TY - THES A1 - Fauth, Judith T1 - A process-oriented decision model for determining the permitability of construction projects N2 - In recent years, the discussion of digitalization has arrived in the media, at conferences, and in committees of the construction and real estate industry. While some areas are producing innovations and some contributors can be described as pioneers, other topics still show deficits with regard to digital transformation. The building permit process can also be counted in this category. Regardless of how architects and engineers in planning offices rely on innovative methods, building documents have so far remained in paper form in too many cases, or are printed out after electronic submission to the authority. Existing resources – for example in the form of a building information model, which could provide support in the building permit process – are not being taken advantage of. In order to use digital tools to support decision-making by the building permit authorities, it is necessary to understand the current situation and to question conditions before pursuing the overall automation of internal authority processes as the sole solution. With a substantive-organizational consideration of the relevant areas that influence building permit determination, an improvement of the building permit procedure within authorities is proposed. Complex areas – such as legal situations, the use of technology, as well as the subjective alternative action – are determined and structured. With the development of a model for the determination of building permitability, both an understanding of influencing factors is conveyed and an increase in transparency for all parties involved is created. In addition to an international literature review, an empirical study served as the research method. The empirical study was conducted in the form of qualitative expert interviews in order to determine the current state in the field of building permit procedures. The collected data material was processed and subsequently subjected to a software-supported content analysis. The results were processed, in combination with findings from the literature review, in various analyses to form the basis for a proposed model. The result of the study is a decision model that closes the gap between the current processes within the building authorities and an overall automation of the building permit review process. The model offers support to examiners and applicants in determining building permit eligibility, through its process-oriented structuring of decision-relevant facts. The theoretical model could be transferred into practice in the form of a web application. KW - Baugenehmigung KW - Entscheidungsmodell KW - Bauantrag KW - Prozessmanagement KW - Projektmanagement KW - Building permit KW - Building application KW - Decision-making KW - Process management KW - Project management Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220309-46020 UR - https://e-pub.uni-weimar.de/opus4/frontdoor/index/index/docId/4509 N1 - This work is a translation of the original dissertation (German language) which is accessible at: https://doi.org/10.25643/bauhaus-universitaet.4509 and deposited here as URL link. ER - TY - THES A1 - Fauth, Judith T1 - Ein handlungsorientiertes Entscheidungsmodell zur Feststellung der Genehmigungsfähigkeit von Bauvorhaben N2 - Die Auseinandersetzung mit der Digitalisierung ist in den letzten Jahren in den Medien, auf Konferenzen und in Ausschüssen der Bau- und Immobilienbranche angekommen. Während manche Bereiche Neuerungen hervorbringen und einige Akteure als Pioniere zu bezeichnen sind, weisen andere Themen noch Defizite hinsichtlich der digitalen Transformation auf. Zu dieser Kategorie kann auch das Baugenehmigungsverfahren gezählt werden. Unabhängig davon, wie Architekten und Ingenieure in den Planungsbüros auf innovative Methoden setzen, bleiben die Bauvorlagen bisher zuhauf in Papierform oder werden nach der elektronischen Einreichung in der Behörde ausgedruckt. Vorhandene Ressourcen, beispielsweise in Form eines Bauwerksinformationsmodells, die Unterstützung bei der Baugenehmigungsfeststellung bieten können, werden nicht ausgeschöpft. Um mit digitalen Werkzeugen eine Entscheidungshilfe für die Baugenehmigungsbehörden zu erarbeiten, ist es notwendig, den Ist-Zustand zu verstehen und Gegebenheiten zu hinterfragen, bevor eine Gesamtautomatisierung der innerbehördlichen Vorgänge als alleinige Lösung zu verfolgen ist. Mit einer inhaltlich-organisatorischen Betrachtung der relevanten Bereiche, die Einfluss auf die Baugenehmigungsfeststellung nehmen, wird eine Optimierung des Baugenehmigungsverfahrens in den Behörden angestrebt. Es werden die komplexen Bereiche, wie die Gesetzeslage, der Einsatz von Technologie aber auch die subjektiven Handlungsalternativen, ermittelt und strukturiert. Mit der Entwicklung eines Modells zur Feststellung der Baugenehmigungsfähigkeit wird sowohl ein Verständnis für Einflussfaktoren vermittelt als auch eine Transparenzsteigerung für alle Beteiligten geschaffen. Neben einer internationalen Literaturrecherche diente eine empirische Studie als Untersuchungsmethode. Die empirische Studie wurde in Form von qualitativen Experteninterviews durchgeführt, um den Ist-Zustand im Bereich der Baugenehmigungsverfahren festzustellen. Das erhobene Datenmaterial wurde aufbereitet und anschließend einer softwaregestützten Inhaltsanalyse unterzogen. Die Ergebnisse wurden in Kombination mit den Erkenntnissen der Literaturrecherche in verschiedenen Analysen als Modellgrundlage aufgearbeitet. Ergebnis der Untersuchung stellt ein Entscheidungsmodell dar, welches eine Lücke zwischen den gegenwärtigen Abläufen in den Baubehörden und einer Gesamtautomatisierung der Baugenehmigungsprüfung schließt. Die prozessorientierte Strukturierung entscheidungsrelevanter Sachverhalte im Modell ermöglicht eine Unterstützung bei der Baugenehmigungsfeststellung für Prüfer und Antragsteller. Das theoretische Modell konnte in Form einer Webanwendung in die Praxis übertragen werden. N2 - In recent years, the debate on digitization has been a topic of discussion in the media, at conferences and in committees of the construction and real estate industry. While some areas are producing innovations and some actors can be called pioneers, others still have deficits with regard to the digital transformation. The building permit process can also be considered among this category. Regardless of how architects and engineers use innovative methods in the planning offices, building applications are still often in paper form or are printed out after electronic submission to the authorities. Existing resources, for example in the form of a building information model, which can provide support in obtaining building permits, are not being utilized. In order to develop a decision support for the building authorities with digital tools, it is necessary to understand the actual conditions and to question the circumstances before an overall automation of the internal official processes can be pursued as the sole solution. With a content-based organizational view of the relevant components, which take influence on the building permit determination, an optimization of the building permit procedure in the authorities is aimed at. The complex components, such as the legal situation, the use of technology, but also the subjective alternatives for action, have to be determined and structured. The development of a model for determining building permit ability provides both an understanding of influencing factors and an increase in transparency for all parties involved. In addition to an international literature review, an empirical study served as a method of investigation. The empirical study was conducted in the form of qualitative expert interviews to determine the current state in the field of building permit procedures. The collected data material was prepared and subjected to a software-supported content analysis. In combination with the results of the literature review, the results were processed in various analyses as a model basis. The result of the investigation represents a decision model which closes a gap between the current processes at the building authorities and an overall automation of the building permit review. The process-oriented structuring of decision-relevant factors in the model enables support for the reviewers and the applicants during the building permit assessment. The theoretical model could be transferred into practice in the form of a web application. T3 - Schriften der Professur Baubetrieb und Bauverfahren - 39 KW - Baugenehmigung KW - Entscheidungsmodell KW - Bauantrag KW - Prozessmanagement KW - Projektmanagement KW - Building Permit KW - Decision-making KW - Building application KW - Process management KW - Project management Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20210928-45093 UR - https://e-pub.uni-weimar.de/opus4/frontdoor/index/index/docId/4602 SN - 978-3-95773-299-6 N1 - Die englische Übersetzung der Dissertation ist unter https://doi.org/10.25643/bauhaus-universitaet.4602 erfasst und hier als URL Link hinterleg PB - Bauhaus-Universitätsverlag CY - Ilmtal-Weinstraße ER - TY - JOUR A1 - Both, Petra von T1 - Integration von Informationsprozessen auf der Basis von Nemetschek Technologien KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8511 ER - TY - CHAP A1 - König, Markus T1 - Workflow-Management in der Baupraxis KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8500 ER - TY - CHAP A1 - Bargstädt, Hans-Joachim T1 - Der Bauvertrag sagt dazu leider nichts! - Was tun? KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8498 ER - TY - CHAP A1 - Wolff, Ulrich T1 - Die richtige Weiterbildung für den systematischen Kompetenzaufbau KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8480 ER - TY - CHAP A1 - Eschenbruch, Klaus T1 - Änderungsmanagementsysteme bei komplexen Projekten - Paradigmenwechsel beim Claimmanagement KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8470 ER - TY - CHAP A1 - Bauch, Ullrich T1 - Transparenz im Änderungsmanagement - ein Vorteil für alle Vertragspartner? KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8460 ER - TY - CHAP A1 - Köppel, Bernd T1 - Nachtragsjägerei und Akquisition, eine unmögliche Symbiose? KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-8459 ER - TY - CHAP ED - Professur Baubetrieb und Bauverfahren, T1 - Tag des Baubetriebs 2006 - Tagungsbeiträge "Nachtragsmanagement in Praxis und Forschung" N2 - Die Fachtagung richtete sich an Geschäftsführer, Projektleiter, Bauleiter und Projektsteuerer in Planung und Ausführung mit Beiträgen zum Nachtrags- und Änderungsmanagement am Bau, Workflow-Management in der Baupraxis, Integration von Informationsprozessen auf der Basis von Nemetschek Technologien sowie Kompetenzaufbau durch gezielte Weiterbildung. KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetriebslehre KW - Nachtragsvereinbarung KW - Prozessmanagement Y1 - 2006 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-7498 ER - TY - CHAP A1 - Wasserfuhr, R. A1 - Scherer, Raimar J. T1 - Information Management in the Concurrent Design Process N2 - Former achievements for integrated information management have concentrated on interoperability of applications like e.g. CAD, structural analysis or facility management, based on product models introducing additional application independent model layers (core models). In the last years it has become clear, that besides interoperability of autonomous applications, the concurrent processes of model instantiation and evolution have to be modeled, including the relationship to available project resources, persons, legal requirements and communication infrastructure. This paper discusses some basic concepts for an emerging methodology relating the fields of product modeling, project management and workflow systems by elaborating the concept of a process model, which gives a decomposition of the project goals into executable activities. Integrated information management systems should be related to process models to detect pending activities, deadlocks and alternatives of execution. According to the heterogeneous nature of project communication processes, a method for dynamic classification of ad-hoc activities is suggested, that complements predefined highlevel process definitions. In a brief outline of the system architecture, we show how sophisticated information management systems can be broadly made available by using conventional Internet technologies. KW - Informationsmanagement KW - Produktmodell KW - Prozessmodell KW - Prozessmanagement KW - Internet Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4456 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Klauer, Thomas T1 - Internet-based Workflow-Management for Civil Engineering Projects N2 - The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1647 ER - TY - CHAP A1 - Palm, Johan T1 - Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment N2 - The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1625 ER -