TY - CHAP A1 - Kopyto, Martin A1 - Petersen, Michael A1 - Diaz, Joaquin T1 - Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects N2 - The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Controlling Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1599 ER - TY - CHAP A1 - Zarli, Alain A1 - Storer, Graham A1 - Kazi, Abdul Samad (Sami) T1 - Building a Better Future: Major Results from the ICCI Cluster Project N2 - To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities. KW - Forschung KW - Europa KW - Informationstechnik KW - Baubetrieb Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1994 ER - TY - CHAP A1 - Freundt, Martin A1 - Beucke, Karl T1 - A flexible model for scheduling building processes based on graph theory and fuzzy numbers N2 - The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions. KW - Baubetrieb KW - Computerunterstütztes Verfahren KW - Scheduling KW - Fuzzy-Logik Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1587 ER - TY - CHAP A1 - Hollermann, Sebastian A1 - Melzner, Jürgen ED - Hollermann, Sebastian ED - Melzner, Jürgen T1 - 24. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik N2 - Tagungsband - 24. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik 10.-12.Juli 2013 Weimar T3 - Schriften der Professur Baubetrieb und Bauverfahren - 26 KW - Baubetrieb KW - Bauwirtschaft KW - Bauverfahren Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20130523-19371 CY - Weimar ER -