TY - JOUR A1 - Yabuki, Nobuyoshi A1 - Kotani, Jun A1 - Shitani, Tomoaki T1 - A Steel Bridge Design System Architecture using VR-CAD and Web Service-based Multi-Agents N2 - This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system. KW - Mehragentensystem KW - Lernendes System KW - Stahlbrücke KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2146 ER - TY - JOUR A1 - Mironov, Vadim A1 - Pahl, Peter Jan T1 - A Prismatic Finite Element for Accurate Arch Dam Analysis N2 - The displacements and stresses in arch dams and their abutments are frequently determined with 20-node brick elements. The elements are distorted near the contact plane between the wall and the abutment. A cantilever beam testbed has been developed to investigate the consequences of this distortion. It is shown that the deterioration of the accuracy in the computed stresses is significant. A compatible 18-node wedge element with linear stress variation is developed as an alternative to the brick element. The shape of this element type is readily adapted to the shape of the contact plane. It is shown that the accuracy of the computed stresses in the vicinity of the contact plane is improved significantly by the use of wedge elements. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Dammbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2467 ER - TY - JOUR A1 - El-Rayes, Khaled A1 - Hyari, Khalied T1 - A Multi-objective Model for Optimizing Construction Planning of Repetitive Infrastructure Projects N2 - This paper presents the development of a model for optimizing resource utilization in repetitive infrastructure projects. The model provides the capability of simultaneous minimization of both project duration and work interruptions for construction crews. The model provides in a single run, a set of nondominated solutions that represent the tradeoff between these two objectives. The model incorporates a multiobjective genetic algorithm and scheduling algorithm. The model initially generates a randomly selected set of solutions that evolves to a near optimal set of tradeoff solutions in subsequent generations. Each solution represents a unique scheduling solution that is associated with certain project duration and a number of interruption days for utilized construction crews. As such, the model provides project planners with alternative schedules along with their expected duration and resource utilization efficiency. KW - Mehragentensystem KW - Lernendes System KW - Infrastruktur Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2135 ER - TY - JOUR A1 - Ma, Zhiliang A1 - Qin, Liang T1 - A Framework of Management Information System for Construction Projects N2 - A comprehensive framework of information management system for construction projects in China has been established through extensive literature survey and field investigation. It utilizes the potential information technologies and covers the practical management patterns as well as the major aspects of construction project management. It can be used to guide and evaluate the design of the information management systems for construction projects in order to make the system to be applicable to a wide variety of construction projects and survive the changes in project management. KW - Mehragentensystem KW - Lernendes System KW - Managementinformationssystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2126 ER - TY - JOUR A1 - Beer, Daniel G. A1 - Firmenich, Berthold A1 - Richter, Torsten T1 - A Concept for CAD Systems with Persistent Versioned Data Models N2 - The synchronous distributed processing of common source code in the software development process is supported by well proven methods. The planning process has similarities with the software development process. However, there are no consistent and similarly successful methods for applications in construction projects. A new approach is proposed in this contribution. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - Versionsverwaltung KW - CAD Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2046 ER - TY - JOUR A1 - Noh, Jung-Hwi A1 - Park, Jong-Heon T1 - A Calculation of Initial Cable Force for Ko-Ha Grand Bridge N2 - The primary objective of initial shape analysis of a cable stayed bridge is to calculate initial installation cable tension forces and to evaluate fabrication camber of main span and pylon providing the final longitudinal profile of the bridge at the end of construction. In addition, the initial cable forces depending on the alternation of the bridge’s shape can be obtained from the analysis, and will be used to provide construction safety during construction. In this research, we conducted numerical experiments for initial shape of Ko-ha bridge, which will be constructed in the near future, using three different typical methods such as continuous beam method, linear truss method, and IIMF (Introducing Initial Member Force) method KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Hängebrücke KW - cable stayed bridge KW - cable force KW - initial shape KW - initial equilibrium state Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2459 ER -