TY - JOUR A1 - Foorgber, U. A1 - Müller, Christian T1 - A Planning Process Model for Computer Supported Cooperative Work in Building Construction N2 - Increasing complexity of today's buildings requires a high level of integration in the planning process. Common planning strategies, where individual project partners cooperate mainly to exchange results, are not suitable to jointly develop project goals and objectives. Integrated planning, a more holistic approach to deal with complex problems, is based on a high degree of communication amoung team members and leads to a goal oriented cooperation. Current approaches in the reasearch area of Computer Supported Cooperative Work (CSCW) poorly meet the requirements in planning. A planning process model, based on the principles of integrated planning will be introduced, aimed to provide the background for the implementation of a CSCW-platform. KW - Bauwesen KW - Integrierte Planung KW - Computer Supported Cooperative Work Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4922 ER - TY - CHAP A1 - Petersen, Michael A1 - Diaz, Joaquin T1 - Integrated planning of buildings based on computer models in project communication systems N2 - The increasing demands in building and civil engineering – with regard to the growing amount of legal requirements and the needs of a flexible usage of the building - requires an optimisation of all processes during the planning and construction phases. This aim can be only reached by transferring of innovative information and communication technologies in the field of cooperation of all partners in a building project. In this article the enhancement of the existing planning processes based on an improved information management is introduced. Since the late 90ies the availability of hardware and software infrastructures for a networkbased cooperation, e.g. email, in small and middle-sized companies increased the problems of an unstructured communication in the planning and construction processes. These problems have not been solved by the usage of the upcoming project communication systems either, which are often used as a simple medium for data transfer. Because of the easy way of distributing documents to all planning partners a huge amount of files and subsequent versions can be stored so that the planners often have to scope with an information overflow. The underlying hierarchical structures based on simple files stored in tree views are not sufficient for an adequate representation of the different specific views of the planners and the management of relationships between the three information domains building structure, costs and time schedules. .. KW - Architektur KW - Verteiltes System KW - Integrierte Planung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1762 ER -