@article{TakagiTaniKawamura2004, author = {Takagi, Kousuke and Tani, Akinori and Kawamura, Hiroshi}, title = {Research on Intelligent Fuzzy Optimal Active and Hybrid Control Systems of Building Structures - Verification of Optimization Method on Switching Rules of Control Forces}, doi = {10.25643/bauhaus-universitaet.223}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2238}, year = {2004}, abstract = {Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.}, subject = {Mehragentensystem}, language = {en} } @article{WillenbacherHuebler2004, author = {Willenbacher, Heiko and H{\"u}bler, Reinhard}, title = {Intelligent Link-Management for the Support of Integration in Building Life Cycle}, doi = {10.25643/bauhaus-universitaet.222}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2223}, year = {2004}, abstract = {The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its "intelligent" link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants.}, subject = {Mehragentensystem}, language = {en} } @inproceedings{MilesCenTaylor2004, author = {Miles, John and Cen, Mei and Taylor, Mark}, title = {Linking Sketching and Constraint Checking for Early Conceptual Design}, doi = {10.25643/bauhaus-universitaet.1548}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1547}, year = {2004}, abstract = {At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients.}, subject = {Konzipieren }, language = {en} } @article{MotawaAnumbaElHamalawi2004, author = {Motawa, Ibrahim and Anumba, Chimay and El-Hamalawi, A.}, title = {Development of a Fuzzy System for Change Prediction in Construction Projects}, doi = {10.25643/bauhaus-universitaet.218}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2180}, year = {2004}, abstract = {Change management has been the focus of different IT systems. These IT systems were developed to represent design information, record design rationale, facilitate design coordination and changes. They are largely based on managing reactive changes, particularly design changes, in which changes are recorded and then propagated to the relevant project members. However, proactive changes are hardly dealt with in IT systems. Proactive changes require estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. This is a major outcome of the case studies carried out as part of this research. Therefore, the proposed model considers that incomplete knowledge and certain project characteristics are always behind change causes. For proactive changes, predicting a change event is the main task for modelling. The prediction model should strive to integrate these main elements: 1) project characteristics that lead to change 2) causes of change, 3) the likelihood of change occurrence, and 4) the change consequences. It should also define the dependency relationships between these elements. However, limited data (documented) are only available from previous projects for change cases and many of the above elements can only be expressed in linguistic terms. This means that the model will simulate the uncertainty and subjectivity associated with these sets of elements. Therefore, a fuzzy model is proposed in this research to capture these elements. The model analyses the impact of each set of elements on the other by assigning fuzzy values for these elements that express the uncertainty and subjectivity of their impact. The main aim is to predict change events and evaluate change effects on project parameters. The fuzzy model described above was developed in an IT system for operational purposes and was designed as a Java package of components with their supporting classes, beans, and files. This paper describes the development and the architecture of the proposed IT system to achieve these requirements. The system is intended to help project teams in dealing with change causes and then the change consequences in construction projects.}, subject = {Mehragentensystem}, language = {en} } @article{FoorgberMueller1997, author = {Foorgber, U. and M{\"u}ller, Christian}, title = {A Planning Process Model for Computer Supported Cooperative Work in Building Construction}, doi = {10.25643/bauhaus-universitaet.492}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4922}, year = {1997}, abstract = {Increasing complexity of today's buildings requires a high level of integration in the planning process. Common planning strategies, where individual project partners cooperate mainly to exchange results, are not suitable to jointly develop project goals and objectives. Integrated planning, a more holistic approach to deal with complex problems, is based on a high degree of communication amoung team members and leads to a goal oriented cooperation. Current approaches in the reasearch area of Computer Supported Cooperative Work (CSCW) poorly meet the requirements in planning. A planning process model, based on the principles of integrated planning will be introduced, aimed to provide the background for the implementation of a CSCW-platform.}, subject = {Bauwesen}, language = {en} } @inproceedings{MilesJoitaBurnap2004, author = {Miles, John and Joita, Liviu and Burnap, Peter}, title = {Collaborative Engineering: Virtual Teams in a Grid Environment Supporting Consortia in the Construction Industry}, doi = {10.25643/bauhaus-universitaet.136}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1362}, year = {2004}, abstract = {In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI).}, subject = {Ingenieurbau}, language = {en} } @inproceedings{Palm2004, author = {Palm, Johan}, title = {Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment}, doi = {10.25643/bauhaus-universitaet.162}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1625}, year = {2004}, abstract = {The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating 'islands of information'. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.}, subject = {Baubetrieb}, language = {en} } @inproceedings{Olivier2004, author = {Olivier, A. H.}, title = {An application-centred framework for distributed engineering applications}, doi = {10.25643/bauhaus-universitaet.135}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1353}, year = {2004}, abstract = {The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality.}, subject = {Ingenieurbau}, language = {en} } @inproceedings{ChristovPetrova1997, author = {Christov, Christo T. and Petrova, Lyllia B.}, title = {Computer-Aided Static Analysis of Complex Prismatic Orthotropic Shell Structures by the Analytical Finite Strip Method}, doi = {10.25643/bauhaus-universitaet.435}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4358}, year = {1997}, abstract = {The paper describes a development of the analytical finite strip method (FSM) in displacements for linear elastic static analysis of simply supported at their transverse ends complex orthotropic prismatic shell structures with arbitrary open or closed deformable contour of the cross-section under general external loads. A number of bridge top structures, some roof structures and others are related to the studied class. By longitudinal sections the prismatic thin-walled structure is discretized to a limited number of plane straight strips which are connected continuously at their longitudinal ends to linear joints. As basic unknowns are assumed the three displacements of points from the joint lines and the rotation to these lines. In longitudinal direction of the strips the unknown quantities and external loads are presented by single Fourier series. In transverse direction of each strips the unknown values are expressed by hyperbolic functions presenting an exact solution of the corresponding differential equations of the plane straight strip. The basic equations and relations for the membrane state, for the bending state and for the total state of the finite strip are obtained. The rigidity matrix of the strip in the local and global co-ordinate systems is derived. The basic relations of the structure are given and the general stages of the analytical FSM are traced. For long structures FSM is more efficient than the classic finite element method (FEM), since the problem dimension is reduced by one and the number of unknowns decreases. In comparison with the semi-analytical FSM, the analytical FSM leads to a practically precise solution, especially for wider strips, and provides compatibility of the displacements and internal forces along the longitudinal linear joints.}, subject = {Tragwerk}, language = {en} } @article{YabukiYoshimura2004, author = {Yabuki, Nobuyoshi and Yoshimura, Yutaka}, title = {An Evaluation System for Steel Structures of Hydroelectric Power Stations based on Fault Tree Analysis and Performance Maps}, doi = {10.25643/bauhaus-universitaet.256}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2564}, year = {2004}, abstract = {This paper presents an evaluation system for steel structures of hydroelectric power stations, including hydraulic gates and penstocks, based on Fault Tree Analyasis (FTA) and performance maps. This system consists of fault tree diagrams of FTA, performance maps, design and analysis systems, and engineerin databases. These four modules are integrated by appropriate hyperlinks so that the user of this system can use it easily and seamlessly. A well developed system was applied to some illustrative example cases, and they showed that the developed methodology and system worked well and the users found the system useful and effective for their maintenance tasks at powerstations.}, subject = {Wissensmanagement}, language = {en} }