TY - THES A1 - Alabassy, Mohamed Said Helmy T1 - Automated Approach for Building Information Modelling of Crack Damages via Image Segmentation and Image-based 3D Reconstruction N2 - As machine vision-based inspection methods in the field of Structural Health Monitoring (SHM) continue to advance, the need for integrating resulting inspection and maintenance data into a centralised building information model for structures notably grows. Consequently, the modelling of found damages based on those images in a streamlined automated manner becomes increasingly important, not just for saving time and money spent on updating the model to include the latest information gathered through each inspection, but also to easily visualise them, provide all stakeholders involved with a comprehensive digital representation containing all the necessary information to fully understand the structure’s current condition, keep track of any progressing deterioration, estimate the reduced load bearing capacity of the damaged element in the model or simulate the propagation of cracks to make well-informed decisions interactively and facilitate maintenance actions that optimally extend the service life of the structure. Though significant progress has been recently made in information modelling of damages, the current devised methods for the geometrical modelling approach are cumbersome and time consuming to implement in a full-scale model. For crack damages, an approach for a feasible automated image-based modelling is proposed utilising neural networks, classical computer vision and computational geometry techniques with the aim of creating valid shapes to be introduced into the information model, including related semantic properties and attributes from inspection data (e.g., width, depth, length, date, etc.). The creation of such models opens the door for further possible uses ranging from more accurate structural analysis possibilities to simulation of damage propagation in model elements, estimating deterioration rates and allows for better documentation, data sharing, and realistic visualisation of damages in a 3D model. KW - Building Information Modeling KW - BIM KW - IFC KW - Damage Information Modelling KW - Cracks Segmentation KW - Cracks 3D Modelling KW - Netscape Internet Foundation Classes Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20230818-64162 ER - TY - THES A1 - Weise, Franziska T1 - Erfolgskritische Faktoren in exemplarischen Building Information Modeling Anwendungsfällen: Eine Analyse unter der Beachtung schleppender Digitalisierung und organisationaler Veränderungen N2 - Die fortschreitende Digitalisierung lässt innovative bauprojekt- und unternehmensinterne Workflows sowie Organisationssysteme entstehen. In diesem Zusammenhang ist die digitale Fortentwicklung durch Building Information Modeling [BIM] als Veränderungsprozess zu definieren, der Organisationsstrukturen nachhaltig umformen wird. BIM ist die führende digitale Arbeitsmethodik im Bauwesen, die entwurfs-, ausführungs- und bauprojektbezogenen Belangen gerecht werden kann. Die deutsche Bauwirtschaft ist im Vergleich zu anderen Branchen jedoch als digital rückständig zu betrachten. Sie ist durch einen Markt gekennzeichnet, an dem kleine und mittelständische Unternehmen [KMU] in hoher Zahl vertreten sind. Aufgrund von Anwendungsunkenntnis der kleinen und mittelständischen Unternehmen fehlt der flächendeckende und durchgängige BIM-Einsatz in Projekten. Mit dem Fokus auf dem Bauprojekt als temporärer Organisation adressiert der vorliegende Forschungsschwerpunkt die Schaffung eines realistischen Abbilds erprobter BIM-Anwendungsfälle in Modellprojekten. Herausgearbeitet werden derzeit bestehende BIM-Herausforderungen für Erstanwender, die die durchgängige BIM-Anwendung in Deutschland bisher hemmen. Die Forschungsarbeit fokussiert sich auf die Evaluation erfolgskritischer Faktoren [ekF] in BIM-Anwendungsfällen [AWF] im Rahmen einer qualitativen Inhaltsanalyse. Die digitale Transformation birgt strukturrelevante Veränderungsdeterminanten für Organisationen durch die BIM-Anwendung und außerdem Herausforderungen, die in der Anwendungsfallforschung betrachtet werden. Die Zielstellung ist dreiteilig. Ein entwickeltes BIM-Strukturmodell erfasst die aktuelle Richtlinienarbeit sowie Standardisierung und stellt dadurch den Rahmen notwendiger BIM-Strukturen im Bauprojekt auf. Aus dem Strukturmodell ist ein Modell zur Prüfung von Anwendungsfallrisiken abgeleitet worden. Dieses wird auf gezielt recherchierte BIM-Modellprojekte in Deutschland angewendet, um aus den erfolgskritischen Faktoren der darin praktizierten BIM-Anwendungsfälle eine ekF-Risikomatrix abzuleiten. Daraus geht ein unterstützendes BIM-Anwendungsinstrument in Form von BPMN-Abläufen für KMU hervor. Resultierend aus der Verbindung des BIM-Strukturmodels und der Anwendungsfallanalyse wird in den einzelnen Ablaufübersichten eine Risikoverortung je Anwendungsfall kenntlich gemacht. Unternehmen ohne BIM-Anwendungsexpertise in Bauprojektorganisationen erhalten auf diese Weise einen instrumentellen und niederschwelligen Zugang zu BIM, um die kollaborativen und wirtschaftlichen Vorteile der digitalen Arbeitsmethodik nutzen zu können. T3 - Schriften der Professur Baubetrieb und Bauverfahren - 41 KW - Building Information Modeling KW - Gebäudedaten-Modellierung KW - digitale Organisation Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20230302-49281 PB - Eigenverlag der Professur Baubetrieb und Bauverfahren CY - Weimar ER - TY - THES A1 - Wills, Nadine T1 - Modell bedarfsorientierter Leistungserbringung im FM auf Grundlage von Sensortechnologien und BIM N2 - Während der Digitalisierung im Bauwesen insbesondere im Bereich der Planungs- und Errichtungsphase von Bauwerken immer größere Aufmerksamkeit zuteilwird, ist das digitale Potenzial im Facility Management weit weniger ausgeschöpft, als dies möglich wäre. Vor dem Hintergrund, dass die Bewirtschaftung von Gebäuden jedoch einen wesentlichen Kostenanteil im Lebenszyklus darstellt, ist eine Fokussierung auf digitale Prozesse im Gebäudebetrieb erforderlich. Im Facility Management werden Dienstleistungen häufig verrichtungsorientiert, d. h. nach statischen Intervallen, oder bedarfsorientiert erbracht. Beide Arten der Leistungserbringung weisen Defizite auf, beispielweise weil Tätigkeiten auf Basis definierter Intervalle erbracht werden, ohne dass eine Notwendigkeit besteht oder weil bestehende Bedarfe mangels Möglichkeiten der Bedarfsermittlung nicht identifiziert werden. Speziell die Definition und Ermittlung eines Bedarfs zur Leistungserbringung ist häufig subjektiv geprägt. Auch sind Dienstleister oft nicht in frühen Phasen der Gebäudeplanung involviert und erhalten für ihre Dienstleistungen notwendige Daten und Informationen erst kurz vor Inbetriebnahme des zu betreibenden Gebäudes. Aktuelle Ansätze des Building Information Modeling (BIM) und die zunehmende Verfügbarkeit von Sensortechnologien in Gebäuden bieten Chancen, die o. g. Defizite zu beheben. In der vorliegenden Arbeit werden deshalb Datenmodelle und Methoden entwickelt, die mithilfe von BIM-basierten Datenbankstrukturen sowie Auswertungs- und Entscheidungsmethodiken Dienstleistungen der Gebäudebewirtschaftung objektiviert und automatisiert auslösen können. Der Fokus der Arbeit liegt dabei auf dem Facility Service der Reinigungs- und Pflegedienste des infrastrukturellen Facility Managements. Eine umfangreiche Recherche etablierter Normen und Standards sowie öffentlich zugänglicher Leistungsausschreibungen bilden die Grundlage der Definition erforderlicher Informationen zur Leistungserbringung. Die identifizierten statischen Gebäude- und Prozessinformationen werden in einem relationalen Datenbankmodell strukturiert, das nach einer Darstellung von Messgrößen und der Beschreibung des Vorgehens zur Auswahl geeigneter Sensoren für die Erfassung von Bedarfen, um Sensorinformationen erweitert wird. Um Messwerte verschiedener und bereits in Gebäuden existenten Sensoren für die Leistungsauslösung verwenden zu können, erfolgt die Implementierung einer Normierungsmethodik in das Datenbankmodell. Auf diese Weise kann der Bedarf zur Leistungserbringung ausgehend von Grenzwerten ermitteln werden. Auch sind Verknüpfungsmethoden zur Kombination verschiedener Anwendungen in dem Datenbankmodell integriert. Zusätzlich zur direkten Auslösung erforderlicher Aktivitäten ermöglicht das entwickelte Modell eine opportune Auslösung von Leistungen, d. h. eine Leistungserbringung vor dem eigentlich bestehenden Bedarf. Auf diese Weise können tätigkeitsähnliche oder räumlich nah beieinander liegende Tätigkeiten sinnvoll vorzeitig erbracht werden, um für den Dienstleister eine Wegstreckeneinsparung zu ermöglichen. Die Arbeit beschreibt zudem die für die Auswertung, Entscheidungsfindung und Auftragsüberwachung benötigen Algorithmen. Die Validierung des entwickelten Modells bedarfsorientierter Leistungserbringung erfolgt in einer relationalen Datenbank und zeigt simulativ für unterschiedliche Szenarien des Gebäudebetriebs, dass Bedarfsermittlungen auf Grundlage von Sensortechnologien erfolgen und Leistungen opportun ausgelöst, beauftragt und dokumentiert werden können. T3 - Schriften der Professur Baubetrieb und Bauverfahren - 42 KW - Facility-Management KW - Building Information Modeling KW - Datenmodell KW - Sensor KW - Bedarfsermittlung KW - Sensortechnologien KW - Facility Management KW - FM-Leistungserbringung Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20230214-49248 PB - Eigenverlag der Professur Baubetrieb und Bauverfahren CY - Weimar ER - TY - THES A1 - Walther, Tino T1 - Ein Modell zur Optimierung der Bauleistungsfeststellung von Linienbaustellen N2 - Das Wissen um den realen Zustand eines Bauprojektes stellt eine entscheidende Kernkompetenz eines steuernden bauausführenden Unternehmens dar. Der bewusste Umgang mit Informationen und deren effiziente Nutzung sind entscheidende Erfolgsfaktoren für die zeit-, kosten- und qualitätsgerechte Realisierung von Bauprojekten. Obwohl die erforderlichen Erfolgsfaktoren bekannt sind, sind Kosten- und Terminüberschreitungen von Bauprojekten keine Seltenheit – eher das Gegenteil ist der Fall. Zukunftsweisende Digitalisierungsprojekte aber geben Anlass zu Hoffnung. Ein Beispiel ist der bereits im Dezember 2015 vom Bundesministerium für Verkehr und digitale Infrastruktur ins Leben gerufene Stufenplan Digitales Planen und Bauen. Dieser hat die Aufgabe flächendeckend die Methodik des Building Information Modeling (BIM) im Infrastrukturbereich einzuführen und somit die Digitalisierung in Deutschland zukunftsweisend voranzutreiben, indem erfolgreiche Bauprojekte mit durchgängigen Informationsflüssen arbeiten. Seither existiert eine Vielzahl an Digitalisierungsprojekten, alle mit gleichen Zielen. Nachweislich lassen sich hinsichtlich dessen allerdings auch vermehrt Defizite aufzeigen. So ist der Fortschritt sehr heterogen verteilt und lässt sich für die Branche nicht allgemeingültig festlegen. Mit einer internationalen Literaturrecherche sowie einer empirischen Studie als Untersuchungsmethode wurde in Form von Interviews mit Fachkundigen der tatsächliche Zustand der Digitalisierungs- und der BIM-Anwendungen im Straßenbau für den Controllingprozess der Bauleistungsfeststellung untersucht. Die erhobenen Daten wurden aufbereitet und anschließend softwaregestützt einer inhaltlichen Analyse unterzogen. In Kombination mit den Ergebnissen der Literaturrecherche wurden notwendige Anforderungen für den Controllingprozess der Bauleistungsfeststellung erhoben. Auf dieser Grundlage wurde ein Modell im Sinne der Systemtheorie zur Optimierung der Bauleistungsfeststellung entwickelt. Gegenstand der vorliegenden Arbeit ist die Integration der modellbasierten Arbeitsweise in die Prozesse der Bauleistungsfeststellung eines Bauunternehmens. Grundlage ist die objektive Auswertung des Fertigstellungsgrades (Baufortschrittes) mittels Luftbildaufnahmen. Deren Auswertung auf Basis eines Algorithmus und die systematische Identifikation des Baufortschrittes integriert in den Prozess der Bauleistungsfeststellung werden zu einem neu entwickelten Gesamtsystem mit dem Ergebnis eines optimierten Modells. Das entwickelte Modell wurde hinsichtlich Anwendbarkeit und praktischer Relevanz an ausgewählten Beispielszenarien untersucht und nachgewiesen. N2 - The knowledge of the real-time condition of a construction project represents a decisive core competence of a controlling construction company. The conscious handling and efficient use of information can contribute to and be decisive success factors for the timely, cost-efficient, and high-quality realization of construction projects. Despite the knowledge of the necessary success factors, cost and schedule overruns of construction projects are not uncommon, rather the opposite. Hope is shown by forward- looking digitalization projects. The implementation plan for digital planning and construction launched in December 2015 by the Federal Ministry of Transport and Digital Infrastructure. Its task is to introduce the Building Information Modelling (BIM) methodology across the board and to drive forward digitization in the entire construction industry and generate successful construction projects with a continuous flow of information. Since then, there have been numerous digitization projects, all with the same goal. However, it has been proven that there are also increasing deficits. For example, progress is very heterogeneously distributed, and it is not possible to make a general statement for the industry. Based on an international literature investigation and an empirical study as the underlying research method, the actual state of digitalization and BIM applications in road construction for the controlling process of construction performance assessment was examined in the form of qualitative interviews with professionals. The collected data was processed and then subjected to a software-based content analysis. Furthermore, a model was developed in the sense of the system theory for optimizing the construction performance assessment based on the previous research. The integration of the model-based determination of the construction performance of a construction company is the subject of this dissertation. The basis is the objective evaluation of the degree of completion (construction progress) by means of aerial photographs. The model- and algorithm-based evaluation of the construction progress combined with the systematic integration in the process of the construction performance assessment becomes a newly developed overall system with the result of an optimized model. The developed model was examined and proven regarding applicability and practical relevance in selected example scenarios. T3 - Schriften der Professur Baubetrieb und Bauverfahren - 43 KW - Building Information Modeling KW - Building Information Modeling KW - Bauleistungsfeststellung KW - Leistungsmeldung KW - Controlling KW - Baubetrieb Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20230210-49115 PB - Eigenverlag der Professur Baubetrieb und Bauverfahren CY - Weimar ER - TY - JOUR A1 - Artus, Mathias A1 - Koch, Christian T1 - Object-Oriented Damage Information Modeling Concepts and Implementation for Bridge Inspection JF - Journal of Computing in Civil Engineering N2 - Bridges are designed to last for more than 50 years and consume up to 50% of their life-cycle costs during their operation phase. Several inspections and assessment actions are executed during this period. Bridge and damage information must be gathered, digitized, and exchanged between different stakeholders. Currently, the inspection and assessment practices rely on paper-based data collection and exchange, which is time-consuming and error-prone, and leads to loss of information. Storing and exchanging damage and building information in a digital format may lower costs and errors during inspection and assessment and support future needs, for example, immediate simulations regarding performance assessment, automated maintenance planning, and mixed reality inspections. This study focused on the concept for modeling damage information to support bridge reviews and structural analysis. Starting from the definition of multiple use cases and related requirements, the data model for damage information is defined independently from the subsequent implementation. In the next step, the implementation via an established standard is explained. Functional tests aim to identify problems in the concept and implementation. To show the capability of the final model, two example use cases are illustrated: the inspection review of the entire bridge and a finite-element analysis of a single component. Main results are the definition of necessary damage data, an object-oriented damage model, which supports multiple use cases, and the implementation of the model in a standard. Furthermore, the tests have shown that the standard is suitable to deliver damage information; however, several software programs lack proper implementation of the standard. KW - Building Information Modeling KW - Brücke KW - Inspektion KW - Produktdaten KW - Objektorientierung KW - Building Information Modeling KW - Bridge KW - Inspection KW - Damage Information Modeling KW - Damage Y1 - 2022 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220826-47087 UR - https://ascelibrary.org/doi/10.1061/%28ASCE%29CP.1943-5487.0001030 VL - 2022 IS - Volume 36, issue 6 SP - 1 EP - 21 ER - TY - JOUR A1 - Artus, Mathias A1 - Koch, Christian T1 - State of the art in damage information modeling for RC bridges – A literature review JF - Advanced Engineering Informatics N2 - In Germany, bridges have an average age of 40 years. A bridge consumes between 0.4% and 2% of its construction cost per year over its entire life cycle. This means that up to 80% of the construction cost are additionally needed for operation, inspection, maintenance, and destruction. Current practices rely either on paperbased inspections or on abstract specialist software. Every application in the inspection and maintenance sector uses its own data model for structures, inspections, defects, and maintenance. Due to this, data and properties have to be transferred manually, otherwise a converter is necessary for every data exchange between two applications. To overcome this issue, an adequate model standard for inspections, damage, and maintenance is necessary. Modern 3D models may serve as a single source of truth, which has been suggested in the Building Information Modeling (BIM) concept. Further, these models offer a clear visualization of the built infrastructure, and improve not only the planning and construction phases, but also the operation phase of construction projects. BIM is established mostly in the Architecture, Engineering, and Construction (AEC) sector to plan and construct new buildings. Currently, BIM does not cover the whole life cycle of a building, especially not inspection and maintenance. Creating damage models needs the building model first, because a defect is dependent on the building component, its properties and material. Hence, a building information model is necessary to obtain meaningful conclusions from damage information. This paper analyzes the requirements, which arise from practice, and the research that has been done in modeling damage and related information for bridges. With a look at damage categories and use cases related to inspection and maintenance, scientific literature is discussed and synthesized. Finally, research gaps and needs are identified and discussed. KW - Building Information Modeling KW - Brücke KW - Inspektion KW - Literaturrecherche KW - Datenmodell Y1 - 2020 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220506-46390 UR - https://www.sciencedirect.com/science/article/abs/pii/S1474034620301427?via%3Dihub VL - 2020 IS - volume 46, article 101171 SP - 1 EP - 16 PB - Elsevier Science CY - Amsterdam ER - TY - JOUR A1 - Artus, Mathias A1 - Alabassy, Mohamed Said Helmy A1 - Koch, Christian T1 - A BIM Based Framework for Damage Segmentation, Modeling, and Visualization Using IFC JF - Applied Sciences N2 - Paper-based data acquisition and manual transfer between incompatible software or data formats during inspections of bridges, as done currently, are time-consuming, error-prone, cumbersome, and lead to information loss. A fully digitized workflow using open data formats would reduce data loss, efforts, and the costs of future inspections. On the one hand, existing studies proposed methods to automatize data acquisition and visualization for inspections. These studies lack an open standard to make the gathered data available for other processes. On the other hand, several studies discuss data structures for exchanging damage information among different stakeholders. However, those studies do not cover the process of automatic data acquisition and transfer. This study focuses on a framework that incorporates automatic damage data acquisition, transfer, and a damage information model for data exchange. This enables inspectors to use damage data for subsequent analyses and simulations. The proposed framework shows the potentials for a comprehensive damage information model and related (semi-)automatic data acquisition and processing. KW - Building Information Modeling KW - Brücke KW - Inspektion KW - Maschinelles Lernen KW - Bildverarbeitung KW - Building Information Modeling KW - Bridge KW - Inspection KW - Damage Segmentation KW - Machine Learning KW - OA-Publikationsfonds2022 Y1 - 2022 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220314-46059 UR - https://www.mdpi.com/2076-3417/12/6/2772 VL - 2022 IS - volume 12, issue 6, article 2772 SP - 1 EP - 24 PB - MDPI CY - Basel ER - TY - THES A1 - Berhe, Asgedom Haile T1 - Mitigating Risks of Corruption in Construction: A theoretical rationale for BIM adoption in Ethiopia N2 - This PhD thesis sets out to investigate the potentials of Building Information Modeling (BIM) to mitigate risks of corruption in the Ethiopian public construction sector. The wide-ranging capabilities and promises of BIM have led to the strong perception among researchers and practitioners that it is an indispensable technology. Consequently, it has become the frequent subject of science and research. Meanwhile, many countries, especially the developed ones, have committed themselves to applying the technology extensively. Increasing productivity is the most common and frequently cited reason for that. However, both technology developers and adopters are oblivious to the potentials of BIM in addressing critical challenges in the construction sector, such as corruption. This particularly would be significant in developing countries like Ethiopia, where its problems and effects are acute. Studies reveal that bribery and corruption have long pervaded the construction industry worldwide. The complex and fragmented nature of the sector provides an environment for corruption. The Ethiopian construction sector is not immune from this epidemic reality. In fact, it is regarded as one of the most vulnerable sectors owing to varying socio-economic and political factors. Since 2015, Ethiopia has started adopting BIM, yet without clear goals and strategies. As a result, the potential of BIM for combating concrete problems of the sector remains untapped. To this end, this dissertation does pioneering work by showing how collaboration and coordination features of the technology contribute to minimizing the opportunities for corruption. Tracing loopholes, otherwise, would remain complex and ineffective in the traditional documentation processes. Proceeding from this anticipation, this thesis brings up two primary questions: what are areas and risks of corruption in case of the Ethiopian public construction projects; and how could BIM be leveraged to mitigate these risks? To tackle these and other secondary questions, the research employs a mixed-method approach. The selected main research strategies are Survey, Grounded Theory (GT) and Archival Study. First, the author disseminates an online questionnaire among Ethiopian construction engineering professionals to pinpoint areas of vulnerability to corruption. 155 responses are compiled and scrutinized quantitatively. Then, a semi-structured in-depth interview is conducted with 20 senior professionals, primarily to comprehend opportunities for and risks of corruption in those identified highly vulnerable project stages and decision points. At the same time, open interviews (consultations) are held with 14 informants to be aware of state of the construction documentation, BIM and loopholes for corruption in the country. Consequently, these qualitative data are analyzed utilizing the principles of GT, heat/risk mapping and Social Network Analysis (SNA). The risk mapping assists the researcher in the course of prioritizing corruption risks; whilst through SNA, methodically, it is feasible to identify key actors/stakeholders in the corruption venture. Based on the generated research data, the author constructs a [substantive] grounded theory around the elements of corruption in the Ethiopian public construction sector. This theory, later, guides the subsequent strategic proposition of BIM. Finally, 85 public construction related cases are also analyzed systematically to substantiate and confirm previous findings. By ways of these multiple research endeavors that is based, first and foremost, on the triangulation of qualitative and quantitative data analysis, the author conveys a number of key findings. First, estimations, tender document preparation and evaluation, construction material as well as quality control and additional work orders are found to be the most vulnerable stages in the design, tendering and construction phases respectively. Second, middle management personnel of contractors and clients, aided by brokers, play most critical roles in corrupt transactions within the prevalent corruption network. Third, grand corruption persists in the sector, attributed to the fact that top management and higher officials entertain their overriding power, supported by the lack of project audits and accountability. Contrarily, individuals at operation level utilize intentional and unintentional 'errors’ as an opportunity for corruption. In light of these findings, two conceptual BIM-based risk mitigation strategies are prescribed: active and passive automation of project audits; and the monitoring of project information throughout projects’ value chain. These propositions are made in reliance on BIM’s present dimensional capabilities and the promises of Integrated Project Delivery (IPD). Moreover, BIM’s synchronous potentials with other technologies such as Information and Communication Technology (ICT), and Radio Frequency technologies are topics which received a treatment. All these arguments form the basis for the main thesis of this dissertation, that BIM is able to mitigate corruption risks in the Ethiopian public construction sector. The discourse on the skepticisms about BIM that would stem from the complex nature of corruption and strategic as well as technological limitations of BIM is also illuminated and complemented by this work. Thus, the thesis uncovers possible research gaps and lays the foundation for further studies. KW - Building Information Modeling KW - Korruption KW - Risikomanagement KW - Äthiopien KW - Corruption KW - BIM KW - Risk management KW - Construction KW - Ethiopia Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20211007-45175 ER - TY - JOUR A1 - Benz, Alexander A1 - Taraben, Jakob A1 - Lichtenheld, Thomas A1 - Morgenthal, Guido A1 - Völker, Conrad T1 - Thermisch-energetische Gebäudesimulation auf Basis eines Bauwerksinformationsmodells JF - Bauphysik N2 - Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar. Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher. Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products. By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data. KW - Building Information Modeling KW - Energiebedarf KW - Gebäudehülle KW - Schnittstelle KW - Simulation KW - BIM KW - Gebäudesimulation KW - IFC-basierte Gebäudesimulation KW - thermische Gebäudehülle KW - building simulation Y1 - 2018 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20181221-38354 N1 - Copyright 2018 Ernst & Sohn. Dieser Artikel kann für den persönlichen Gebrauch heruntergeladen werden. Andere Verwendungen bedürfen der vorherigen Zustimmung der Autoren und des Verlags Ernst & Sohn. Der folgende Artikel erschien in der Bauphysik 40 (2), 2018 und kann unter folgendem Link abgerufen werden. https://www.ernst-und-sohn.de/app/artikelrecherche/artikel.php?lang=de&ID=38470&utm_source=eus&utm_medium=artikel-db&utm_campaign=Bp_2018_2 IS - 40, Heft 2 SP - 61 EP - 67 ER - TY - JOUR A1 - Benz, Alexander A1 - Taraben, Jakob A1 - Lichtenheld, Thomas A1 - Morgenthal, Guido A1 - Völker, Conrad T1 - Thermisch-energetische Gebäudesimulation auf Basis eines Bauwerksinformationsmodells JF - Bauphysik N2 - Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar. Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher. Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products. By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data. KW - Gebäudehülle KW - Energiebedarf KW - Simulation KW - Schnittstelle KW - Building Information Modeling KW - Gebäudesimulation KW - BIM KW - IFC-basierte Gebäudesimulation KW - thermische Gebäudehülle KW - building simulation Y1 - 2018 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20181102-38190 UR - https://e-pub.uni-weimar.de/opus4/frontdoor/index/index/docId/3835 N1 - Copyright 2018 Ernst & Sohn. Dieser Artikel kann für den persönlichen Gebrauch heruntergeladen werden. Andere Verwendungen bedürfen der vorherigen Zustimmung der Autoren und des Verlags Ernst & Sohn. Der folgende Artikel erschien in der Bauphysik 40 (2), 2018 und kann unter folgendem Link abgerufen werden. https://www.ernst-und-sohn.de/app/artikelrecherche/artikel.php?lang=de&ID=38470&utm_source=eus&utm_medium=artikel-db&utm_campaign=Bp_2018_2. IS - 40, Heft 2 SP - 61 EP - 67 ER -