@misc{Theiler, author = {Theiler, Michael}, title = {Documentation and conceptual development of software components for the execution of geometric Boolean set operations on the basis of Java3D}, doi = {10.25643/bauhaus-universitaet.1943}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20130603-19430}, pages = {50}, abstract = {Complex buildings and other structures are cumulatively planned with software that supports the export of building information in the STEP-format on the basis of the IFC (Industry Foundation Classes). Because of the availability of this interface, it is possible to use the data of a building for further processing. Within the IFC, several geometrical models for the visualization of building elements are provided. Among others, geometric Boolean set operations are needed to "subtract" openings from building elements (e.g. for windows or doors) - CSG (Constructive Solid Geometry). Therefore, software components based on the algorithms [Laidlaw86] and [Hubbard90] were developed at the professorship Informatik im Bauwesen that support these functionalities on the basis of Java3D. However, it turned out in praxis, that these components are numerically instable and that there is no acceptable robustness or tolerance of errors. This is caused by mistakes in the implementation (bugs) as well as the insufficient handling of numerical inaccuracies. Further, a verification and, where applicable, a correction of qualitative substandard initial data is missing. Prior to this student research project, the implementation of a self-contained application for a visual error control was initiated. This tool visualizes several program steps and their corresponding data. With use of this tool, the implemented algorithms can be analyzed in detail. The papers [Laidlaw86] and [Hubbard90] are unsatisfactory describing some essential steps of the algorithm as well as implementation details to execute Boolean set operations on the basis of a B-rep (Boundary Representation) model. Hence, the algorithm should be documented comprehensible with the help of figures and pseudo code. Moreover, problems within the existing implementation shall be identified and possible solution strategies shall be provided.}, subject = {Boolean Operations}, language = {en} } @misc{GarischKutznerOehleretal., author = {Garisch, Mathias and Kutzner, Eva and Oehler, Vanessa and Patzer, Nicole and Schmeing, Carolin}, title = {Analyse von Terminpl{\"a}nen}, doi = {10.25643/bauhaus-universitaet.2139}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20140317-21392}, pages = {61}, abstract = {Das Bachelorprojekt „Analyse von Terminpl{\"a}nen" besch{\"a}ftigt sich mit der Analyse der Abh{\"a}ngigkeiten zwischen den unterschiedlichen Vorg{\"a}ngen des Bauablaufs. Die Problematik in der Terminplanerstellung liegt darin, dass ein Terminplan nicht alle Hintergrundinformationen abbildet und es daher zu Projektverz{\"o}gerungen und Absprachefehlern kommen kann. Dieses Bachelorprojekt macht Gebrauch von bereits aufbereiteten Informationen zur genannten Problematik in Form eines vorangegangen Bachelorprojekts und eines Masterprojekts, sowie einer Umfrage des Instituts f{\"u}r Bauwirtschaft der Universit{\"a}t Kassel. In diesem Projekt werden 50 neue und 100 bereits existierende Terminpl{\"a}ne von diversen Unternehmen aus ganz Deutschland analysiert und ausgewertet. Die Analyse der Terminpl{\"a}ne basiert auf gef{\"u}hrten Experteninterviews. Das Interview ber{\"u}cksichtigt Faktoren wie zum Beispiel Darstellungsformen, Detaillierungsgrade, Abh{\"a}ngigkeiten, Vorgangsdauern oder Planungsgrundlagen. Durch die Befragung von m{\"o}glichst vielen Firmen konnte festgestellt werden, dass jeder Terminplanentwickler eine Vorgehensweise entwickelt, nach welcher er arbeitet. Außerdem ist in den Gespr{\"a}chen deutlich geworden, dass das Theorie- Praxis-Gef{\"a}lle sehr groß ist. Das heißt, dass theoretische Modelle aus der Ausbildung an beispielsweise Hochschulen, in der Praxis heutzutage wenig angewandt werden. Nach der Analyse der Terminpl{\"a}ne und Auswertung der Interviews, werden die Daten in eine vom vorangehenden Masterprojekt erstellte Excel-Tabelle eingepflegt. Die vorhandenen Informationen werden dann anhand verschiedenster Diagramme verglichen und ausgewertet.}, subject = {Analyse}, language = {de} }