen durchzuführen. Insbesondere kann die Kostenkalkulation auf Basis der sich zeitlich verändernden Fachinformation im Netz effizient, zeitnah und mit hoher Qualität durchgeführt werden. Die bisher eingesetzten Methoden und Verfahren unterstützen die Projektplaner bei der Datenerfassung und -verarbeitung der kostenrelevanten Informationen nur in lokalen Computernetzen. Die Erfassung von Kosteninformationen, wie zum Beispiel Kostenschätzungen zur Planung von Projekten oder die im Laufe der Projektentwicklung entstehenden Kosten, liegen jedoch verteilt bei den Projektpartnern vor. Es ist daher notwendig, zur Vermeidung von Erfassungs-fehlern und zur Steigerung der Kooperation der Projektpartner bei der wirtschaftlichen Kalkulation von Bauprojekten, den Projektpartnern eine rechnergestützte und projektweite Kalkulation unter Nutzung von Computernetzwerken zu ermöglichen. Die Autoren stellen ein agenten-basiertes Kooperationsmodell für die Kosten-Kalkulation in Rahmen der Bauprojektentwicklung in vernetzten Systemen vor, das durch Strukturierung der Planungsinformationen die selbständige Suche nach klar definierten Informationen auf Basis mobiler Internet-Agenten dynamisch-adaptiv unterstützt. KW - Bauplanung KW - Informationsmanagement KW - Vernetztes System Y1 - 2000 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-6086 ER - TY - CHAP A1 - Rüppel, Uwe A1 - Meißner, Udo F. A1 - Greb, Steffen T1 - Vernetzte Bauprozesssteuerung auf der Basis bauteilspezifischer Prozessmuster für geotechnische Konstruktionselemente N2 - Der Beitrag basiert auf den Ansätzen und Ergebnissen des Forschungsprojekts >Prozessorientierte Vernetzung von Ingenieurplanungen am Beispiel der Geotechnik<, des DFG-Schwerpunktprogramms 1103 >Vernetzt-kooperative Planungsprozesse im Konstruktiven Ingenieurbau<. Ziel ist die Entwicklung einer netzwerkbasierten Kooperationsplattform zur Unterstützung von Ingenieurplanungen. Methodische Grundlagen hierfür stellen die Petri-Netze mit individuellen Marken in Verbindung mit einer semantischen Informationsbewertung dar. Der Beitrag zeigt an einem Beispiel die grundlegenden Möglichkeiten der Petri-Netze auf und stellt die Steuerung der Planungsprozesse aufgrund von Metainformationen dar. Darüber hinaus wird der Ansatz verfolgt, auf der Basis bauteilorientierter Prozessmuster für geotechnische Konstruktionselemente den veränderlichen Prozessablauf zu erfassen. Abschließend wird ein Weg zur Implementierung gezeigt. KW - Geotechnik KW - CAD KW - Prozessmodell KW - Rechnernetz Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3556 ER - TY - CHAP A1 - Rüppel, Uwe A1 - Meißner, Iris A1 - Gutzke, Thomas T1 - Mobile Computing in der Grundwasserbewirtschaftung N2 - Die Bewirtschaftung von Grundwasser umfasst zum einen die Nutzungserfordernisse und Versorgungsbedürfnisse und zum andern den Schutz des Grundwassers als Bestandteil des Naturhaushaltes. Die Verwendung von Informations- und Kommunikationsmethoden zur numerischen Grundwassermodellierung und zur Verwaltung von großflächigen qualitativen und quantitativen Grundwasserinformationen eröffnen die Möglichkeit einer nachhaltigen wasserwirtschaftlichen Planung sowie einer gezielten Steuerung der Auswirkungen von Grundwasserentnahmen und -versickerungen. Im Rahmen des Pilotprojektes Grundwasser-Online im Hessischen Ried (www.grundwasser-online.de) wurden gezielt die Arbeitsabläufe bei der Erfassung der Daten zur Grundwasserbewirtschaftung sowie der anschließenden Verarbeitung analysiert, bewertet und software-technisch umgesetzt. Ein wichtiger Aspekt dabei ist die Datenerfassung an den räumlich verteilten Grundwassermessstellen. Der vorliegende Beitrag zeigt auf, wie mobile EDV Geräte mit einer geeigneten Software die Arbeitsabläufe beim Einsatz vor Ort effizienter gestalten und die Einhaltung der Messvorgaben unterstützen können. Durch die Minimierung von Fehlerquellen kann dabei eine Qualitätsverbesserung des Datenbestandes erreicht werden. Es wird ein Konzept zur mobilen Erfassung von Grundwasserdaten unter Verwendung von GPS-Positionsdaten und Plausibilitätsprüfungen vorgestellt. Die Technologien und Herausforderungen bei der prototypischen Umsetzung werden aufgezeigt. KW - Grundwasser KW - Bewirtschaftung KW - Modellierung KW - Datenerfassung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3547 ER - TY - CHAP A1 - Rüppel, Uwe A1 - Klauer, Thomas T1 - Internetbasiertes Management von Bauprojekten auf der Basis eines dynamischen Workflow-Frameworks N2 - Die Baubranche zeichnet sich durch eine sehr starke Arbeitsteilung aus, die hohe Ansprüche an die Koordination der Prozesse und auch an die Qualität der auszutauschenden Informationen stellt. Trotz der gegenwärtigen informationstechnologischen Möglichkeiten gibt es in der Bauwirtschaft noch keine umfassende Lösung, um diesen Anforderungen gerecht zu werden. Insbesondere sind Modelle zur durchgängigen Koordinierung der Prozesse und Arbeitsabläufe (Workflows) im Informations- und Kommunikationsverbund für die baupraktischen Belange noch nicht entwickelt worden. Die Abbildung der dynamischen Aspekte der Workflows zwischen Bauherren, Projektleitung, Fachplanern, Bauaufsichtsbehörde und Bauunternehmen können zu einer Erhöhung der Termin- und Kostensicherheit führen. Vorhandene Software-Produkte im Bereich des Workflow-Managements erfüllen die Anforderungen der vernetzt-kooperativen Planung bzw. Ausführung im Bauwesen nicht durchgängig und sind nicht in einen internetbasierten Projektraum integrierbar. Die Grundlage des hier vorgestellten Systems bildet ein so genanntes Workflow-Framework, dem alle Fachinformationen, wie Kosten, Termine, Gebäudestruktur und (Plan-) Dokumente untergeordnet sind. Dieses Framework stellt eine auf die Anforderungen des Bauwesens ausgerichtete Anwendung dar, mit deren Hilfe die Beteiligten und deren Aktivitäten, die Fachinformationen und die zu verwendenden Fachapplikationen koordiniert und überwacht werden können. Mit dieser Anwendung, die in den internetbasierten Projektraum Baukom-Online integriert ist, kann zum einen die Projektleitung bzw. der Projektsteuerer bei der Koordination, Steuerung und Überwachung der Bauprojektabwicklung in technischer, rechtlicher und wirtschaftlicher Hinsicht unterstützt werden. Zum anderen ermöglicht es den Beteiligten in Planung, Genehmigung und Ausführung, ihre Arbeitsabläufe im Hinblick auf eine fristgerechte und wirtschaftliche Abwicklung effizienter zu gestalten. KW - Bauablauf / Ablaufplanung KW - Management KW - Internet Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3561 ER - TY - CHAP A1 - Rutman, Y. L. T1 - Pseudorigidity method (PRM) for solving the problem of limit equilibrium of rigid-plastic constructions N2 - One of the basic types of strength calculations is the calculation of limit equilibrium of constructions. This report describes new method for solving the problem of limit equilibrium. The rigid-plastic system in this method is substituted with an «equivalent» elastic system with specially constructed rigidities. This is why it is called the method of pseudorigidities. An iteration algorithm was developed for finding pseudorigidities. This algorithm is realized in a special software procedure. Conjunction of this procedure with any elastic calculation program (base program) creates a program solving rigid-plastic problems. It is proved, that iterations will be converge to the solution for the problem of limit equilibrium. The solution of tests show, that pseudorigidity method is universal. It allows the following: - to solve problems of limit equilibrium for various models (arch, beam, frame, plate, beam-wall, shell, solid); - to take into account both linearized and square-law fluidity conditions; - to solve problems for various kinds of loads (concentrated, distributed, given by a generalized vector); - to take into account the existing various of fluidity criteria in different sections etc. The iterative PRM process quickly converges. The accuracy of PRM is very high even in case of rough finite-element structuring. The author has used this method for design protection systems from extreme loads due to equipment of nuclear power stations, pipelines, cargo in any transportation. KW - Grenzzustand KW - Gleichgewicht KW - Plastizitätstheorie Y1 - 2000 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-6094 ER - TY - CHAP A1 - Ruess, Martin T1 - Die Bestimmung von Eigenzuständen mit dem Verfahren der Inversen Matrizeniteration N2 - Die Inverse Matrizeniteration ist ein Verfahren zur Bestimmung der Eigenzustände reeller, symmetrischer Matrizen mit konvexer Profilstruktur. Das Verfahren zeichnet sich besonders durch den Erhalt der Profilstruktur und die Bestimmung der Eigenwerte in geordneter Reihenfolge aus. Die Iteration ermöglicht die gezielte Bestimmung mehrerer aufeinander folgender betragskleinster Eigenwerte, wie es im Bauwesen insbesondere für Stabilitäts- und Schwingungsanalysen erforderlich ist. Die Anwendung dieses Verfahrens hat gezeigt, daß ein Teil der gesuchten Eigenwerte mit wenigen Iterationszyklen bestimmt werden kann, während andere eine größere Anzahl von Iterationszyklen erfordern. Diese lokale Konvergenzverschlechterung kann durch eine Jacobi-Randkorrektur, wie sie im Beitrag näher erläutert wird, behoben werden. KW - Matrizenrechnung KW - Eigenwert KW - Iteration Y1 - 2000 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5994 ER -