TY - CHAP A1 - Zaneldin, Essam T1 - Investigate the Impact of Different Resource Allocation Strategies on the Design of Building Projects Using Simulation N2 - The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Simulation KW - Bauvorhaben Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1658 ER - TY - CHAP A1 - Wolff, Ulrich T1 - Konzept zur rechnergestützten integrierten Projektsteuerung im Bauwesen N2 - Projektsteuerung gewinnt als Aufgabenfeld bei der Realisierung von Investitionsprojekten ständig an Bedeutung. Zur Bewältigung der umfangreichen und komplizierten Aufgaben des Projektsteuerers wird zunehmend Software angeboten und genutzt. Dabei ist feststellbar, daß von einer integrierten Projektsteuerung unter Berücksichtigung der Kriterien Leistung, Termin und Kosten nicht gesprochen werden kann, weil wesentliche theoretische und praktische Voraussetzungen fehlen. Im Beitrag werden Defizite der praktizierten Vorgehensweise und Lösungsansätze für eine integrierte rechnergestützte Projektsteuerung vorgestellt. Durch geeignete Formen der Projektstrukturierung und eine Kopplung auf dem Mark befindlicher Standardsoftware können geeignete Lösungen gefunden werden. Problempunkte dabei stellen die Schnittstellen zwischen den Anwenderprogrammen die Datenbeschaffung und -verwaltung sowie geeignete Verfahren zur Kostenermittlung und -verfolgung dar. Im Beitrag werden eine bereits praktizierte und eine in Entwicklung befindliche Lösung vorgestellt. KW - Bauwesen KW - Bauablauf KW - Projektsteuerung KW - Computerunterstütztes Verfahren Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4531 ER - TY - CHAP A1 - Smarsly, Kay A1 - Tauscher, Eike ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - IFC-BASED MONITORING INFORMATION MODELING FOR DATA MANAGEMENT IN STRUCTURAL HEALTH MONITORING T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - This conceptual paper discusses opportunities and challenges towards the digital representation of structural health monitoring systems using the Industry Foundation Classes (IFC) standard. State-of-the-art sensor nodes, collecting structural and environmental data from civil infrastructure systems, are capable of processing and analyzing the data sets directly on-board the nodes. Structural health monitoring (SHM) based on sensor nodes that possess so called “on-chip intelligence” is, in this study, referred to as “intelligent SHM”, and the infrastructure system being equipped with an intelligent SHM system is referred to as “intelligent infrastructure”. Although intelligent SHM will continue to grow, it is not possible, on a well-defined formalism, to digitally represent information about sensors, about the overall SHM system, and about the monitoring strategies being implemented (“monitoring-related information”). Based on a review of available SHM regulations and guidelines as well as existing sensor models and sensor modeling languages, this conceptual paper investigates how to digitally represent monitoring-related information in a semantic model. With the Industry Foundation Classes, there exists an open standard for the digital representation of building information; however, it is not possible to represent monitoring-related information using the IFC object model. This paper proposes a conceptual approach for extending the current IFC object model in order to include monitoring-related information. Taking civil infrastructure systems as an illustrative example, it becomes possible to adequately represent, process, and exchange monitoring-related information throughout the whole life cycle of civil infrastructure systems, which is referred to as monitoring information modeling (MIM). However, since this paper is conceptual, additional research efforts are required to further investigate, implement, and validate the proposed concepts and methods. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28237 SN - 1611-4086 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Klauer, Thomas T1 - Internet-based Workflow-Management for Civil Engineering Projects N2 - The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1647 ER - TY - CHAP A1 - Rueppel, Uwe A1 - Gutzke, Thomas T1 - Groundwater-Monitoring based on dynamic co-operative eGovernment-Processes N2 - As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Grundwasser KW - Monitorüberwachung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1611 ER - TY - CHAP A1 - Perevalova, Julia A1 - Pahl, Peter Jan T1 - Structural and Functional Dependence of Objects in Data Bases N2 - Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Objektorientierung KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1683 ER - TY - CHAP A1 - Palm, Johan T1 - Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment N2 - The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmanagement KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1625 ER - TY - JOUR A1 - Misztal, S. A1 - Misztal, G. T1 - Anwendung von Delta-Dirac-Funktion und Heviside-Funktion zur Berechnung der inneren Kräfte und Verschiebungen in gebogenen Balken N2 - Die d - Dirac - Funktion d(x-xi) und Heviside - Funktion wurden vor allem zur Beschreibung diskontinuierlicher Belastungsfunktionen von gebogenen Balken angewendet. Im Referat werden die mathematischen Operationen auf den erwähnten Funktionen dargestellt. Darüber hinaus wird die Möglichkeit eindeutiger Aufschreibung von belibigen Belestungsfunktionen vorgeschlagen, die fast alle Fälle der in der Ingenieurpraxis auftretenden Belastungen umfassen. Die vorgeschlagenen Lösungen geben die Möglichkeit leichter Aufschreibung im Form eines Algorithmus, das die Ausnutzung von Komputertechnik in statischen Berechnungen ermöglicht. Am Ende des Referates werden die Zahlebeispiele dargestellt, die die Möglichkeiten praktischer Anwendungen der besprochenen Funktionen darstellen. KW - Balken KW - Belastung KW - Mathematisches Modell KW - Computerunterstütztes Verfahren Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5308 ER - TY - JOUR A1 - Menzel, Karsten A1 - Mahdavi, A. A1 - Hartkopf, V. A1 - Lee, S. T1 - Information technology for construction management and building performance evaluation support - a North-American perspective N2 - We provide a critical overview of the current status of computational support for construction the management and building performance evaluation in North-America. This overview is based on the research conducted in relation to the design and construction of the Intelligent Workplace (IW), Carnegie Mellon University, Pittsburgh, Pennsylvania, USA. With regard to the commercial software products in the field of construction management the following limitations can be identified: Although project planning, cost estimating and construction simulation are supported, tasks like bidding as well as site and material management have not received the same level of attention. Few project management software packages are integrated in a total design support software system. Little analysis or evaluation options are provided to support managerial decision making. Various research groups address the construction planning and scheduling, construction contracting, site layout generation as well as the integration of these three topics. Currently problems such as efficient material management and calculation of environmental and energy responsive site management are insufficiently addressed within the ongoing research projects. In the domain of building performance simulation and decision support one can notice that, the development and application of computational tools is industry driven. As a result the concerns addressed by the tools are mainly issues pertaining to the selection and sizing of systems and components rather than an integrated performance evaluation. Consequently, these programs are rarely used by building designers, especially in the early design stages, where the predictive capabilities of simulation tools could be of significant value. Although many research institutions address the necessity for the integration of performance simulation within the overall design support environments most of the practically available performance simulation tools still remain mono-dimensional and isolated. KW - Bauausführung KW - Computerunterstütztes Verfahren KW - Bauzustand Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4917 ER - TY - CHAP A1 - König, Markus A1 - Klinger, Axel A1 - Berkhahn, Volker T1 - Structural Correctness of Planning Processes in Building Engineering N2 - The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Planungsprozess KW - Konsistenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1690 ER - TY - CHAP A1 - Kopyto, Martin A1 - Petersen, Michael A1 - Diaz, Joaquin T1 - Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects N2 - The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1599 ER - TY - CHAP A1 - Keller, Martin A1 - Antoniadis, George A1 - Menzel, Karsten T1 - Resource Management for the Construction Industry N2 - The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Betriebsmittel Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1679 ER - TY - CHAP A1 - Ignatova, Elena A1 - Kirschke, Heiko A1 - Tauscher, Eike A1 - Smarsly, Kay ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - PARAMETRIC GEOMETRIC MODELING IN CONSTRUCTION PLANNING USING INDUSTRY FOUNDATION CLASSES T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - One of the most promising and recent advances in computer-based planning is the transition from classical geometric modeling to building information modeling (BIM). Building information models support the representation, storage, and exchange of various information relevant to construction planning. This information can be used for describing, e.g., geometric/physical properties or costs of a building, for creating construction schedules, or for representing other characteristics of construction projects. Based on this information, plans and specifications as well as reports and presentations of a planned building can be created automatically. A fundamental principle of BIM is object parameterization, which allows specifying geometrical, numerical, algebraic and associative dependencies between objects contained in a building information model. In this paper, existing challenges of parametric modeling using the Industry Foundation Classes (IFC) as a federated model for integrated planning are shown, and open research questions are discussed. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-28024 SN - 1611-4086 ER - TY - CHAP A1 - Hölzer, Wolfgang T1 - Advanced Planning and Scheduling Systems: Optimierungsmethoden in der interaktiven Entscheidungsunterstützung auf Basis von ERP und Feinplanung N2 - Seit die Datenverarbeitung in ihrer Komplexität sich der Thematik des Computer Integrated Manufacturing widmet gehört die Produktionsplanung und Steuerung zu jenen Bereichen, in denen eine Computerunterstützung am vordringlichsten erschien. Später sind betriebswirtschaftliche Gesamtlösungen entstanden, die (bis heute recht unpräzise) als Enterprise Resource Planning (ERP)-Systeme bezeichnet werden und in ihren Logistik-Modulen auch Funktionen der Produktionsplanung abdecken. Alle bekannten MRP-, PPS- und auch ERP-Systeme beruhen auf einer Sukzessivplanung. Advanced Planning and Scheduling (APS) Systems finden seit etwa 1995 zunehmend Interesse. Neben Demand Planning, Production Planning and Scheduling, Distribution Planning, Transportation Planning und Supply Chain Planning werden Lösungen für Anzahl und Standorte von Produktionsstätten und Auslieferungslagern, Zuordnung zu Produktionsstätten, Kapazitätsbestimmung für Arbeitskräfte und Betriebsmittel je Standort, Lagerhaltung je Teil und Lager, Bestimmung benötigter Transportmittel und Häufigkeit ihres Einsatzes, Zuordnung von Lagern zu Produktionsstätten von Märkten zu Lagern u.a.m. von APS-Systemen erwartet. D.h. APS-Systeme ergänzen ERP-Lösungen, nutzen die bereits durch das ERP-System vorhandenen Daten und benötigen neuartige Algorithmen und (Meta-) Heuristiken. Im Rahmen des Vortrages werden Modelle und Echtzeitalgorithmen zur Optimierung der Logistik für Prozesse mit kurzfristigen Anforderungen, geographisch verteilter Produktion, Lagerhaltung der Ausgangs-, Zwischen- und Endprodukte und wechselnden Transport-Bedingungen aus der Sicht der praktischen Umsetzung und Anwendung in Form einer ASP-Lösung aufgezeigt und diskutiert. KW - Produktionsplanung KW - Produktionssteuerung KW - Computerunterstütztes Verfahren Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3080 ER - TY - CHAP A1 - Huhnt, Wolfgang T1 - Progress Measurement in Planning Processes on the Base of Process Models N2 - This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmodell KW - Bauablauf Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1664 ER - TY - CHAP A1 - Hartmann, Veronika A1 - Smarsly, Kay A1 - Lahmer, Tom ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - ROBUST SCHEDULING IN CONSTRUCTION ENGINEERING T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the optimization of the robustness of construction schedules has received little attention. In this paper, the effects of uncertainties inherent to the input data of construction schedules are discussed. Possibilities are investigated to improve the reliability of construction schedules by considering alternative processes for certain tasks and by identifying the combination of processes generating the most robust schedule with respect to the makespan of a construction project. KW - Angewandte Informatik KW - Angewandte Mathematik KW - Building Information Modeling KW - Computerunterstütztes Verfahren KW - Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20170314-27994 SN - 1611-4086 ER - TY - CHAP A1 - Freundt, Martin A1 - Beucke, Karl T1 - A flexible model for scheduling building processes based on graph theory and fuzzy numbers N2 - The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Scheduling KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1587 ER - TY - CHAP A1 - El-Rayes, Khaled A1 - Kandil, Amr T1 - Distributed Computing for the Optimization of Large-Scale Construction Projects N2 - Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Verteiltes System KW - Planung KW - Großbaustelle KW - Optimal Planning Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1601 ER - TY - JOUR A1 - Donath, Dirk A1 - Petzold, Frank T1 - Zukünftige Techniken für eine computergestützte Planungspraxis - applikative Tools für die architektonische Bestandserfassung N2 - Der Beitrag beschreibt die Entwicklung eines Softwaresystems zur strukturierten Erfassung und Verwaltung bestehender Gebäude in der Architektur. Die Erfassung erfolgt durch die Aufnahme von geometrischen Daten und Sachdaten in unterschiedlichen Abstraktionsstufen unter Einbeziehung einer vorangehenden Dekomposition. Basis für die Entwicklung eines solchen Systems ist die Analyse und Systematik der Erfassungstechniken, -abläufe und der Gegenstand der architektonischen Bestandsaufnahme. Parallel hierzu erfolgt die Bewertung und Nutzung aktueller Techniken und Werkzeuge der applikativen Informatik. Schwerpunkte der Forschungsarbeit sind die Ableitung einer allgemeinen Gebäude- und Bauteilstruktur, die Einbeziehung aktueller informationstechnischer Verfahren und Werkzeuge und die Entwicklung eines entsprechenden Experimentalsystems. Auf eine Auswahl softwaretechnischer Entwicklungen wird näher eingegangen (objektspezifische Eigenschaften, flexible Geometrieerfassung und Benutzeroberflächen). KW - Bauaufnahme KW - Bauplanung KW - Computerunterstütztes Verfahren Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4962 ER - TY - CHAP A1 - Biltchouk, Irina A1 - Pahl, Peter Jan T1 - Interaction of Data Bases and Graphical Interfaces in Civil Engineering N2 - Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Graphische Benutzeroberfläche KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1636 ER - TY - CHAP A1 - Bilek, Jochen A1 - Hartmann, Dietrich T1 - Agentenbasiertes Kooperationsmodell zur Unterstützung vernetzter Planungsprozesse in der Tragwerksplanung N2 - Die heutige Situation in der Tragwerksplanung ist durch das kooperative Zusammenwirken einer größeren Anzahl von Fachleuten verschiedener Disziplinen (Architektur, Tragwerksplanung, etc.) in zeitlich befristeten Projektgemeinschaften gekennzeichnet. Bei der Abstimmung der hierdurch bedingten komplexen, dynamischen und vernetzten Planungsprozesse kommt es dabei häufig zu Planungsmängeln und Qualitätseinbußen. Dieser Artikel zeigt auf, wie mit Hilfe der Agententechnologie Lösungsansätze zur Verbesserung der Planungssituation erreicht werden können. Hierzu wird ein Agentenmodell für die vernetzt-kooperative Tragwerksplanung vorgestellt und anhand der Planung einer Fußgängerbogenbrücke anschaulich demonstriert. Das Agentenmodell erfasst (1) die beteiligten Fachplaner und Organisationen, (2) die tragwerksspezifischen Planungsprozesse, (3) die zugehörigen (Teil-)Produktmodelle und (4) die genutzte (Ingenieur-)Software. Hieraus leiten sich die drei Teilmodelle (1) agentenbasiertes Kooperationsmodell, (2) agentenbasierte Produktmodellintegration und (3) Modell zur agentenbasierten Software-Integration ab. Der Fokus des Artikels liegt auf der Darstellung des agentenbasierten Kooperationsmodells. KW - Tragwerk KW - Planung KW - Computerunterstütztes Verfahren Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2791 ER - TY - CHAP A1 - Berbig, Torsten A1 - Menzel, Karsten A1 - Eisenblätter, Karin T1 - "Mobile Computing" - Anforderungen & Einführungsstratgie aus Sicht der Baupraxis N2 - Die Sicherung der Wettbewerbsfähigkeit im Bereich des Bauwesens, insbesondere kleinerer und mittelständischer Betriebe erfordert ein aktives Handeln als Antwort auf die sich ändernde Wettbewerbssituation. Einen wesentlichen Wettbewerbsvorteil können kleine unternehmerische Einheiten durch höhere Flexibilität, schnelle Reaktion auf Kundenwünsche oder aktuelle Situationen auf der Baustelle und Marktnähe erreichen. Dazu ist es nötig, die Informations- und Kommunikationsströme durch Einsatz standardisierter und kostengünstiger Hard- und Software wie z.B. Handhelds zu unterstützen und insbesondere die existierenden Hindernisse im Informationsfluss zwischen Baustelle und Büro zu beseitigen. Am Beispiel der Projekte >IuK - SystemBau< und >eSharing< wird eine Einführungsstrategie für >Mobile Computing< in kleinen unternehmerischen Einheiten des Bauwesens (KMU) basierend auf einer umfangreichen Anforderungsanalyse vorgestellt. Folgende Aspekte sollen beschrieben werden: durchgängiger Einsatz der Technik unter Beachtung der verschiedenen Qualifikationsniveaus, Einführungsunterstützung durch Schulungen, Prozessanalyse und mögliche Integration in bestehende Software-Umgebungen sowie Feldtests. KW - Bauablauf / Ablaufplanung KW - Computerunterstütztes Verfahren KW - Transportables Gerät Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2948 ER - TY - CHAP A1 - Ameziane, Farid A1 - Lasserre, Stephane T1 - SYSBAT - An Application to the Building ProductionBased on Computer Supported Cooperative Work N2 - Our proposed solution is to enable partners of a construction project to share all the technical data produced and handled during the building production process by building a system through the use of internet technology. The system links distributed databases and allows building partners to access remotely and manipulate specific information. It provides an updated building representation that is being enriched and refined all along the building production process. A recent collaboration with Nemetschek France (subsidiary company of Nemetschek AG, AEC CAD software leader) focus on a building product repository available in a web context. The aim is to help building project actors to choose a technical solution that fits its professional needs, and maintain our information system with up to date information. It starts with the possibility to build on line building product catalogs, in order to link Allplan CAD entities with building technical features. This paper presents the conceptual approaches on which our information system is built. Starting from a general organization diagram organization, we focus on the product and the description branches of construction works (including last IFC model specifications). Our aim is to add decisional support to the construction works selection process. To do so, we consider the actor's role upon the system and the pieces of information each one needs to achieve a given task. KW - Bauplanung KW - Bauausführung KW - Computerunterstütztes Verfahren Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2748 ER - TY - CHAP ED - Gürlebeck, Klaus ED - Lahmer, Tom T1 - International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar T1 - Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen : 20. bis 22.7. 2015, Bauhaus-Universität Weimar T2 - Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar N2 - The 20th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering will be held at the Bauhaus University Weimar from 20th till 22nd July 2015. Architects, computer scientists, mathematicians, and engineers from all over the world will meet in Weimar for an interdisciplinary exchange of experiences, to report on their results in research, development and practice and to discuss. The conference covers a broad range of research areas: numerical analysis, function theoretic methods, partial differential equations, continuum mechanics, engineering applications, coupled problems, computer sciences, and related topics. Several plenary lectures in aforementioned areas will take place during the conference. We invite architects, engineers, designers, computer scientists, mathematicians, planners, project managers, and software developers from business, science and research to participate in the conference! KW - Angewandte Informatik KW - Angewandte Mathematik KW - Computerunterstütztes Verfahren KW - Building Information Modeling KW - Optimization in engineering applications KW - Data, information and knowledge modeling in civil engineering KW - Function theoretic methods and PDE in engineering sciences KW - Mathematical methods for (robotics and) computer vision KW - Numerical modeling in engineering Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20150828-24515 SN - 1611-4086 ER -