TY - CHAP A1 - Biltchouk, Irina A1 - Pahl, Peter Jan T1 - Interaction of Data Bases and Graphical Interfaces in Civil Engineering N2 - Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Graphische Benutzeroberfläche KW - Datenbank Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1636 ER - TY - CHAP A1 - El-Rayes, Khaled A1 - Kandil, Amr T1 - Distributed Computing for the Optimization of Large-Scale Construction Projects N2 - Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Verteiltes System KW - Planung KW - Großbaustelle KW - Optimal Planning Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1601 ER - TY - CHAP A1 - Freundt, Martin A1 - Beucke, Karl T1 - A flexible model for scheduling building processes based on graph theory and fuzzy numbers N2 - The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Scheduling KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1587 ER - TY - CHAP A1 - Huhnt, Wolfgang T1 - Modellierung der Prozesse als Basis der Informationssysteme für Bauunternehmen N2 - Die fachlichen Grundlagen der Aufgaben, die in einem Bauunternehmen zu bearbeiten sind, wurden in verschiedenen Disziplinen entwickelt. Maßgeblich waren der Baubetrieb und die Betriebswirtschaftslehre. Die parallele Entwicklung hat jedoch dazu geführt, dass grundlegende Begriff und Verfahren zwischen den Disziplinen nicht aufeinander abgestimmt sind. Die verschiedenen Aufgaben beeinflussen jedoch einander. Innerhalb der jeweiligen Disziplin wurden Informationssysteme entwickelt, mit denen sich die Aufgaben aus der jeweiligen Disziplin bearbeiten lassen. Zur Verbindung der "verschiedenen Welten" existieren zwar ausgewählte Schnittstellen, eine durchgängige verteilte Bearbeitung der verschiedenen Aufgaben wird jedoch noch nicht umfassend unterstützt. Im vorliegenden Beitrag wird ein Vorgehen vorgestellt, auf dessen Grundlage eine verteilte Bearbeitung der fachgebietsübergreifenden Aufgaben erfolgen kann. Das Vorgehen beruht auf der Modellierung der Prozesse sowie der zur Bearbeitung der als Bestandteil der Prozesse spezifizierten Aufgaben benötigten Informationen. Dieses Modell wird auf der Grundlage der Mengenlehre mit einem entsprechenden Werkzeug aufgebaut. Die Spezifikation der Informationen wird genutzt, um Datenbankschemata zu generieren, die Spezifikation der Aufgaben wird genutzt, um Werkzeuge zur Bearbeitung zu identifizieren. Diese Werkzeuge sind in Java als Applets implementiert und können über entsprechende Treiber auf die Datenbanken zugreifen. Das Prozessmodell wird in einem nächsten Schritt erweitert. Personen werden eingeführt. Diesen Personen werden Aufgaben zugewiesen, deren Bearbeitung sie ausführen sollen. Auf der Grundlage des erweiterten Prozessmodells werden die Applets, die eine Person benötigt, auf einer entsprechenden Internet-Seite zusammengestellt. Damit kann projektspezifisch ein Informationssystem zusammengestellt werden, das eine verteilte Bearbeitung der verschiedenartigen Aufgaben unterstützt. KW - Baubetrieb KW - Informationsmanagement KW - Modellierung Y1 - 2000 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5969 ER - TY - CHAP A1 - Huhnt, Wolfgang T1 - Progress Measurement in Planning Processes on the Base of Process Models N2 - This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Prozessmodell KW - Bauablauf Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1664 ER - TY - CHAP A1 - Keller, Martin A1 - Antoniadis, George A1 - Menzel, Karsten T1 - Resource Management for the Construction Industry N2 - The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ... KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Betriebsmittel Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1679 ER - TY - CHAP A1 - Kopyto, Martin A1 - Petersen, Michael A1 - Diaz, Joaquin T1 - Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects N2 - The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1599 ER - TY - CHAP A1 - König, Markus A1 - Klinger, Axel A1 - Berkhahn, Volker T1 - Structural Correctness of Planning Processes in Building Engineering N2 - The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Planungsprozess KW - Konsistenz Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1690 ER - TY - CHAP A1 - Menzel, Karsten A1 - Schach, Reiner A1 - Scherer, Raimar J. T1 - Reorganisationspotentiale im Bauwesen durch Nutzung mobiler Informations- & Kommunikationstechnologien N2 - Die Verfügbarkeit und die sichere Beherrschung moderner und kostengünstiger Informations- und Kommunikationstechnologien gestattet es auch kleinen unternehmerischen Einheiten im Bauwesen sich in betriebsübergreifenden Netzwerken zu organisieren und sich besser in die Wertschöpfungskette am Bau zu integrieren. In sogenannten >Virtuellen Organisationen< (VO) können diese für die Volkswirtschaft wichtigen Unternehmen ihre Wettbewerbsvorteile wie höhere Flexibilität, schnelle Reaktion auf Kundenwünsche und Marktnähe nutzen und somit ihr langfristiges Bestehen in einem liberalen Wettbewerb auf einem erweiterten EU-Markt sichern und ausbauen. Die derzeit existierenden Hindernisse im Informationsfluss zwischen Baustelle und Büro können durch den Einsatz mobiler, funkvernetzter Endgeräte, wie beispielsweise >Smart-Phones<, und einer neu zu gestaltenden Infrastruktur zum Wissensmanagement und zur kontextsensitiven Informationsdarstellung abgebaut werden. Im Rahmen dieser Veröffentlichung werden konzeptionelle Ansätze eines integrierten Informationsmanagements zur Unterstützung von VO, die im Rahmen des BMBF-Projektes >IuK-System Bau< derzeit entwickelt werden, vorgestellt. KW - Baubetrieb KW - Unternehmen / Organisation KW - Internet Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3315 ER - TY - CHAP A1 - Müller, Jens A1 - Kirschke, Heiko A1 - Köcher, Jürgen A1 - Petter, Steffen T1 - Untersuchung und Erarbeitung eines Leitfadens zum Dokumentenmanagement in KMU des Bauwesens N2 - In der heutigen Informationsgesellschaft sind alle Geschäftsprozesse in einem Unternehmen geprägt durch die Verwendung der vorhandenen Informations- und Kommunikationstechnologien. Diese haben zur Folge, dass Unternehmen mit einer wahren Flut an Informationen konfrontiert werden, die von extern und intern in das Unternehmen eingetragen wurden. Die erfolgreiche Beherrschung dieser Informationsflut bildet die Basis für das effektive Arbeiten im Unternehmen. Grundvoraussetzung hierfür ist vor allem ein harmonisches Zusammenspiel zwischen Mensch ↔ Organisation ↔ Technik. Dokumentenmanagementsysteme haben sich zur Aufgabe gemacht, den Anwender bei der technologischen Bewältigung dieser Aufgabenstellung zu unterstützen. Der hier vorgestellte Artikel zeigt die Probleme auf, die während der Umsetzung eines Dokumentenmanagementsystems auftreten können und konzentriert sich dabei besonders auf Kleinen und Mittleren Unternehmen (KMU) im Bauwesen. Charakteristisch für diese ist die Schwäche die eigenen Unternehmensstrukturen betriebswirtschaftlich aufzubereiten, woraus später bei einer technologischen Umsetzung schwerwiegende Probleme resultieren. Genau an diesem Punkt setzt der vorgestellte Artikel an und versucht den Zusammenhang zwischen Organisation und Technik herauszuarbeiten, um darauf aufsetzend einen allgemeingültigen Ansatz für die Umsetzung eines Dokumentenmanagementsystems zu liefern. KW - Baubetrieb KW - Klein- und Mittelbetrieb KW - Dokumentenverwaltungssystem Y1 - 2003 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-3367 ER -