TY - JOUR A1 - Abdalla, Jamal T1 - Elements of an Agent-based Mediative Communication Protocol for Design Objects N2 - Integrated structural engineering system usually consists of large number of design objects that may be distributed across different platforms. These design objects need to communicate data and information among each other. For efficient communication among design objects a common communication protocol need to be defined. This paper presents the elements of a communication protocol that uses a mediator agent to facilitate communication among design objects. This protocol is termed the Mediative Communication Protocol (MCP). The protocol uses certain design communication performatives and the semantics of an Agent Communication language (ACL) mainly the Knowledge and Query Manipulation Language (KQML) to implement its steps. Details of a Mediator Agent, that will facilitate the communication among design objects, is presented. The Unified Modeling Language (UML) is used to present the Meditative protocol and show how the mediator agent can be use to execute the steps of the meditative communication protocol. An example from structural engineering application is presented to demonstrate and validate the protocol. It is concluded that the meditative protocol is a viable protocol to facilitate object-to-object communication and also has potential to facilitate communication among the different project participants at the higher level of integrated structural engineering systems. KW - Mehragentensystem KW - Lernendes System KW - Kommunikationsprotokoll Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2207 ER - TY - JOUR A1 - Albert, Andrej A1 - Freischlad, Mark A1 - Pullmann, Torben T1 - Acquisition of Conceptual Design Knowledge in Structural Engineering N2 - Expert systems integrating fuzzy reasoning techniques represent a powerful tool to support practicing engineers during the early stages of structural design. In this context fuzzy models have proved themselves to be very suitable for the representation of complex design knowledge. However their definition is a laborious task. This paper introduces an approach for the design and the optimization of fuzzy systems based upon Genetic Programming. To keep the emerging fuzzy systems transparent a new framework for the definition of linguistic variables is also introduced. KW - Mehragentensystem KW - Lernendes System KW - Wissensverarbeitung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2154 ER - TY - JOUR A1 - Aziz, Zeeshan A1 - Anumba, Chimay A1 - Miles, John T1 - Towards a Semantic Grid Computing Platform for Disaster Management in Built Environment N2 - Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment. KW - Mehragentensystem KW - Lernendes System KW - Katastrophenmanagement KW - Software Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2084 ER - TY - JOUR A1 - Bargstädt, Hans-Joachim A1 - Blickling, Arno T1 - Effective cost estimate and construction processes with 3D interactive technologies: Towards a virtual world of construction sites N2 - The development of 3D technologies during the last decades in many different areas, leads us towards the complete 3D representation of planet earth on a high level of detail. On the lowest level we have geographical information systems (GIS) representing the outer layer of our planet as a 3D model. In the meantime these systems do not only give a geographical model but also present additional information like ownership, infrastructure and others that might be of interest for the construction business. In future these systems will serve as basis for virtual environments for planning and simulation of construction sites. In addition to this work is done on the integration of GIS systems with 3D city models in the area of urban planning and thus integration of different levels of detail. This article presents research work on the use of 3D models in construction on the next level of detail below the level of urban planning. The 3D city model is taken as basis for the 3D model of the construction site. In this virtual nD-world a contractor can organize and plan his resources, simulate different variants of construction processes and thus find out the most effective solution for the consideration of costs and time. On the basis of former researches the authors present a new approach for cost estimation and simulation using development technologies from game software. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Baubetrieb KW - Baustelle KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2320 ER - TY - JOUR A1 - Bargstädt, Hans-Joachim A1 - Blickling, Arno A1 - Kath, Thilo T1 - Optimierung der Planung von Baustelleneinrichtungen mit 3-D-Technologien T1 - Optimization of site layout planning with 3D technologies JF - Hoch- und Tiefbau 1/2-2004, S. 24-27 N2 - Der Einsatz von CAD-Applikationen hat die Planungsarbeit im Bauwesen entscheidend verändert. In der Entwurfsplanung sind die Änderungen bereits deutlich erkennbar. Seit der Anwendung von dreidimensionalen Planungswerkzeugen kann der Bauherr das Bauwerk in seiner virtuellen Gesamtheit am Computer betrachten und bewerten. Dies bietet viele Vorteile. So ist der Planer gezwungen alle wesentlichen Details a priori exakt zu planen, wodurch viele Fehler vermieden werden können. Dies bietet insbesondere für Planungen in Baubetrieben, z.B. im Rahmen der Arbeitsvorbereitung, neue Einsatzmöglichkeiten. N2 - The article describes the use of 3D CAD for the planning of site layouts. The impetus is on crane simulation and movement in order to avoid crane collision during construction process. KW - Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren KW - Baubetrieb KW - Baubetriebslehre KW - Baustelleneinrichtung KW - CAD 3D KW - Krankollision KW - 4D Modeling KW - Virtuelle Baustelle KW - virtual construction site KW - virtual environment KW - crane collision Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5599 ER - TY - JOUR A1 - Beer, Daniel G. A1 - Firmenich, Berthold A1 - Richter, Torsten T1 - A Concept for CAD Systems with Persistent Versioned Data Models N2 - The synchronous distributed processing of common source code in the software development process is supported by well proven methods. The planning process has similarities with the software development process. However, there are no consistent and similarly successful methods for applications in construction projects. A new approach is proposed in this contribution. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - Versionsverwaltung KW - CAD Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2046 ER - TY - JOUR A1 - Cerovsek, Tomo A1 - Turk, Ziga T1 - Working Together: ICT Infrastructures to Support Collaboration N2 - The paper summarizes a part of research carried out in ICCI project and provides a current review of ICT infrastructures supporting collaboration. It covers taxonomies, protocols, standards, components, typical subsystems as well as future trends and recommendation for two most important technologies with applications in AEC: (1) EIP (Enterprise information portal) – a single gateway to a company's information, knowledge base, and applications for all actors; (2) RTC (Real-Time Communication and Collaboration technologies) that provide means for asynchronous communication between geographically dislocated people using ICT. Proposed future developments are: orientation towards web services - with building information models, business intelligence, personalization, AEC information retrieval, p2p workspaces and grids. KW - Informationstechnik KW - Forschung KW - Europa KW - Teamwork Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2055 ER - TY - JOUR A1 - Chang, Chihyuan A1 - Chang, Yuanchu A1 - Huang, Shyhmeng T1 - Application of a Agent Mechanism to the Small-scale Maintenance of School Buildings N2 - This paper presents an agent-based software, Virtual Administrator System (VAS) for the smallscale maintenance of school buildings. VAS is capable of handling a heavy load of routine, lowtech maintenance jobs. It assigns a different priority to each job application according to its significance and urgency, and automatically adjusts schedules for maintenance engineers when on-site supervision is needed. The system can help ease off the burden of routine small-scale maintenance work, making it more cost-effective and efficient in the overall management of school building maintenance. VAS posts jobs on the Web in a multi-media format and classified all applications into four categories: the on-call maintenance contract, the term maintenance contract, the guaranty maintenance contract, and the regular maintenance contract. It then estimates their urgency level and passes the information to maintenance engineers who will decide whether on-site inspection is needed. Based on the engineers’ feedback, VAS automatically implements the scheduling for inspection as well as sends out real-time or batch notifications to contractors. All these activities are recorded in a database to allow continuous research and data mining and the analysis and diagnosis of specific jobs for followup maintenance plans. KW - Mehragentensystem KW - Lernendes System KW - Schulgebäude KW - Facility-Management Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2165 ER - TY - JOUR A1 - El-Rayes, Khaled A1 - Hyari, Khalied T1 - A Multi-objective Model for Optimizing Construction Planning of Repetitive Infrastructure Projects N2 - This paper presents the development of a model for optimizing resource utilization in repetitive infrastructure projects. The model provides the capability of simultaneous minimization of both project duration and work interruptions for construction crews. The model provides in a single run, a set of nondominated solutions that represent the tradeoff between these two objectives. The model incorporates a multiobjective genetic algorithm and scheduling algorithm. The model initially generates a randomly selected set of solutions that evolves to a near optimal set of tradeoff solutions in subsequent generations. Each solution represents a unique scheduling solution that is associated with certain project duration and a number of interruption days for utilized construction crews. As such, the model provides project planners with alternative schedules along with their expected duration and resource utilization efficiency. KW - Mehragentensystem KW - Lernendes System KW - Infrastruktur Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2135 ER - TY - JOUR A1 - Erlemann, Kai T1 - BABSIM - An object-oriented software framework for microscopic simulation of freeway traffic N2 - A wide variety of behavioural models exist in microscopic traffic simulation. Commercial programms often use closed-source policies and are confined to their respective simulation platforms. Open-source approaches mainly focus on distinctive, highly specialized traffic situations. In the scope of this paper, an open-source framework for developing modular, objectoriented simulation systems is presented, capable of simultaneously accommodating different driving models and enabling the user to modify and extend the catalogue of driving behaviours. The existing driving behaviours and the computational implementation of the simulation are being described. KW - Framework KW - API KW - Verkehrsplanung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2601 ER - TY - JOUR A1 - Fink, Thomas T1 - Structural analysis, design and detailing using standard CAD software and standard building information model N2 - This paper describes the concept of a german commercial software package developed for the needs of structural engineers. Using a standard CAD software as user interface for all geometrical data and to save all important input data, there is a natural link to upcoming building information models. KW - Bauindustrie KW - CAD KW - Bauwerk KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2702 ER - TY - JOUR A1 - Firmenich, Berthold T1 - Product Models in Network Based Co-operation in Structural Engineering N2 - The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2119 ER - TY - JOUR A1 - Galffy, Mozes A1 - Wellmann Jelic, Andres A1 - Hartmann, Dietrich T1 - Lifetime-oriented modelling of vortex-induced across-wind vibrations on bridge tie rods N2 - The influence of vortex-induces vibrations on vertical tie rods has been proved as a determinant load factor in the lifetime-oriented dimensioning of arched steel bridges. Particularly, the welded connection plates between the suspenders and the arches often exhibit cracks induced primarily rods. In this context, the synchronization of the vortex-shedding to the rod motion in a critical wind velocity range, the so-called lock-in effect, is of essential interest. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Brückenbau KW - Schwingung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2536 ER - TY - JOUR A1 - Gao, Zuoren A1 - Wu, Weiyu A1 - Ren, Aizhu T1 - Physically Based Modeling and Multi-Physical Simulation System for Wood Structure Fire Performance N2 - This research is devoted to promoting the performance-based engineering in wood structure fire. It looks into the characteristic of the material, structural composing and collapse detecting to find out the main factors in the wood structure collapse in fire. The aim of the research is to provide an automatic simulation platform for the complicated circulation. A physically based model for slim member for beams and columns and a frame of multi-physical simulation are provided to implement the system. The physically based model contains material model, structural mechanics model, material mechanics model, as well as geometry model for the compositive simulation. The multi-physical simulation is built on the model and has the capacity to carry out a simulation combining structural, fire (thermal, CFD) and material degradation simulation. The structural and fire simulation rely on two sophisticated software respectively, ANSYS (an FEA software) and FDS (with a core of CFD). Researchers of the paper develop system by themselves to combine the two existing ones. The system has the capability to calculate the wood char to find out the loss of cross-section and to detect the collapse caused in different ways. The paper gives a sample of Chinese traditional house to show how this simulation system works. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Holzbau KW - Brandschutz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2381 ER - TY - JOUR A1 - Geibig, Oliver A1 - Schnellenbach-Held, Martina T1 - Implementation of an Agent-based Bidding Consortium in the Architecture of an Agent-based Virtual Marketplace N2 - In this research project we intend to transfer the whole AEC-Bidding process to an agent-based virtual marketplace. Hereby, the existing legal regulations have to be considered. Important aspects in developing the virtual marketplace are to provide the possibility to realize an agentbased bidding consortium as well as to integrate subcontractors. KW - Mehragentensystem KW - Lernendes System KW - Ausschreibung KW - Internet Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2214 ER - TY - JOUR A1 - Gong, Dejun A1 - Huang, Limang A1 - Chen, Xi T1 - Research and Application on Highway Construction Visual Management Information System based on the Network and GIS N2 - The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management. KW - Geoinformationssystem KW - Straßenbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2661 ER - TY - JOUR A1 - Holtzhauer, Eric A1 - Saal, Helmut T1 - Product modelling in the steel construction domain N2 - The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Stahlbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2415 ER - TY - JOUR A1 - Huhn, Michael T1 - Abstract and Concrete Scenarios in Concurrent Engineering N2 - An architecture of a distributed planning system for the building industry has been developed. The emphasis is on highly collaborative environments in steelwork, timber construction etc. where designers concurrently handle 3D models. The overall system connects local design systems by the so-called Design Framework DFW. This framework consists of the definition of distributed components and protocols which make the collaborative design work. The process of collaborative design has been formalized on an abstract level. This paper describes how this has been done. A sample is given to illustrate the mapping of concrete scenarios of the ‘real design world’ to an abstract scenario level. This work is funded by the Deutsche Forschungsgemeinschaft DFG as part of the project SPP1103 (Meißner et al. 2003). KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - Framework Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2068 ER - TY - JOUR A1 - Kaapke, Kai A1 - Milbradt, Peter T1 - Voronoi-based finite volume method for transport problems N2 - Transport problems, as, for instance, the transport of sediment in hydraulic engineering and the transport of harmful substances through porous media, play an important role in many fields of civil engineering. Other examples include the dissipation of heat or sound as well as the simulation of traffic with macroscopic models. The contribution explains the analysis of the applicability of Voronoi-based finite volume methods for the approximation of solutions of transport problems. A special concern is the discretisation of the transport equation. Current limitations of the method as well as ideas for stabilisation are explained with examples. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Transport Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2558 ER - TY - JOUR A1 - Kabath, Meik A1 - Stuyts, Patrick T1 - Building Design towards 5-dimensions N2 - There exists a big gap between the capabilities of current 3D-CAD applications and their actual usage in practice. Many architects and planners still prefer to draft in 2D because the benefits of 3D modeling are difficult to explain. This presentation offers a basis to view the 3D building model not merely as the source for 2D plan generation. By adding extra dimensions like Time and Cost to the 3D building model it becomes possible to generate dynamic information on building construction progress with regards to used material, resources and cost. These additional benefits are key elements to many planners and contractors and may therefore widen the acceptance of 3D building modeling in general. KW - Bauindustrie KW - Baukonstruktion KW - Bauwerksplanung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2712 ER - TY - JOUR A1 - Kaklauskas, Gintaris A1 - Cervenka, Vladimir A1 - Cervenka, Jan T1 - Deflection Calculation of RC Beams: Finite Element Software versus Design Code Methods N2 - The paper investigates accuracy of deflection predictions made by the finite element package ATENA and design code methods ACI and EC2. Deflections have been calculated for a large number of experimental reinforced concrete beams reported by three investigators. Statistical parameters have been established for each of the technique at different load levels, separately for the beams with small and moderate reinforcement ratio. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Balken Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2498 ER - TY - JOUR A1 - Kang, Shihchung A1 - Miranda, Eduardo T1 - Automated Simulation of the Erection Activities in Virtual Construction N2 - The goal of the research is the development of a computer system to plan, simulate and visualize erection processes in construction. In the research construction cranes are treated as robots with predefined degrees of freedom and crane-specific motion planning techniques are developed to generate time-optimized and collision-free paths for each piece to be erected in the project. Using inverse kinematics and structural dynamics simulation, the computer system then computes the crane motions and velocities necessary to achieve the previously calculated paths. The main benefits of the research are the accurate planning and scheduling of crane operations leading to optimization of crane usage and project schedules, as well as improving overall crane safety in the project. This research is aimed at the development of systems that will allow computer-assisted erection of civil infrastructure and ultimately to achieve fully-automated erection processes using robotic cranes... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Baukonstruktion KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2310 ER - TY - JOUR A1 - Kang, Shihchung A1 - Miranda, Eduardo T1 - Physics Based Model for Simulating the Dynamics of Tower Cranes N2 - The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Turmdrehkran KW - Dynamische Belastung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2409 ER - TY - JOUR A1 - Kashiyama, Kazuo A1 - Hamada, Hidetaka A1 - Taniguchi, Takeo T1 - Large Scale Finite Element Simulation and Modeling Using GIS/CAD for Environmental Flows in Urban Area N2 - A large-scale computer modeling and simulation method is presented for environmental flows in urban area. Several GIS and CAD data were used for the preparation of shape model and an automatic mesh generation method based on Delaunay method was developed. Parallel finite element method based on domain decomposition method was employed for the numerical simulation of natural phenomena. The present method was applied to the simulation of flood flow and wind flow in urban area. The present method is shown to be a useful planning and design tool for the natural disasters and the change of environments. KW - Geoinformationssystem KW - Finite-Elemente-Methode KW - Stadtplanung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2675 ER - TY - JOUR A1 - Katranuschkov, Peter A1 - Gehre, Alexander A1 - Scherer, Raimar J. T1 - User Requirements Capture in Distributed Project Environments: A Process-centred Approach N2 - Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives. KW - Informationstechnik KW - Forschung KW - Europa KW - Bedarfsforschung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2029 ER - TY - JOUR A1 - Ke, Chen A1 - Jian Ming, Lu T1 - Study of Analysis System for Bridge Test N2 - Analysis System for Bridge Test (Chinese name abbr.: QLJC) is an application software specially designed for bridge test to analyze the static and dynamic character of bridge structures, calculate efficiency ratio of load test, pick up the results of observation points and so on. In this paper, research content, system design, calculation theory, characteristics and practical application of QLJC is introduced in detail. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Brückenbau KW - Straßenbrücke Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2547 ER - TY - JOUR A1 - Kicinger, Rafal A1 - Arciszewski, Tomasz A1 - De Jong, Kenneth T1 - Distributed Evolutionary Design: Island-Model-based Optimization of Steel Skeleton Structures in Tall Buildings N2 - This paper presents results of a study on distributed, or parallel, evolutionary computation in the topological design of steel structural systems in tall buildings. It describes results of extensive experimental research on various parallel evolutionary architectures applied to a complex structural design problem. The experiments were conducted using Inventor 2003, a networkbased evolutionary design support tool developed at George Mason University. First, a general introduction to evolutionary computation is provided with an emphasis on recent developments in parallel evolutionary architectures. Next, a discussion of conceptual design of steel structural systems in tall buildings is presented. Further, Inventor 2003 is briefly introduced as well as its design representation and evolutionary computation characteristics. Next, the results obtained from systematic design experiments conducted with Inventor 2003 are discussed. The objective of these experiments was to qualitatively and quantitatively investigate evolution of steel structural systems in tall buildings during a distributed evolutionary design process as well as to compare efficiency and effectiveness of various parallel evolutionary architectures with the traditional evolutionary design approaches. Two connectivity topologies (ring topology and fully-connected topology) have been investigated for four populations of structural designs evolving in parallel and using various migration strategies. Also, results of the initial sensitivity studies are reported in which two ways of initializing distributed evolutionary design processes were investigated, using either arbitrarily selected designs as initial parents or randomly generated ones. Finally, initial research conclusions are presented. KW - Mehragentensystem KW - Lernendes System KW - Stahlbau KW - Skelettbau KW - Optimierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2195 ER - TY - JOUR A1 - Kiviniemi, Arto A1 - Fischer, Martin T1 - Requirements Management Interface to Building Product Models N2 - In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Bauwerk KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2427 ER - TY - JOUR A1 - Koike, Hirotaka A1 - Morimoto, Akinori A1 - Imamura, Maki T1 - A Study on the Relationships of Residential Electricity Consumption and Automobile Energy Consumption with Urban Forms Using GIS N2 - In this Paper, we explored the relation between the electricity consumption in residential sector and the automobile energy consumption in transportation sector in accordance with the location of city by employing Geographic Information System (GIS). We found in the study that the electricity consumption per capita has a tendency that is higher in city center and lower in suburbs in Utsunomiya city. It is also noted that there is little difference among total consumption between city center and suburbs, despite the fact that the density of electric appliances tends to increase in a small size house of city center and the amount of automobile energy consumption from residence is lower in city center than in suburbs. KW - Geoinformationssystem KW - Stadtplanung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2690 ER - TY - JOUR A1 - Koike, Hirotaka A1 - Morimoto, Akinori A1 - Nomura, Kazuhiro T1 - Development of Urban Land Use Model to Compare Transit-Oriented and Automobile-Oriented Cities N2 - This study is an attempt to develop a simple simulation model that can compare the differences between automobile-oriented and transit-oriented cities, and clarify the difference between city forms by transportation modes. Following a theoretical model development, a series of simulation runs are tried. The model allocates people who commute to CBD from residential zones along a transportation corridor. As a result of many simulation analyses, it is shown that automobiles need much more traffic space in comparison with the transit as is shown by the proposed traffic space ratio both in CBD and along the corridor. KW - Verkehrsplanung KW - Simulation KW - Stadtplanung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2621 ER - TY - JOUR A1 - Kraft, Bodo A1 - Wilhelms, Nils T1 - Interactive Distributed Knowledge Support for Conceptual Building Design N2 - In our project, we develop new tools for the conceptual design phase. During conceptual design, the coarse functionality and organization of a building is more important than a detailed worked out construction. We identify two roles, first the knowledge engineer who is responsible for knowledge definition and maintenance; second the architect who elaborates the conceptual design. The tool for the knowledge engineer is based on graph technology, it is specified using PROGRES and the UPGRADE framework. The tools for the architect are integrated to the industrial CAD tool ArchiCAD. Consistency between knowledge and conceptual design is ensured by the constraint checker, another extension to ArchiCAD. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - Konzipieren Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2094 ER - TY - JOUR A1 - Kwak, Hyo-Gyoung A1 - Kim, Jin-Kook T1 - Efficient Shoring System in RC Frame Structures N2 - In this paper, systematic analyses for the shoring systems installed to support the applied loads during construction are performed on the basis of the numerical approach. On the basis of a rigorous time-dependent analysis, structural behaviors of reinforced concrete (RC) frame structures according to the changes in design variables such as the types of shoring systems, shore stiffness and shore spacing are analyzed and discussed. The time-dependent deformations of concrete such as creep and shrinkage and construction sequences of frame structures are also taken into account to minimize the structural instability and to reach to an improved design of shoring system because these effects may increase the axial forces delivered to the shores. In advance, the influence of the column shortening effect, generally mentioned in a tall building structure, is analyzed. From many parametric studies, it has been finally concluded that the most effective shoring system in RC frame structures is 2S1R (two shores and one reshore) regardless of the changes in design variables. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Skelettbau KW - Construction Sequence KW - Shoring System KW - Shore Stiffness KW - Shore Spacing Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2511 ER - TY - JOUR A1 - Lee, Kangkun A1 - Lee, Kijang T1 - Additional bending moment for shear-lag phenomenon in tube structures N2 - Framed-tube system with multiple internal tubes is analysed using an orthotropic box beam analogy approach in which each tube is individually modelled by a box beam that accounts for the flexural and shear deformations, as well as the shear-lag effects. A simple numerical modeling technique is proposed for estimating the shear-lag phenomenon in tube structures with multiple internal tubes. The proposed method idealizes the framed-tube structures with multiple internal tubes as equivalent multiple tubes, each composed of four equivalent orthotropic plate panels. The numerical analysis is based on the minimum potential energy principle in conjunction with the variational approach. The shear-lag phenomenon of such structures is studied taking into account the additional bending moments in the tubes. A detailed work is carried out through the numerical analysis of the additional bending moment. The moment factor is further introduced to identify the shear lag phenomenon along with the additional moment. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Hochhaus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2472 ER - TY - JOUR A1 - Likhitruangsilp, Veerasak A1 - Ioannou, Photios T1 - Risk-sensitive Markov Decision Process for Underground Construction Planning and Estimating N2 - This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference. KW - Mehragentensystem KW - Lernendes System KW - Tunnel KW - Markowschke KW - Kette Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2247 ER - TY - JOUR A1 - Ma, Zhiliang A1 - Qin, Liang T1 - A Framework of Management Information System for Construction Projects N2 - A comprehensive framework of information management system for construction projects in China has been established through extensive literature survey and field investigation. It utilizes the potential information technologies and covers the practical management patterns as well as the major aspects of construction project management. It can be used to guide and evaluate the design of the information management systems for construction projects in order to make the system to be applicable to a wide variety of construction projects and survive the changes in project management. KW - Mehragentensystem KW - Lernendes System KW - Managementinformationssystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2126 ER - TY - JOUR A1 - Makanae, Koji T1 - Highway Sequence Editor based on the Length-based Highway Product Model N2 - The highway product model based on the length information of the centerline, and the application system is developed. This paper shows the schema and the modeling process of the product model, which includes geometric elements such as an alignment, lanes, sidewalks, shoulders and sprits, and accessories such as guard fences, plantings and signs. Furthermore, The Highway Sequence Editor (HSE) is developed as an application system to verify the model. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Straßenbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2347 ER - TY - JOUR A1 - Melnikov, B. E. A1 - Semenov, Artem T1 - Application of Multimodel Method of Elasto-Plastic Analysis for the Multilevel Computation of Structures N2 - Creation of hierarchical sequence of the plastic and viscoplastic models according to different levels of structure approximations is considered. Developed strategy of multimodel analysis, which consists of creation of the inelastic models library, determination of selection criteria system and caring out of multivariant sequential clarifying computations, is described. Application of the multimodel approach in numerical computations has demonstrated possibility of reliable prediction of stress-strain response under wide variety of combined nonproportional loading. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Elastoplastizität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2487 ER - TY - JOUR A1 - Milbradt, Peter A1 - Schierbaum, Jochen A1 - Schwöppe, Axel T1 - Finite Cell-Elements of Higher Order N2 - The method of the finite elements is an adaptable numerical procedure for interpolation as well as for the numerical approximation of solutions of partial differential equations. The basis of these procedure is the formulation of suitable finite elements and element decompositions of the solution space. Classical finite elements are based on triangles or quadrangles in the two-dimensional space and tetrahedron or hexahedron in the threedimensional space. The use of arbitrary-dimensional convex and non-convex polyhedrons as the geometrical basis of finite elements increases the flexibility of generating finite element decompositions substantially and is sometimes the only way to get a clear decomposition... KW - Finite-Elemente-Methode KW - Physikalisches Verfahren Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2524 ER - TY - JOUR A1 - Mironov, Vadim A1 - Pahl, Peter Jan T1 - A Prismatic Finite Element for Accurate Arch Dam Analysis N2 - The displacements and stresses in arch dams and their abutments are frequently determined with 20-node brick elements. The elements are distorted near the contact plane between the wall and the abutment. A cantilever beam testbed has been developed to investigate the consequences of this distortion. It is shown that the deterioration of the accuracy in the computed stresses is significant. A compatible 18-node wedge element with linear stress variation is developed as an alternative to the brick element. The shape of this element type is readily adapted to the shape of the contact plane. It is shown that the accuracy of the computed stresses in the vicinity of the contact plane is improved significantly by the use of wedge elements. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Dammbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2467 ER - TY - JOUR A1 - Monobe, Kantaro A1 - Tanaka, Shigenori A1 - Furuta, Hitoshi T1 - Development of a System for Making Guide Maps based on the Idea of the Cognitive Map N2 - Digital maps are very easily applied as route guide maps. Route guide maps are provided through Web or a mobile phone services, and demand for such services is increasing. However, the production of a route guide map requires a great deal of time. Therefore, it is difficult for general users to make route guide maps. The purpose of the present research is the development of a system that can generate a route guide map using the Digital Map 2500 (Spatial Data Framework) published by the Geographical Survey Institute. This system will not require advanced equipment or expert knowledge. Therefore, anyone can produce route guide maps easily and quickly. By using the Digital Map 2500, the time and cost required in order to generate a map are reduced. Moreover, a useful route guide map can be created by simplifying the map form based on the human cognitive map. KW - Geoinformationssystem KW - Straßenkarte Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2688 ER - TY - JOUR A1 - Most, Thomas A1 - Bucher, Christian A1 - Schorling, York T1 - Dynamic stability analysis of non-linear structures with geometrical imperfections under random loading JF - Journal of Sound and Vibration N2 - Dynamic stability analysis of non-linear structures with geometrical imperfections under random loading KW - Angewandte Mathematik KW - Strukturmechanik Y1 - 2004 SP - 381 EP - 400 ER - TY - JOUR A1 - Most, Thomas A1 - Eckardt, Stefan T1 - Application of a hybrid parallelization technique to accelerate the numerical simulation of nonlinear mechanical problems N2 - This paper presents the combination of two different parallelization environments, OpenMP and MPI, in one numerical simulation tool. The computation of the system matrices and vectors is parallelized with OpenMP and the solution of the system of equations is done with the MPIbased solver MUMPS. The efficiency of both algorithms is shown on several linear and nonlinear examples using the Finite Element Method and a meshless discretization technique. KW - Framework KW - API KW - Parallelverarbeitung KW - Finite-Elemente-Methode Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2599 ER - TY - JOUR A1 - Motawa, Ibrahim A1 - Anumba, Chimay A1 - El-Hamalawi, A. T1 - Development of a Fuzzy System for Change Prediction in Construction Projects N2 - Change management has been the focus of different IT systems. These IT systems were developed to represent design information, record design rationale, facilitate design coordination and changes. They are largely based on managing reactive changes, particularly design changes, in which changes are recorded and then propagated to the relevant project members. However, proactive changes are hardly dealt with in IT systems. Proactive changes require estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. This is a major outcome of the case studies carried out as part of this research. Therefore, the proposed model considers that incomplete knowledge and certain project characteristics are always behind change causes. For proactive changes, predicting a change event is the main task for modelling. The prediction model should strive to integrate these main elements: 1) project characteristics that lead to change 2) causes of change, 3) the likelihood of change occurrence, and 4) the change consequences. It should also define the dependency relationships between these elements. However, limited data (documented) are only available from previous projects for change cases and many of the above elements can only be expressed in linguistic terms. This means that the model will simulate the uncertainty and subjectivity associated with these sets of elements. Therefore, a fuzzy model is proposed in this research to capture these elements. The model analyses the impact of each set of elements on the other by assigning fuzzy values for these elements that express the uncertainty and subjectivity of their impact. The main aim is to predict change events and evaluate change effects on project parameters. The fuzzy model described above was developed in an IT system for operational purposes and was designed as a Java package of components with their supporting classes, beans, and files. This paper describes the development and the architecture of the proposed IT system to achieve these requirements. The system is intended to help project teams in dealing with change causes and then the change consequences in construction projects. KW - Mehragentensystem KW - Lernendes System KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2180 ER - TY - JOUR A1 - Neef, Sonja T1 - Was ist Europäische Medienkultur? T1 - Translating Europe N2 - Der Sage nach wurde Europa, jene fremde Königstochter, vom Göttervater Zeus in der Verkleidung eines majestätischen Stiers vom fernen Phoenizien nach Kreta – wörtlich – „übertragen“, das heißt von hier nach dort getragen. So gesehen erzeugt Europa einen dritten Raum, einen Trenn- und/oder Bindestrich zwischen Orient und Okzident, als diasporadische Figur und auch als Kontinent. Die Logik eines solchen Strichs, der zugleich trennt und verbindet, findet eine kartographische Entsprechung im nullten Längengrad, der die ganze Welt in ein Einheit schaffendes Koordinatensystem „übersetzt“, mit Greenwich als Zentrum. Ein Äquivalent eines solchen fixen Ausgangspunktes findet sich in der perspektivischen Europa-Darstellung in Tiepolos Darstellung der Kontinente im Deckenfries des Treppenhauses der Fürstbischöflichen Residenz in Würzburg. In diesem architektonischen Gemälde bildet Europa das Frontispiz, das nur von einem privilegierten Standort auf dem ersten Treppenabsatz unverzerrt betrachtet werden kann. Gegenstand dieses Beitrags sind eben diese drei medienkulturellen Europa-Inszenierungen: 1.) eine Sage, 2.) das kartographische Element des Nullmeridians und 3.) Tiepolos Treppenhausgemälde, sie alle verstehe ich als medienkulturelle Übersetzungen Europas. Ziel dieses Beitrags ist es zu fragen, wie diese drei kulturellen Objekte in ihren jeweiligen medialen Modi am Europa-Begriff arbeiten. Dreh- und Angelpunkt ist dabei der Akt des Übersetzens, und zwar sowohl im Sinne einer Umschrift von einem medialen Modus in den anderen als auch als durchaus physisch zu verstehende Bewegung einer Migration zwischen Heimat und Fremde. Ergebnis dieser Betrachtungen ist ein Europa-Begriff, der nicht unproblematisch mit sich selbst identisch ist, sondern sich erst in der Bewegung des Übersetzens konstituiert, also im dritten Raum oder als Bindestrich zwischen den Kulturen. N2 - The “origin” of the idea of Europe—if there is one—may be found in Hesiod’s mythological writings. Europe, daughter of Agenor, was—literally—“translated” from Phoenicia to Crete by Zeus who was disguised as a majestic bull. Thus seen, deception and robbery form the foundation of the birth of a continent, at least mythologically. This idea of Europe from antiquity soon developed into a world view in which Europe formed the centre of the terra cognita. In order for the terra incognita to be positioned in relation to this, a fixed point was required. This was finally found in the cartographic element of the zero-meridian. As an ideological line, the longitude-zero provided a unifying system into which the whole world was to be “translated.” Such a euro-centristic zero-point is not only found in cartography, it also has an equivalent (or translation) in perspectival painting, namely in the zero-point or vanishing point. The cultural significance of a zero-point in relation to the idea of Europe is particularly striking in Tiepolo’s painting of the continents in the Treppenhaus in Würzburg. In this architectonic painting, Europe is the subject matter of the frontispiece painted on the stair-well. In order to view this work without distorting the representation, it must be seen from a privileged point on the first half-landing. Here again: deception and illusion. The aim of this paper is to destabilize precisely these fixed positions which establish a Europe that appears unproblematically identical with itself. To do so, I will risk gazing at Tiepolo’s Europe from marginal points of view; that is, from Africa or Asia. And—for the longitude-zero—I will question the cut of the world into two opposite hemispheres, east and west. Europe, then, appears to be always in a state of translation, never fixed in an origin, never being ‘home’ as a final destination. Likewise the Europe in mythology, Europe as a continent, is split by difference while simultaneously driven by desire for a foreign country (Crete). Similarly, the zero-meridian, is a hybrid in between west and east, a translation in between home and abroad. Europe is then always permeated with otherness. KW - Kulturwissenschaften KW - Studiengang Kulturwissenschaften KW - Kulturwissenschaftliches Studium KW - Kulturwissenschaftler KW - Medienkultur KW - Europa KW - Geschichte KW - Antike KW - Culture of Media KW - History KW - europe Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2262 N1 - Eine englische Version dieses Artikels erscheint in Discerning Translations, ed. Mieke Bal and Joanne Morra, Princeton UP (forthcoming). ER - TY - JOUR A1 - Neuberg, Frank A1 - Fank, Ernst A1 - Ekkerlein, Christian T1 - Integrated Life Cycle Simulation and Assessment of Buildings N2 - Buildings require both for construction and, due to their comparatively long life cycle for maintenance, significant raw material and energy resources. So far available knowledge about resource consumption during an entire life cycle of a building is still quite rare, because various criteria affect each other and/or overlay mutually. In this contribution a model based software concept is presented using an integrated approach for life cycle simulation and assessment of buildings. The essential point of the development consists of connecting an IFC compliant product model of a building via the Internet with data bases for the resource and energy requirement of building materials. Furthermore, numerical simulations allow calculating and minimizing the energy consumption, the resource requirement, the waste streams and also the noxious emissions. In the context of this paper we present the first release of software programs for architects and engineers, which help them to evaluate their design decisions objectively in early planning steps. Additionally the usage of the software is demonstrated by a test case study for a real world building. By applying this software in practice a substantial contribution for saving energy and natural resources can be provided in the sense of sustainable and ecological building design. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2351 ER - TY - JOUR A1 - Noh, Jung-Hwi A1 - Park, Jong-Heon T1 - A Calculation of Initial Cable Force for Ko-Ha Grand Bridge N2 - The primary objective of initial shape analysis of a cable stayed bridge is to calculate initial installation cable tension forces and to evaluate fabrication camber of main span and pylon providing the final longitudinal profile of the bridge at the end of construction. In addition, the initial cable forces depending on the alternation of the bridge’s shape can be obtained from the analysis, and will be used to provide construction safety during construction. In this research, we conducted numerical experiments for initial shape of Ko-ha bridge, which will be constructed in the near future, using three different typical methods such as continuous beam method, linear truss method, and IIMF (Introducing Initial Member Force) method KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Hängebrücke KW - cable stayed bridge KW - cable force KW - initial shape KW - initial equilibrium state Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2459 ER - TY - JOUR A1 - Osada, Teppei A1 - Koike, Hirotaka A1 - Morimoto, Akinori T1 - Research on Establishment of a Standard of Traffic Impact Assessment with Integrated Database System N2 - Planning support systems, such as geographical information system (GIS) and traffic flow simulation models, are widely in use in recent urban planning research. In this paper we propose a method to apply traffic impact assessment (TIA) to large-scale, commercial developments. In TIA research we often encounter the problem of increasing amount of data that is necessary for detailed investigation and analysis, as the scale of commercial developments become larger and more complex. As a result, TIA presents two problems. The first problem is the difficulty of data acquisition. The second problem is the reliability of data. As a solution, we developed an integrated database system. KW - Verkehrsplanung KW - Simulation KW - Datenbanksystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2647 ER - TY - JOUR A1 - Palaneeswaran, Ekambaram A1 - Kumaraswamy, Mohan A1 - Ng, Thomas T1 - Knowledge Management for Small and Medium Contractors N2 - Effective knowledge management is increasingly considered as a cornerstone of sustainable business success. Knowledge management systems are strategically valuable for both ensuring consistency and continuous improvement of various aspects such as quality delivery, productivity and competitiveness. The small and medium enterprises (SMEs) in the construction industry are mostly operating under tighter timeframes, narrower profit margins and more constrained resources. Hence the recently commenced SMILE-SMC (Strategic Management with Information Leveraged Excellece for Small and Medium Contractors) project aims to support the information and knowledge management needs of the small and medium contractors in Hong Kong. This paper presents some snapshots on the SMILE-SMC project, and its conceptualized deliverables with some highlights of recent developments. KW - Wissensmanagement KW - Klein- und Mittelbetrieb Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2582 ER - TY - JOUR A1 - Pick, Tobias A1 - Heimsund, Bjoern-Ove A1 - Milbradt, Peter T1 - Development and Analysis of Sparse Matrix Concepts for Finite Element Approximation on general Cells N2 - In engineering and computing, the finite element approximation is one of the most well-known computational solution techniques. It is a great tool to find solutions for mechanic, fluid mechanic and ecological problems. Whoever works with the finite element method will need to solve a large system of linear equations. There are different ways to find a solution. One way is to use a matrix decomposition technique such as LU or QR. The other possibility is to use an iterative solution algorithm like Conjugate Gradients, Gauß-Seidel, Multigrid Methods, etc. This paper will focus on iterative solvers and the needed storage techniques... KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Bandmatrix Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2500 ER - TY - JOUR A1 - Romberg, Richard A1 - Niggl, Andreas A1 - van Treeck, Christoph T1 - Structural Analysis based on the Product Model Standard IFC N2 - In this paper we present a computer aided method supporting co-operation between different project partners, such as architects and engineers, on the basis of strictly three-dimensional models. The center of our software architecture is a product model, described by the Industry Foundation Classes (IFC) of the International Alliance for Interoperability (IAI). From this a geometrical model is extracted and automatically transferred to a computational model serving as a basis for various simulation tasks. In this paper the focus is set on the advantage of the fully three-dimensional structural analysis performed by p-version of the finite element analysis. Other simulation methods are discussed in a separate contribution of this Volume (Treeck 2004). The validity of this approach will be shown in a complex example. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Statik KW - Standard Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2433 ER - TY - JOUR A1 - Rose, Martin T1 - Modeling of Freeway Traffic N2 - An integrated modeling of freeway traffic is developed, whose implementation in an uniform computer –aided simulation model facilitate comparative evaluation and systematic coupling of several traffic simulations, traffic controls, traffic measurements and traffic scenarios. The integrated modeling of freeway traffic is a basic mapping of freeway networks, control methods, measurements and different simulations of traffic flow... KW - Verkehrsplanung KW - Simulation KW - Autobahn Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2639 ER - TY - JOUR A1 - Schnellenbach-Held, Martina A1 - Hartmann, Markus T1 - Knowledge Based Systems in Distributed Desgin Environments N2 - Today’s building industry not only demands more and more reduced construction time on building site, but also an advanced and mostly construction attendant design phase. Even though there is software available to support design processes in distributed environments, most applications only support simple document based exchange of information. In this paper a knowledge based system is presented to support cooperative, comprehensive design processes in distributed environments. The presented research project is financially supported by the German Research Community (DFG – Deutsche Forschungsgemeinschaft). KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - Wissensmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2106 ER - TY - JOUR A1 - Semenov, Vitaly A1 - Alekseeva, Elena A1 - Tarlapan, Oleg T1 - Virtual Construction using Map-based Approach N2 - The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Virtuelle Realität KW - Bauwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2447 ER - TY - JOUR A1 - Semenov, Vitaly A1 - Bazhan, Andrew A1 - Morozov, Sergey T1 - Distributed STEP-Compliant Platform for Multimodal Collaboration in Architecture, Engineering, and Construction N2 - This paper presents an innovative software platform OpenSTEP intended to build advanced distributed integrated systems and to conduct multidisciplinary collaborative projects in both academy and industry. The paper discusses an open system architecture, methodology, component library and CASE toolkit enabling the developers to build a wide range of interoperable applications and systems compliant with STEP and, particularly, with IFC becoming the increasingly important standard for information integration in architecture, engineering and construction. KW - Framework KW - API KW - STEP KW - Verteiltes System Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2616 ER - TY - JOUR A1 - Shih, Naai-Jung A1 - Lee, Wen-Pang T1 - Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space N2 - An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Luft KW - Schadstoffkonzentration Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2376 ER - TY - JOUR A1 - Staub-French, Sheryl T1 - Feature-based Product Modeling for Building Construction N2 - Current building product models explicitly represent components, attributes of components, and relationships between components. These designer-focused product models, however, do not represent many of the design conditions that are important for construction, such as component similarity, uniformity, and penetrations. Current design and construction tools offer limited support for detecting these construction-specific design conditions. This paper describes the ontology we developed using the manufacturing concept of features to represent the design conditions that are important for construction. The feature ontology provides the blueprint for the additions and changes needed to transform a standard product model into a constructionspecific product model. The ontology formalizes three classes of features, defines the attributes and functions of each feature type, and represents the relationships between features explicitly. The descriptive semantics of the ontology allows practitioners to represent their varied preferences for naming features, specifying features that result from component intersections and the similarity of components, and grouping features that affect a specific construction domain. A software prototype that implements the ontology enables practitioners to transform designer-focused product models into feature-based product models that represent the construction perspective. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Baukonstruktion KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2331 ER - TY - JOUR A1 - Takagi, Kousuke A1 - Tani, Akinori A1 - Kawamura, Hiroshi T1 - Research on Intelligent Fuzzy Optimal Active and Hybrid Control Systems of Building Structures - Verification of Optimization Method on Switching Rules of Control Forces N2 - Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified. KW - Mehragentensystem KW - Lernendes System KW - Fuzzy-Logik KW - Optimierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2238 ER - TY - JOUR A1 - van Treeck, Christoph A1 - Rank, Ernst T1 - Analysis of building structure and topology based on Graph Theory N2 - Individual views on a building product of people involved in the design process imply different models for planning and calculation. In order to interpret these geometrical, topological and semantical data of a building model we identify a structural component graph, a graph of room faces, a room graph and a relational object graph as aids and we explain algorithms to derive these relations. The application of the technique presented is demonstrated by the analysis and discretization of a sample model in the scope of building energy simulation. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Graphentheorie KW - Ingenieurbau Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2308 ER - TY - JOUR A1 - Vogel, Manfred A1 - Breit, Manfred A1 - Märki, Fabian T1 - Optimization of 4D Process Planning using Genetic Algorithms N2 - The presented work focuses on the presentation of a discrete event simulator which can be used for automated sequencing and optimization of building processes. The sequencing is based on the commonly used component–activity–resource relations taking structural and process constraints into account. For the optimization a genetic algorithm approach was developed, implemented and successfully applied to several real life steel constructions. In this contribution we discuss the application of the discrete event simulator including its optimization capabilities on a 4D process model of a steel structure of an automobile recycling facility. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Genetischer Algorithmus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2360 ER - TY - JOUR A1 - Volkova, Viktorija T1 - The analysis of dynamic behaviour of pre-stressed systems under polyharmonic excitations N2 - Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application. KW - Verkehrsplanung KW - Simulation KW - Baukonstruktion KW - Dynamische Belastung KW - Tragwerk / Vorspannung KW - Vorgespannte Konstruktion Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2656 ER - TY - JOUR A1 - Weise, Matthias A1 - Katranuschkov, Peter A1 - Scherer, Raimar J. T1 - Generic Services for the Support of Evolving Building Model Data N2 - Many problems related to data integration in AEC can be better tackled by an approach that takes into account the heterogeneity of tasks, models and applications but does not require continuous consistency of the evolving design data, at each data management operation. Such an approach must incorporate adequate services that can facilitate reintegration of concurrently modified data at reasonably selected coordination points. In this paper we present a set of methods which, used in combination, can achieve that goal. After a description of the principal envisaged cooperative work scenario each of these methods is discussed in detail and current observations drawn from their software realisation are given. Whilst the suggested approach is valid for any EXPRESS-based data model, the practical focus of work has been on facilitating IFC-driven integration. KW - Produktmodell KW - Bautechnik KW - Forschungskooperation KW - EXPRESS Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2077 ER - TY - JOUR A1 - Willenbacher, Heiko A1 - Hübler, Reinhard T1 - Intelligent Link-Management for the Support of Integration in Building Life Cycle N2 - The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants. KW - Mehragentensystem KW - Lernendes System KW - Bauwerk KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2223 ER - TY - JOUR A1 - Yabuki, Nobuyoshi A1 - Kotani, Jun A1 - Shitani, Tomoaki T1 - A Steel Bridge Design System Architecture using VR-CAD and Web Service-based Multi-Agents N2 - This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system. KW - Mehragentensystem KW - Lernendes System KW - Stahlbrücke KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2146 ER - TY - JOUR A1 - Yabuki, Nobuyoshi A1 - Yoshimura, Yutaka T1 - An Evaluation System for Steel Structures of Hydroelectric Power Stations based on Fault Tree Analysis and Performance Maps N2 - This paper presents an evaluation system for steel structures of hydroelectric power stations, including hydraulic gates and penstocks, based on Fault Tree Analyasis (FTA) and performance maps. This system consists of fault tree diagrams of FTA, performance maps, design and analysis systems, and engineerin databases. These four modules are integrated by appropriate hyperlinks so that the user of this system can use it easily and seamlessly. A well developed system was applied to some illustrative example cases, and they showed that the developed methodology and system worked well and the users found the system useful and effective for their maintenance tasks at powerstations. KW - Wissensmanagement KW - Stahlbau KW - Wasserkraftwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2564 ER - TY - JOUR A1 - Zavadskas, Edmundas Kazimieras A1 - Kaklauskas, Arturas T1 - Civil Engineering Decision Support Systems in Lithuania N2 - Civil engineering decision support systems (construction, building life cycle, refurbishment, total quality management, innovation, etc.) created in Lithuania are described in this paper. The above decision support systems comprise of the following constituent parts: data (database and its management system), models (model base and its management system) and a user interface. Presentation of information in databases may be in conceptual (digital, textual, graphical, photographic, video) and quantitative forms. Quantitative information presented involves criteria systems and subsystems, units of measurement, values and initial weight fully defining the variants provided. The databases were developed providing a multiple criteria analysis of alternatives from economical, infrastructure, technical, technological, qualitative, legislative, social and other perspectives. This information is provided in a user-oriented way. Since the analysis of alternatives is usually performed by taking into account economical, infrastructure, technical, technological, qualitative and other factors, a model-base include models which enable a decision maker to carry out a comprehensive analysis of the variants available and make a proper choice. These systems, related questions and practical case study were analysed the paper. KW - Wissensmanagement KW - Bautechnik KW - Entscheidungsunterstützungssystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2579 ER - TY - JOUR A1 - Zavadskas, Edmundas Kazimieras A1 - Kaklauskas, Arturas A1 - Viteikiene, Milda T1 - Database of Best Practices and Decision Support Web-based System for Construction Innovation N2 - Many construction and facilities management Web sites can be found on the Internet. The interested parties on construction and facilities management Web sites can find databases of best practices, calculators, analyzers, software, expert and decision support systems, neural networks, etc. Technological innovation mainly through changes in the availability of information and communication technology inclusive databases of best practices, calculators, analyzers, software, neural networks, decision support and expert systems that have been provided by a variety of new services developed by the construction and facilities management sectors. Most of all calculators, analyzers, software, decision support and expert systems, neural networks and on-line systems seek to find out how to make the most economic decisions and most of all these decisions are intended only for economic objectives. Alternatives under evaluation have to be evaluated not only from the economic position, but take into consideration qualitative, technical, technological and other characteristics as well. Based on the analysis of the existing calculators, analyzers, information, expert and decision support systems, neural networks and in order to determine most efficient versions of best practices a Decision Support Web-Based System for Construction Innovation (IDSS) was developed by Vilnius Gediminas Technical University. KW - Mehragentensystem KW - Lernendes System KW - Wissensverarbeitung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2173 ER -