TY - CHAP A1 - Konrad, Martin A1 - Chudoba, Rostislav A1 - Butenweg, Christoph T1 - Textile Reinforced Concrete Part II: Multi-Level Modeling Concept N2 - The development of a consistent material model for textile reinforced concrete requires the formulation and calibration of several sub-models on different resolution scales. Each of these models represents the material structure at the corresponding scale. While the models at the micro-level are able to capture the fundamental failure and damage mechanisms of the material components (e.g. filament rupture and debonding from the matrix) their computational costs limit their application to the small size representative unit cells of the material structure. On the other hand, the macro-level models provide a sufficient performance at the expense of limited range of applicability. Due to the complex structuring of the textile reinforced concrete at several levels (filament - yarn - textile - matrix) it is a non-trivial task to develop a multiscale model from scratch. It is rather more effective to develop a set of conceptually related sub-models for each structural level covering the selected phenomena of the material behavior. The homogenized effective material properties obtained at the lower level may be verified and validated using experiments and models at the higher level(s). In this paper the development of a consistent material model for textile reinforced concrete is presented. Load carrying and failure mechanisms at the micro, meso and macro scales are described and models with the focus on the specified scales are introduced. The models currently being developed in the framework of the collaborative research center are classified and evaluated with respect to the failure mechanisms being captured. The micromechanical modeling of the yarn and bonding behavior is discussed in detail and the correspondence with the experiments focused on the selected failure and interaction mechanisms is shown. The example of modeling the bond layer demonstrates the application of the presented strategy. KW - Beton KW - Bewehrung KW - Textilfaser KW - Mathematisches Modell Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3230 ER - TY - CHAP A1 - Kohler, Niklaus A1 - Bodin, Olivier T1 - Dealing with sensitivity and uncertainty analysis in integrated buildung LCA model : Dealing with Uncertainty in Life Cyle Analysis of Building Model by Using Experiment Design Methods N2 - Building design, realization, operation and refurbishment have to take into account the environmental impacts as well as the resulting costs over a long period of time. LCA methods had to be developed for buildings because of their complexity, their long life duration and through a large number of actors who are involved. This was realized by integrating life cycle analysis, life cycle costing and building product models in integrated LCA models. However the use of such models leads to difficulties. The principal ones are the uncertainty treatment in LCA models and the lack of experience of practitioners who are not LCA specialists. Answers to these problems are the management of uncertainty and the development of simplified models for building design, construction and operation. This can be achieved with the mean of experimental plans or Monte Carlo simulation. The paper will focus on how these techniques can be used, what are their possibilities and disadvantages, particularly concerning the development of simplified models. KW - Bauwerk KW - Mathematisches Modell KW - Lebensdauer KW - Unsicherheit KW - Monte-Carlo-Simulation Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3220 ER - TY - CHAP A1 - Khmelnytskaya, Kira T1 - On a quaternionic form of the Maxwell equations for the time-dependent electromagnetic field in chiral media N2 - In [1] a quaternionic reformulation of the time-harmonic Maxwell equations for chiral media was proposed and used in [2] in order to construct complete systems of quaternionic fundamental solutions convenient for numerical analysis of scattering boundary value problems. In the present contribution we give a quaternionic reformulation of time-dependent Maxwell's equations for chiral media. The Maxwell system is written as a single quaternionic equation. We obtain a fundamental solution of this equation and use it for solving Maxwell's system with sources. This is a joint work with V. V. Kravchenko. [1] Khmelnytskaya, K. V., Kravchenko, V. V. and H. Oviedo: Quaternionic integral representations for electromagnetic fields in chiral media. Telecommunications and Radio Engineering 56 (2001), # 4&5, 53-61. [2]Khmelnytskaya, K. V. , Kravchenko, V. V. and V. S. Rabinovich: Quaternionic Fundamental Solutions for Electromagnetic Scattering Problems and Application. Zeitschrift für Analysis und ihre Anwendungen 22 (2003), 147--166. KW - Chirale Verbindungen KW - Elektromagnetisches Feld KW - Zeitabhängigkeit KW - Maxwellsche Gleichungen KW - Quaternion Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3219 ER - TY - CHAP A1 - Kettner, Christiane A1 - Schmidt, Willi T1 - Ein Fuzzy-Control geführtes Lüftungssystem für Niedrigenergie- und Passivhäuser N2 - Im Rahmen eines BMWT-geförderten Projekts entstand innerhalb einer Kooperation der Ritter Energie-und Umwelttechnik mit der Universität Karlsruhe (Fachbereich Bauphysik und Technischer Ausbau) eine bedarfsgeführte Fuzzy-Regelung für eine Lüftungsanlage mit Wärmerückgewinnung. Da bei Niedrigenergie-und Passivhäusern die Wärmeverluste über die Lüftung vergleichsweise hoch sind, besteht hier noch Einsparbedarf.Eine bedarfsgeführte Regelung kann die Lüftungsrate reduzieren, wenn z.B. mehrere Bewohner abwesend sind oder Fensterlüftung betrieben wird und die Luftqualität somit gut genug ist. Ausserdem wird die Lüftung reduziert, wenn die Raumluft in der Heizperiode zu trocken wird. Die sog. Fuzzy-Logik eignet sich gut für solche Regelungsaufgaben, bei denen menschliches Empfinden und Entscheiden nachgebildet werden soll. Fuzzy bedeutet eigentlich >unscharf<, d.h. es wird mit unscharfen Begriffen gearbeitet. Eine typische Anweisung in einer Fuzzy-Regelbasis lautet z.B. >Wenn die Luft trocken ist dann wenig lüften<. Der Prozess, in dem die Zugehörigkeit einer scharfen Messgröße zu den verschiedenen Fuzzy-Sets wie >trocken<, >mittel< und >feucht< bestimmt wird, heisst >Fuzzifizierung<. Das Anwenden der Regeln und das Extrahieren des unscharfen Ergebnisses heisst >Interferenz<. Abschließend wird eine >Defuzzifizierung< vorgenommen, um wieder ein scharfes Ergebnis zu erhalten. Die Fuzzy-Lüftungsregelung hat sich in Feldtests sehr gut bewährt. Simulationsrechnungen mit dem Gebäudesimulationsprogramm >ColSim< haben ausserdem gezeigt, dass im Passivhaus bis zu 16% der für Heizen und Lüften verbrauchten Primärenergie eingespart werden kann, wenn die Fuzzy-Regelung gegen eine konventionelle Drei-Stufen-Regelung auf Stufe >Normal< antritt. Gleichzeitig wird der Wohnkomfort deutlich erhöht, da Luftqualität und Feuchte stets im richtigten Bereich bleiben. KW - Niedrigenergiehaus KW - Passivhaus KW - Lüftung KW - Fuzzifizierung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3207 ER - TY - CHAP A1 - Katzenbach, Rolf A1 - Giere, Johannes T1 - Abstraktion von Prozessmustern im geotechnischen Bauplanungsprozess N2 - Der Beitrag basiert auf den Ansätzen und Ergebnissen des Forschungsprojekts >Prozessorientierte Vernetzung von Ingenieurplanungen am Beispiel der Geotechnik<, das im Rahmen des Schwerpunktprogramms 1103 >Vernetzt-kooperative Planungsprozesse im Konstruktiven Ingenieurbau< von der DFG gefördert wird. Ziel des gemeinsam mit dem Institut für Numerische Methoden und Informatik im Bauwesen an der TU Darmstadt durchgeführten Forschungsprojekts ist die Entwicklung einer netzwerkbasierten Kooperationsplattform zur Unterstützung von geotechnischen Ingenieurplanungen. Daher konzentriert sich das Forschungsprojekt auf die Abbildung und Koordination der Planungsprozesse für Projekte des Konstruktiven Ingenieurbaus vor dem Hintergrund der stark arbeitsteiligen Projektbearbeitung in einer verteilten Rechnerumgebung. Der Beitrag stellt die Abstraktion von Prozessmustern im Bauplanungsprozess als Basis für die dynamische Prozessmodellierung in einem Kooperationsmodell dar. Ziel ist es, durch die Identifikation der mit dem Entwurf und der Dimensionierung eines Bauteils verbundenen Planungs- und Abstimmungsprozesse einen bauteilbezogenen Katalog von Prozessmustern zu abstrahieren. Die einzelnen Prozessmuster werden in jedem Bauplanungsprozess dynamisch über geeignete Kopplungsmechanismen in das aktuelle Prozessmodell integriert, so dass die für den Bauplanungsprozess typischen Veränderungen der Konstruktion und der Zusammensetzung des Planungsteams im Prozessmodell berücksichtigt werden können. Dazu werden im Beitrag die bisherigen Ergebnisse der Analyse des Planungsprozesses eines großen innerstädtischen Bauvorhabens, das als Referenzobjekt dient, sowie typischer Planungsszenarien in der Geotechnik vorgestellt. Anschließend werden Grundlagen und methodische Ansätze zur Modellierung von Prozessen mit der Methode der farbigen Petri-Netze mit individuellen Marken vorgestellt. Anhand von Beispielen für bauteilorientierte Prozessmuster wird die Funktionalität der Prozessmuster in sich und im gegenseitigen Zusammenspiel erläutert KW - Geotechnik KW - CAD KW - Prozessmodell KW - Rechnernetz Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3195 ER - TY - CHAP A1 - Kamiñski, Mieczysław A1 - Maj, Marek A1 - Schmidt, Egon T1 - Berechnungsmodell der Polystyrol-Massiv-Rippendecken N2 - Neue Konstruktionsentwicklungen erwarten von Bauingenieuren auch neue Berechnungs- und Analysenmethoden. Zu solchen Konstruktionen gehören Polystyrol-Massiv-Rippendecken. Die Decken, die eine wichtige Rolle im Neubau sowie in der Sanierung und Rekonstruktion von Altbauten spielen, haben eine umfangreiche Technologiebeschreibung, jedoch relativ kleine Berechnungsbase zur statischen Analyse der Ausnutzugs- und Statischfestigkeitsparametern. In den Vortrag wurde eine Methode zu Analyse solche Decken dargestellt. Das interessante Problem befindet sich in der sogennaten zweiten Phase, wenn der Decke keine elastische Platte ist. Eine wichtige Rolle bei Berechnung spielen die veränderte Steifigkeit und Rheology. KW - Stahlbeton KW - Polystyrol KW - Rippendecke Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3185 ER - TY - CHAP A1 - Kähler, Uwe T1 - Multiresolution analysis (MRA) on Qp-spaces N2 - In this paper we want to outline the possibility of using methods of Wavelet analysis to study Qp-spaces KW - Wavelet KW - Funktionsraum / Mathematik KW - Multiresolution analysis KW - function spaces KW - Qp-spaces Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3170 ER - TY - CHAP A1 - Kabele, Petr A1 - Pokorny, Tomas A1 - Koska, Robert T1 - Finite Element Analysis of Building Collapse during Demolition N2 - A computational strategy that employs a multi-level approach to model the physical phenomena that occur during a structural collapse is used to simulate demolition of a multi-story precast concrete building. The building is modeled by means of beam elements, whose rigidity relations have been derived from a fracture mechanics-based model of cracked RC panels and joints. The motion and deformation of the collapsing building are solved as a transient dynamic problem in the finite displacements/ rotations range. The presented approach appears as an efficient way to verify whether a proposed demolition method leads to the desired mechanism of building collapse. By simulating various blasting scenarios, the most suitable demolition procedure is identified. KW - Geschossbau KW - Stahlbeton KW - Fertigbau KW - Einsturz KW - Bruchmechanik Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3162 ER - TY - CHAP A1 - Huhn, Michael T1 - CAD by XML - Was XML im Planungssystem leisten kann N2 - In Bauplanungssystemen können XML-Technologien in vielen Bereichen eingesetzt werden mit dem Ziel, diese Systeme modular und webfähig zu gestalten. Der Einsatz lohnt als Basis-Datenstruktur für verschiedene rechnerinterne Modelle, Steuerungsstruktur für Customizing von Anwendungen, Bindeglied zwischen objektbasierten Systemen, Kommunikationsprotokoll zwischen Komponenten. Es ist möglich, komplexe Objekte aus dem Planungsalltag mittels XML arzustellen, zu speichern und zu verarbeiten. Es ist möglich, entsprechende Komponenten im Netz zu verteilen bzw. über Internet zu verbinden. Die heute dominierende Sicht auf XML als Austauschmedium wird ergänzt um die Idee eines XML-basierten Systems: Entwurfsobjekte können als >XML-Objekte< formuliert und im Sinne eines late binding verwendet werden. KW - Bauplanung KW - CAD KW - XML Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3152 ER - TY - CHAP A1 - Fojud, Artur T1 - Investment strategies over full cycle of life of a flexible pavement N2 - The pavement is one of the basic components of road infrastructure and, therefore, directly influences general levels of transport safety, as well as the quality of transportation services in human and cargo traffic. It also exerts a major influence on the final logistic costs of production and services in many aspects of everyday life. The continuity of transportation, which is closely tied to the development of a number of areas in the economy of every State, depends on the technical condition of the road pavement. Making proper investments in the complete course of life of the road pavement, a policy which makes sure that the conditions for continuous, safe, efficient, and economically optimised transportation are satisfied, is a priority for every administration managing municipal funds. If investments in the road pavement are not carried out properly, there usually are more and more road pavements the condition of which causes delays in transportation, and directly compromises traffic safety. Such a situation increases the running costs of vehicles, and decreases the transportation service levels and comfort of travelling. At the moment, the majority of pavements in Europe, (nearly 90% of all pavements) are flexible road pavements. Due to the prevalent number of flexible pavements in Europe, the author analyses investment in the course of full-time of life cycle of the pavements, with a stress on flexible pavements. The paper presents basic assumptions and definitions in the area of analysis of life cycle costs of a flexible road pavement, as well as profits associated with proper long range investment. The classification of damages to flexible road pavement has also been presented, and their influence on technical and use related assessment of road pavement conditions, basing on the traditional road pavement structures, with relation to the catalogue of typical flexible pavements used in Poland, as well as regarding French, British, and American experience in constructing long life road pavements. The second part of the paper discusses different investment strategies in the course of a full-time of life cycle of the road pavement, and proposes a procedure of evaluating investment strategies. The summary presents some assumptions for a global index of investment evaluation during the full-time of life cycle of a pavement, based on the Best Return Index (BRI). KW - Straßenbau KW - Lebenszyklus KW - Projektfinanzierung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3146 ER - TY - CHAP A1 - Kalaldeh, Murad T1 - Expert Decision System for Location Determination of Industrial Parks N2 - Business enterprises find themselves forced to choose between plots within a predetermined site instead of choosing a site within a region to be distinguished for industrial uses. Their traditional role in making their own market studies regarding inputs and outputs is no longer valid under the new circumstances. The central planner has taken over their role and given them limited paths along which they can practice their production. Site selection has turned into plot selection within a predetermined site. Modeling is a technique used in regional planning, which allows the demonstration of certain industrial park related relations in a numerical form. The science of mathematics is widely used in this technique because of its ability to set relations in a logical relationship that can clarify the dilemma under discussion and reflect results in numerical form. This paper observes the relationship between the architectural product and its effect on the urban fabric in regions and provinces by means of scientific modeling. The developed method for the clarification of the relationship between the industrial parks and urban localities in Jordan can by used to determine similar cases elsewhere. A new model for the evaluation of big-scale projects, such as industrial parks, which was developed in the author's dissertation at the Graz University of Technology, is going to be presented. This modeling technique was called the Ranking Model (RM). The constructed RM gives no solutions for existing regional planning disparities, but rather points to possible solutions according to the strategies followed in each country. KW - Industriepark KW - Standortplanung KW - Expertensystem Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3138 ER - TY - CHAP A1 - Biltchouk, Irina T1 - Entwicklung einer Datenbasis für Anwendungen im Bauwesen N2 - Die Aufgaben des Bauwesens erfordern den direkten Zugriff auf Objekte einer Datenbasis, die in dem Arbeitsspeicher einer Sitzung und in mehreren Binärdateien verteilt sind. In den Methoden einer Anwendung soll jedes Objekt unabhängig vom Ort seiner Speicherung mit seinem Namen als persistentem Identifikator direkt ansprechbar sein. Bei Bedarf sollen Objekte automatisch aus Dateien nachgeladen werden. Der Anwender soll bestimmen können, in welcher Datei ein bestimmtes Objekt gespeichert wird. Die Zugriffszeit auf ein Objekt soll im Mittel mit der Zugriffszeit auf ein Objekt in einer Java-Methode vergleichbar sein. Ein Konzept einer generalisierten Datenbasis wird vorgestellt. Seine Leistungsfähigkeit wird mit der vorhandenen Software für die Aufbewahrung und Verwaltung von Daten im Bauwesen verglichen. Es erweist sich als zweckmäßig, bereits im Entwurf einer Anwendung streng zwischen persistenten und transienten Objekten zu unterscheiden. Alle persistenten Objekte der Anwendung werden benannt. Unbenannte persistente Objekte der Java Plattform, beispielsweise Kollektionen und graphische Objekte, sind ebenfalls mit einem Griff (einem von der Datenbasis zugeteilten Namen) speicherbar. Der Zugriff auf ein Objekt ist schnell, da nur primitive Datentypen und Strings in binärer Form ohne Rückgriff auf Datenbanken gespeichert werden. KW - Bauplanung KW - Datenbank Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3123 ER - TY - CHAP A1 - Hübner, Björn A1 - Walhorn, Elmar A1 - Kölke, Andreas T1 - Simultane Lösung gekoppelter Struktur-Fluid-Systeme T1 - A Simultaneous Solution Procedure for Fluid-Structure Interaction with Application to Civil Engineering Problems N2 - Ein simultanes Lösungsverfahren für Fluid-Struktur-Wechselwirkungen aus dem Bereich des Bauingenieurwesens wird vorgestellt. Die Modellierung der Tragwerksdynamik erfolgt mit der geometrisch nichtlinearen Elastizitätstheorie in total Lagrangescher Formulierung. Die Strömung wird mit den inkompressiblen Navier-Stokes-Gleichungen beschrieben. Wenn Turbulenzeffekte massgeblich sind, kommen die Reynolds-Gleichungen in Verbindung mit dem k-omega-Turbulenzmodell von Wilcox zum Einsatz. Zur Beschreibung von komplexen freien Oberflächen wird die Level-Set-Methode eingesetzt. Die einheitliche Diskretisierung von Fluid und Struktur mit der Raum-Zeit-Finite-Element-Methode führt zu einem konsistenten Berechnungsmodell für das gekoppelte System. Da die isoparametrischen Raum-Zeit-Elemente ihre Geometrie in Zeitrichtung ändern können, erlaubt die Methode eine natürliche Beschreibung des infolge der Strukturbewegung zeitveränderlichen Strömungsgebiets. Die gewichtete Integralformulierung der Kopplungsbedingungen mit globalen Freiwerten für die Interface-Spannungen sichert eine konservative Kopplung von Fluid und Struktur. Ausgewählte Anwendungsbeispiele zeigen die Leistungsfähigkeit der entwickelten Methodik und belegen die guten Konvergenzeigenschaften des simultanen Lösungsverfahrens. KW - Bauwerk KW - Dynamik KW - Modellierung KW - Flüssigkeit-Bauwerk-Wechselwirkung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3114 ER - TY - CHAP A1 - Hube, Werner A1 - Wittwer, Christof T1 - Prädiktive Wärmeflussregelung solaroptimierter Wohngebäude - Thermische Simulation komplexer Gebäude N2 - Moderne Wohngebäude heute, besonders aber die der Zukunft, werden sich zu einem großen Teil selbst mit Wärme versorgen. Hierbei spielen Entwicklungen im Bereich der Fassadenkonstruktionen eine zentrale Rolle. Zum erhöhten solaren Wärmeeintrag kommen die Eigenschaften der Wärmespeicherung und verzögerten Wärmeabgabe hinzu. Aufgrund dieser Eigenschaften definiert sich das Gebäudeverhalten neu und komplexer. Im Rahmen der Entwicklungen von Wärmeflussregelungen in solarthermisch beheizten Wohngebäuden mit neuartigen Fassaden wird in diesem Beitrag auf die Modellentwicklung moderner Fassadenkonstruktionen hinsichtlich Transparenter Wärmedämmung und Phasenwechselmaterialien im Wandverbund, kombiniert mit der regelungstechnisch interessanten Neuentwicklung von Verschattungseinrichtungen über schaltbare Schichten am Fenster, eingegangen. Der Beitrag beschreibt den Entwurf eines Regelungskonzeptes für die thermische Raumklimaregelung. Diese Untersuchungen basieren auf komplexen Simulationsmodellen, wobei bei der Modellentwicklung der neuartigen Fassadenelemente auf reale Messwerte zurückgegriffen werden konnte. KW - Haus KW - Sonnenenergie KW - Wärmestrom KW - Modellierung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3106 ER - TY - CHAP A1 - Hommel, Angela A1 - Richter, Matthias T1 - Optimale Trassenführung: Diskretisierung - Splineapproximation - Variationsmethoden N2 - Ausgehend von mathematischen Überlegungen haben wir einfache Modellansätze zur Bearbeitung des folgenden Optimierungsproblems erarbeitet und numerische Tests durchgeführt: Eine Landkarte wird in Quadrate unterteilt, wobei jedes Quadrat mit einem Faktor zu bewerten ist. Dieser Wichtungsfaktor sei klein, wenn das Gebiet problemlos passierbar ist und entsprechend groß, wenn es sich um ein Naturschutz-gebiet, einen See oder ein schwer befahrbares Gebiet handelt. Gesucht wird nach einer günstigen Verbindung vom Punkt A zum Punkt B, wobei die durch den Wichtungsfaktor gegebenen landschaftlichen Besonderheiten zu berücksichtigen sind. Wir formulieren das Problem zunächst als Variationsproblem. Eine notwendige Bedingung, der die Lösungsfunktion genügen muß, ist die Euler-Lagrangesche Differentialgleichung. Mit Hilfe der Hamiltonschen Funktion ist es möglich, diese Differentialgleichung in kanonischer Form zu schreiben. Durch Vereinfachung des Modelles gelingt es, das System der kanonischen Gleichungen so zu konkretisieren, daß es als Ausgangspunkt für numerische Untersuchungen betrachtet werden kann. Dazu verwandeln wir die ursprüngliche Landschaft in eine >Berglandschaft<, wobei hohe Berge schwer passierbare Gebiete charakterisieren. Das einfachste Modell ist ein einzelner Berg, der mit Hilfe der Dichtefunktion einer zweidimensionalen Normalverteilung erzeugt wird. Zusätzlich haben wir Berechnungen an zwei sich überlagernden Bergen sowie einer Schlucht durchgeführt. KW - Trassierung KW - Optimierung KW - Spline-Approximation KW - Variationsrechnung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3094 ER - TY - CHAP A1 - Hölzer, Wolfgang T1 - Advanced Planning and Scheduling Systems: Optimierungsmethoden in der interaktiven Entscheidungsunterstützung auf Basis von ERP und Feinplanung N2 - Seit die Datenverarbeitung in ihrer Komplexität sich der Thematik des Computer Integrated Manufacturing widmet gehört die Produktionsplanung und Steuerung zu jenen Bereichen, in denen eine Computerunterstützung am vordringlichsten erschien. Später sind betriebswirtschaftliche Gesamtlösungen entstanden, die (bis heute recht unpräzise) als Enterprise Resource Planning (ERP)-Systeme bezeichnet werden und in ihren Logistik-Modulen auch Funktionen der Produktionsplanung abdecken. Alle bekannten MRP-, PPS- und auch ERP-Systeme beruhen auf einer Sukzessivplanung. Advanced Planning and Scheduling (APS) Systems finden seit etwa 1995 zunehmend Interesse. Neben Demand Planning, Production Planning and Scheduling, Distribution Planning, Transportation Planning und Supply Chain Planning werden Lösungen für Anzahl und Standorte von Produktionsstätten und Auslieferungslagern, Zuordnung zu Produktionsstätten, Kapazitätsbestimmung für Arbeitskräfte und Betriebsmittel je Standort, Lagerhaltung je Teil und Lager, Bestimmung benötigter Transportmittel und Häufigkeit ihres Einsatzes, Zuordnung von Lagern zu Produktionsstätten von Märkten zu Lagern u.a.m. von APS-Systemen erwartet. D.h. APS-Systeme ergänzen ERP-Lösungen, nutzen die bereits durch das ERP-System vorhandenen Daten und benötigen neuartige Algorithmen und (Meta-) Heuristiken. Im Rahmen des Vortrages werden Modelle und Echtzeitalgorithmen zur Optimierung der Logistik für Prozesse mit kurzfristigen Anforderungen, geographisch verteilter Produktion, Lagerhaltung der Ausgangs-, Zwischen- und Endprodukte und wechselnden Transport-Bedingungen aus der Sicht der praktischen Umsetzung und Anwendung in Form einer ASP-Lösung aufgezeigt und diskutiert. KW - Produktionsplanung KW - Produktionssteuerung KW - Computerunterstütztes Verfahren Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3080 ER - TY - CHAP A1 - Hommel, Angela T1 - Finite Difference Approximations of the Cauchy-Rieman Operators and the Solution of Discrete Stokes and Navier-Stokes Problems in the Plane N2 - We give a summary of our results based on discrete Cauchy-Riemann operators in the plane. These operators are defined in a way that the factorization of the real Laplacian into two adjoint Cauchy-Riemann operators is possible. This property is similar to the continuous case and can especially be used for calculating the discrete fundamental solution of our finite difference operators. Based on the discrete fundamental solution we define a discrete operator that is right inverse to the discrete Cauchy-Riemann operator. In relation with this operator and an operator on the boundary we are able to prove a discrete version of the Borel-Pompeiu formula. In the second part we present a possibility to solve discrete Stokes and Navier-Stokes problems. The concept is based on the orthogonal decomposition of the space l2 into the space of discrete holomorphic functions and its orthogonal complement. By introducing the orthoprojectors P+h and Q+h we can prove the existence and uniqueness of the solution of discrete Stokes problems. In addition we state a problem that is equivalent to the discrete Navier-Stokes problem and can be used in an iteration procedure to describe the solution of this problem. For a special case of the Navier-Stokes equations we are able to calculate discrete potential and stream functions. The adapted model includes important algebraical properties and can immediately be used for numerical calculations. A numerical example is presented at the end of the article. KW - Cauchy-Riemannsche Differentialgleichungen KW - Navier-Stokes-Gleichung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3073 ER - TY - CHAP A1 - Heinrich, Timo A1 - Huhnt, Wolfgang T1 - Determination of Effects of Modefications during Planning Processes N2 - Usually, the co-ordination of design and planning tasks of a project in the construction industries is done in a paper based way. Subsequent modifications have to be handled manually. The effects of modifications cannot be determined automatically. The approach to specify a complete process model before project start does not consider the requirements of the construction industries. The effort of specification at the beginning and during the process (modifications) does not justify the use of standard process model techniques. A new approach is presented in the according paper. A complete process model is deducted on the basis of a core. The core consists of process elements and specific relations between them. Modifications need to be specified in the core only. The effort of specification is therefore reduced. The deduction of the complete process is based on the graph theory. Algorithms of the graph theory are also used to determine the effects of modifications during project work. KW - CAD KW - Prozessmodell KW - Änderung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3065 ER - TY - CHAP A1 - Hauschild, Thomas A1 - Hübler, Reinhard T1 - Techniken der Verwaltung dynamischer digitaler Bauwerksmodelle für Revitalisierungsvorhaben N2 - Modellverwaltungssysteme sind eine geeignete technologische Basis zum Management digitaler Bauwerksmodelle bei Planungstätigkeiten für den Neubau als auch für die Revitalisierung von Bauwerken. Die Unterstützung von Revitalisierungsprozessen impliziert für den Entwurf integrierter Planungsumgebungen spezifische Anforderungen wie die Repräsentation von Informationen, die mit verschiedenen Typen von Vagheit behaftet sind, die Notwendigkeit, den Soll- sowie den Ist- Zustand des Bauwerks abzubilden und die Fähigkeit des Umgangs mit temporal inkonsistenten Modellzuständen. Die erforderliche Dynamik der Domänenmodelle und die erforderliche Nutzbarkeit in Virtual Enterprises stellen weitere Ansprüche an die Realisierungsbasis der Modellverwaltungssysteme. Zur Implementierung derartiger Systeme erweist es sich als vorteilhaft, Eigenschaften objektorientierter Programmiersprachen mit nichtstatischen Typsystemen auszunutzen, da diese durch die vorhandene Metaebene sowie Introspektions- und Reflektionsmechanismen eine effiziente Realisierungsbasis bereitstellen. Zur effektiven Unterstützung synchroner kooperativer Planungstätigkeiten innerhalb einzelner Fachdisziplinen wurde ein Benachrichtigungsmechanismus realisiert, der an das Modellverwaltungssystem angekoppelte Fachapplikationen über nebenläufig vorgenommene Modifikationen am zugehörigen Domänenmodell oder an Projektinformationen informiert. Weiterhin existiert ein Mechanismus zur vereinfachten Anbindung von existierenden Applikationen, die auf statischen Partialmodellen beruhen oder standardisierte, modellbasierte Austauschformate unterstützen. Abschließend wird eine aus einem zentralen Projektserver, Domänenservern und Domänenclients bestehende hybride Systemarchitektur vorgestellt, die geeignet ist, unter den Randbedingungen kooperativer und geographisch verteilter Arbeit bei Revitalisierungsvorhaben in Virtual Enterprises eingesetzt zu werden. KW - Bauwerk KW - Datenmodell KW - Datenverwaltung KW - Digitales Modell Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3054 ER - TY - CHAP A1 - Hartmann, Dietrich A1 - Galffy, Mozes A1 - Wellmann Jelic, Andres T1 - Lebensdauerorientierter Entwurf der Hängestangen bei Bogenbrücken - Modellierung als Mehrebenenproblem N2 - Der lebensdauerorientierte Entwurf von Stabbogenbrücken, mit Zuschnitt auf die Auslegung von Hängern, die durch Ermüdung infolge wirbelinduzierter Querschwingungen gefährdet sind, wird als stochastisches semi-infinites Optimierungsproblem formuliert. Zur Lösung dieses Problems sind mehrere Modellierungsebenen erforderlich, so dass ein Mehrebenenproblem entsteht. Es wird der derzeitige Entwicklungs- und Implementierungsstand bei der Umsetzung des Mehrebenenproblems in ein Entwurfsleitsystem (Software) aufgezeigt. Außerdem werden die Konzepte der noch ausstehenden Forschungsarbeit, die bereits erfolgreich beim lebensdauerorientierten Entwurf von Industriehallen mit Rahmensystem als Haupttragwerk eingesetzt wurden, diskutiert und ihre Einbildung in die bisher umgesetzte Forschungsarbeit erläutert. KW - Bogenbrücke KW - Zugstab KW - Optimierung KW - Lebensdauer KW - Materialermüdung Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3046 ER -