TY - CHAP A1 - Miles, John A1 - Joita, Liviu A1 - Burnap, Peter T1 - Collaborative Engineering: Virtual Teams in a Grid Environment Supporting Consortia in the Construction Industry N2 - In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI). KW - Ingenieurbau KW - Verteiltes System KW - Planungsprozess KW - Modellierung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1362 ER - TY - CHAP A1 - Cheng, Jinxing A1 - Lau, Gloria A1 - Law, Kincho T1 - A simulation access language and framework for project management applications N2 - As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework. KW - Hochschulbildung KW - Entscheidungsunterstützung KW - Projektmanagement Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-1567 ER - TY - THES A1 - Fauth, Judith T1 - A process-oriented decision model for determining the permitability of construction projects N2 - In recent years, the discussion of digitalization has arrived in the media, at conferences, and in committees of the construction and real estate industry. While some areas are producing innovations and some contributors can be described as pioneers, other topics still show deficits with regard to digital transformation. The building permit process can also be counted in this category. Regardless of how architects and engineers in planning offices rely on innovative methods, building documents have so far remained in paper form in too many cases, or are printed out after electronic submission to the authority. Existing resources – for example in the form of a building information model, which could provide support in the building permit process – are not being taken advantage of. In order to use digital tools to support decision-making by the building permit authorities, it is necessary to understand the current situation and to question conditions before pursuing the overall automation of internal authority processes as the sole solution. With a substantive-organizational consideration of the relevant areas that influence building permit determination, an improvement of the building permit procedure within authorities is proposed. Complex areas – such as legal situations, the use of technology, as well as the subjective alternative action – are determined and structured. With the development of a model for the determination of building permitability, both an understanding of influencing factors is conveyed and an increase in transparency for all parties involved is created. In addition to an international literature review, an empirical study served as the research method. The empirical study was conducted in the form of qualitative expert interviews in order to determine the current state in the field of building permit procedures. The collected data material was processed and subsequently subjected to a software-supported content analysis. The results were processed, in combination with findings from the literature review, in various analyses to form the basis for a proposed model. The result of the study is a decision model that closes the gap between the current processes within the building authorities and an overall automation of the building permit review process. The model offers support to examiners and applicants in determining building permit eligibility, through its process-oriented structuring of decision-relevant facts. The theoretical model could be transferred into practice in the form of a web application. KW - Baugenehmigung KW - Entscheidungsmodell KW - Bauantrag KW - Prozessmanagement KW - Projektmanagement KW - Building permit KW - Building application KW - Decision-making KW - Process management KW - Project management Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20220309-46020 UR - https://e-pub.uni-weimar.de/opus4/frontdoor/index/index/docId/4509 N1 - This work is a translation of the original dissertation (German language) which is accessible at: https://doi.org/10.25643/bauhaus-universitaet.4509 and deposited here as URL link. ER -