@article{BargstaedtBlicklingKath2004, author = {Bargst{\"a}dt, Hans-Joachim and Blickling, Arno and Kath, Thilo}, title = {Optimierung der Planung von Baustelleneinrichtungen mit 3-D-Technologien}, series = {Hoch- und Tiefbau 1/2-2004, S. 24-27}, journal = {Hoch- und Tiefbau 1/2-2004, S. 24-27}, doi = {10.25643/bauhaus-universitaet.559}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-5599}, year = {2004}, abstract = {Der Einsatz von CAD-Applikationen hat die Planungsarbeit im Bauwesen entscheidend ver{\"a}ndert. In der Entwurfsplanung sind die {\"A}nderungen bereits deutlich erkennbar. Seit der Anwendung von dreidimensionalen Planungswerkzeugen kann der Bauherr das Bauwerk in seiner virtuellen Gesamtheit am Computer betrachten und bewerten. Dies bietet viele Vorteile. So ist der Planer gezwungen alle wesentlichen Details a priori exakt zu planen, wodurch viele Fehler vermieden werden k{\"o}nnen. Dies bietet insbesondere f{\"u}r Planungen in Baubetrieben, z.B. im Rahmen der Arbeitsvorbereitung, neue Einsatzm{\"o}glichkeiten.}, subject = {Weimar / Bauhaus-Universit{\"a}t / Professur Baubetrieb und Bauverfahren}, language = {de} } @book{BargstaedtRoebenack2000, author = {Bargst{\"a}dt, Hans-Joachim and R{\"o}benack, Karl-Dieter}, title = {45 Jahre Baubetrieb und Bauverfahren in Weimar}, isbn = {3-86068-126-5}, doi = {10.25643/bauhaus-universitaet.477}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4774}, year = {2000}, abstract = {Jubil{\"a}umsbrosch{\"u}re zum Tag des Baubetriebs >Prozesssteuerung-Projektleitung-Dienstleistung< am Freitag, dem 7. Juli 2000 in Weimar. Geleitwort des Rektors der Bauhaus-Universit{\"a}t Weimar 45 Jahre technologische Lehre und Forschung in Weimar Bauen im Jahr 2020 - Wohin ver{\"a}ndert sich Baubetrieb? Statistische {\"U}bersichten}, subject = {Bautechnik}, language = {de} } @misc{BargstaedtSteinmetzger2008, author = {Bargst{\"a}dt, Hans-Joachim and Steinmetzger, Rolf}, title = {Grundlagen des Baubetriebswesens : Skriptum zur Vorlesung}, doi = {10.25643/bauhaus-universitaet.1365}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20081124-14485}, year = {2008}, abstract = {Es geh{\"o}rt zur Tradition der Professur Baubetrieb und Bauverfahren, den Studenten ausf{\"u}hrliche Lehrunterlagen in die Hand zu geben, mit deren Hilfe sie sich in dem umfassenden Lehrgebiet orientieren und in der Vorlesung konzentrierter dem Verst{\"a}ndnis des Stoffes widmen k{\"o}nnen. Diese Brosch{\"u}re ist vor allem Lehrmaterial, das kosteng{\"u}nstig der Rationalisierung des Lehrbetriebes im universit{\"a}ren Bachelorstudium dienen soll. Deshalb waren typografische Kompromisse zugunsten der Wirtschaftlichkeit unausweichlich. Die Ausarbeitung folgt der Logik des zu vermittelnden Wissens, ist aber nicht streng mit Vorlesungsprogramm und -inhalten verkn{\"u}pft. Einer kurzen Einf{\"u}hrung in das Fach „Baubetriebswesen" folgen die produktionstechnischen Grundlagen anhand der Kernprozesse der Bauproduktion: Erdbau, Betonbau und Montagebau. Auf dieser Basis werden auch die Grundlagen der Baustelleneinrichtung im n{\"a}chsten Kapitel verst{\"a}ndlich. Im Teil „Baubetrieb" wird schließlich gezeigt, wie die produktionstechnischen Prozesse geordnet, geplant, vertraglich gebunden, in der Ausf{\"u}hrung {\"u}berwacht und abgerechnet werden. Die in allen Kapiteln relevanten personengebundenen Faktoren runden schließlich mit arbeitswissenschaftlichen und arbeitsschutztechnischen Grundlagen diese Einf{\"u}hrung in das Baubetriebswesen ab.}, subject = {Baubetrieb}, language = {de} } @inproceedings{BargstaedtSteinmetzgerIllertetal.2007, author = {Bargst{\"a}dt, Hans-Joachim and Steinmetzger, Rolf and Illert, Stephan and Steinberg, Kerstin and Geyer, Annett and Seifert, Wolfgang and Schul, Sebastian and Klingsporn, Karin}, title = {5. Fachtagung "Sicherheit auf Baustellen": Aus Unf{\"a}llen und Berufskrankheiten lernen - gesund arbeiten bis zur Rente}, organization = {Professur Baubetrieb und Bauverfahren}, doi = {10.25643/bauhaus-universitaet.805}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8055}, year = {2007}, abstract = {Die aktuelle demografische Entwicklung bedingt offensichtlich auch Arbeiten in rauer Umgebung bis zur Rente mit 67, auch auf dem Bau. Das Thema liegt scheinbar nur am Rande des Baubetriebswesens. Doch obwohl es sozialpolitisch determiniert ist, hat es sehr konkret mit Gesundheitsschutz, Arbeitsschutz und Arbeitsgestaltung zu tun. Die f{\"u}nfte Fachtagung 'Sicherheit auf Baustellen' stellt sich der Diskussion, wie das Rentenalter gesund erreichbar ist, was alle am Arbeitsschutz Beteiligten schon heute und auch in Zukunft daf{\"u}r tun k{\"o}nnen, und hinterfragt kritisch, wie realistisch diese pauschale Forderung nach Arbeit bis 67 ist. Forderungen nach schlankeren Strukturen im Staat und das Streben nach Deregulierung haben auch zu Ver{\"a}nderungen in der Arbeitsschutzverwaltung des Freistaates Th{\"u}ringen gef{\"u}hrt, {\"u}ber die das Forum informiert.}, subject = {Bev{\"o}lkerungsentwicklung}, language = {de} } @inproceedings{Baron2002, author = {Baron, Renigard}, title = {Bauen mit dem europ{\"a}ischen und nationalen Vergaberecht}, doi = {10.25643/bauhaus-universitaet.708}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7082}, year = {2002}, abstract = {Mit der Vergabeverordnung und den neuen Verdingungsordnungen ist zun{\"a}chst einmal das europ{\"a}ische Vergaberecht in nationales Vergaberecht umgesetzt. Dennoch wirft das neue Vergaberecht Fragen auf, die voraussichtlich gerichtlich entschieden werden. Es werden die Rechtsgrundlagen f{\"u}r das Bauen mit dem europ{\"a}ischen und nationalen Vergaberecht dargestellt. Wesentliche Inhalte des Gesetzes gegen Wettbewerbsbeschr{\"a}nkungen (GWB) und Vergabeverfahren nach GWB, Fragen des Rechtsschutzes werden behandelt.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Bauch2006, author = {Bauch, Ullrich}, title = {Transparenz im {\"A}nderungsmanagement - ein Vorteil f{\"u}r alle Vertragspartner?}, doi = {10.25643/bauhaus-universitaet.846}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8460}, year = {2006}, subject = {Weimar / Bauhaus-Universit{\"a}t / Professur Baubetrieb und Bauverfahren}, language = {de} } @inproceedings{Beyer2004, author = {Beyer, Hartmut}, title = {Sondervorschl{\"a}ge und Alternativen mit allen Konsequenzen}, doi = {10.25643/bauhaus-universitaet.720}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7207}, year = {2004}, abstract = {Der Verfasser begr{\"u}ndet zun{\"a}chst die aktive Erarbeitung von Sondervorschl{\"a}gen und Alternativen. Im zweiten Abschnitt erfolgt die inhaltliche Strukturierung der Nebenangebote. Im Folgenden werden die Probleme beim Durchsetzen der Sondervorschl{\"a}ge bei der {\"o}ffentlichen Hand und privaten Auftraggebern und als Alternative dazu das STRABAG teamconcept beschrieben. Im letzten Bereich wird die Verantwortung des Bauunternehmens unterstrichen und ein positives Res{\"u}mee gezogen.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{BeyerIstelKunze2001, author = {Beyer, Manfred and Istel, Alfred and Kunze, Hermann}, title = {Das HDW-System der Genaufertigung: Beherrschung der Schweißschrumpfungen - ein wesentlicher Faktor f{\"u}r Wirtschaftlichkeit und Qualit{\"a}t}, doi = {10.25643/bauhaus-universitaet.402}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4023}, year = {2001}, abstract = {Die Genaufertigung von Schweißkonstruktionen ist ein wichtiger Wettbewerbsfaktor in der Werftindustrie. In diesem Beitrag werden Ziele, Werkzeuge, Technologie und Meßtechnik der Genaufertigung erl{\"a}utert.}, subject = {Schweißen}, language = {de} } @inproceedings{Blickling2003, author = {Blickling, Arno}, title = {Die Verwendung von virtuellen 3D-Modellen bei der SiGeKo-Planung auf Baustellen}, doi = {10.25643/bauhaus-universitaet.476}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4763}, year = {2003}, abstract = {In vorliegender Arbeit wird beispielhaft die M{\"o}glichkeit der Integration der Arbeitssicherheit in das 4D-Modell (virtueller Ablaufplan des 3D-Modells) eines Bauwerkes analysiert und visualisiert. Dabei wurde die Sicherung eines Treppenaufgangs als Arbeitsposition des SiGeKo-Planes in den virtuellen Ablaufplan des 3D-Modells {\"u}bernommen. Zur Erleichterung des Visualisierungsaufwandes werden ebenso Technologien untersucht, die den Zugriff auf 3D-Bibliotheken erm{\"o}glichen, die entsprechende Werkzeuge des Arbeitsschutzes f{\"u}r den SiGeKo-Planer vorhalten.}, subject = {Arbeitsschutz}, language = {de} } @phdthesis{Blickling2006, author = {Blickling, Arno}, title = {Spezifikation des Bau-Solls durch interaktive Modellierung auf virtuellen Baustellen}, doi = {10.25643/bauhaus-universitaet.790}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20061105-8311}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2006}, abstract = {Heutige Methoden zur Soll-Spezifikation von Bauleistungen (Kostenermittlung und zeitliche Ablaufplanung) gehen von einer abstrahierten und vereinfachten Betrachtung der Zusammenh{\"a}nge bei Bauprojekten aus. Leistungsverzeichnisse, Kostenermittlungen und Bauzeitpl{\"a}ne orientieren sich nur indirekt an der Geometrie des Bauwerks und der Baustelle. Die dabei verwendeten Medien wie Papier, 2D-Dateien, digitale Leistungsbeschreibungen oder 3D-Darstellungen lassen die Suche nach Informationen auf der Baustelle zu einem zeitaufw{\"a}ndigen und in Anbetracht existierender Medientechnologien ineffizienten Prozess werden. Interaktive virtuelle Umgebungen erlauben die Aufl{\"o}sung starrer Zusammenh{\"a}nge durch interaktive Eingriffe des Anwenders und visualisieren komplexe bauproduktionstechnische Vorg{\"a}nge. Das Konzept der visuellen interaktiven Simulation der Bauproduktion sieht vor, die Soll-Spezifikation anhand eines interaktiven 3D-Modells zu entwickeln, um r{\"a}umliche Ver{\"a}nderungen und parallele Prozesse auf der virtuellen Baustelle im Rahmen der Entscheidungsfindung zum Bauablauf besser ber{\"u}cksichtigen zu k{\"o}nnen. Verlangt man einen hohen Grad an Interaktivit{\"a}t mit dem 3D-Modell, dann bieten sich Computerspieltechnologien sehr gut zu Verifikationszwecken an. Die visuelle interaktive Simulation der Bauproduktion ist damit als eine 3D-modellbasierte Methode der Prozessmodellierung zu verstehen, die Entscheidungen als Input ben{\"o}tigt und die Kostenermittlung sowie die zeitliche Ablaufplanung als Output liefert.}, subject = {Virtuelle Realit{\"a}t}, language = {de} } @article{Both2006, author = {Both, Petra von}, title = {Integration von Informationsprozessen auf der Basis von Nemetschek Technologien}, doi = {10.25643/bauhaus-universitaet.851}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8511}, year = {2006}, subject = {Weimar / Bauhaus-Universit{\"a}t / Professur Baubetrieb und Bauverfahren}, language = {de} } @inproceedings{Breitenbuecher2002, author = {Breitenb{\"u}cher, Rolf}, title = {Selbstverdichtender Beton in der Praxis}, doi = {10.25643/bauhaus-universitaet.711}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7114}, year = {2002}, abstract = {Selbstverdichtender Beton hat das Potenzial, in großer Breite in den Betonbau einzufließen. Seine besonderen Eigenschaften k{\"o}nnen vor allem einen zielsichereren und robusteren Einbau des Betons in das Bauwerk erm{\"o}glichen und damit die Qualit{\"a}t erheblich verbessern. Voraussetzung f{\"u}r eine erfolgreiche Umsetzung ist aber auch eine entsprechende Erfahrung und Sorgfalt beim Umgang mit diesem neuen Baustoff, sei es bei der Herstellung im Transportbetonwerk oder bei der Verarbeitung auf der Baustelle. Der Verfasser gibt einen {\"U}berblick {\"u}ber diese neue Technologie und schildert Versuchsergebnisse zum Einbau selbstverdichtenden Betons.}, subject = {Baubetriebslehre}, language = {de} } @masterthesis{Boewe, type = {Bachelor Thesis}, author = {B{\"o}we, Annelie}, title = {Entscheidungsfindung im Herstellungsprozess von Br{\"u}ckenkappen}, doi = {10.25643/bauhaus-universitaet.1644}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20120425-16447}, school = {Bauhaus-Universit{\"a}t Weimar}, abstract = {Im Rahmen dieser Arbeit wurde die Entscheidungsfindung im Herstellungsprozess von Br{\"u}ckenkappen untersucht. Es stellte sich heraus, dass die Fuzzy-Methode ein geeignetes Werkzeug sein k{\"o}nnte, die Teilprozesse auf die M{\"o}glichkeit ihrer Parallelisierung hin zu untersuchen. Um diese Theorie zu testen, wurde auf den Grundlagen von Arbeiten der Professur Baubetrieb und Bauverfahren der Prozess n{\"a}her analysiert und unterst{\"u}tzend durch eigene Recherchen ein UML-Diagramm erstellt, welches als Aktivit{\"a}tsdiagramm ausgebildet wurde. Aufbauend auf diesem Ablauf und den gewonnenen Kenntnissen zur Herstellung einer Br{\"u}ckenkappe, konnten die einzelnen Prozesse zu Teilprozessen, sogenannten Bausteinen, zusammengefasst werden. Diese Bausteine sind entstanden, um die Simulation m{\"o}glich zu machen, indem der Ablauf weniger komplex wird und nur die Prozesse zu beurteilen sind, die beeinflusst bzw. in ihrer Reihenfolge bis zu einem gewissen Grad variabel sind. Eine erleichterte Interaktion mit den Bausteinen und deren {\"U}berf{\"u}hrung in ein Simulationsprogramm wurde {\"u}ber Templates realisiert. So besitzt jeder Baustein eine einheitliche Struktur. Unter anderem beinhalten die Bausteine die jeweiligen Ressourcen und Parameter, sowie die Abh{\"a}ngigkeiten der Prozesse untereinander und die zugeh{\"o}rige Priorit{\"a}t. Zur Entscheidungsfindung wurde die Fuzzylogik herangezogen und die Problemstellung der Parallelisierung zum Ziel gesetzt. Die Realisierung wurde {\"u}ber einen Entscheidungsbaum und das daraus resultierende Regelwerk erreicht. Somit ließen sich, ausgehend von einem festgelegten Prozess und durch die Fuzzifizierung der Eingangsparameter Priorit{\"a}t, Prozessdauer und Verf{\"u}gbarkeit der Ressourcen und Arbeitskr{\"a}fte, verschiedene Pfade identifizieren, allerdings nur in Verbindung mit den vorher analysierten Abh{\"a}ngigkeiten. F{\"u}r jeden der Eingangsparameter wurden so Fuzzy-Sets erstellt. {\"U}ber den Entscheidungsbaum, welcher mit den linguistischen Variablen versehen wurde, konnte {\"u}ber sogenannte "und" - Verkn{\"u}pfungen das Regelwerk aufgestellt werden. Das gek{\"u}rzte Regelwerk in dieser Arbeit beinhaltet grunds{\"a}tzlich nur die Regeln, die auch zu einer wirklichen Entscheidung f{\"u}hren. Daraus folgt, dass es m{\"o}glich ist mittels der Fuzzy-Methode eine Entscheidung dar{\"u}ber zu f{\"a}llen, ob zwei Prozesse zu parallelisieren sind oder nicht und aufgetretene Verz{\"o}gerungen wieder eingeholt werden k{\"o}nnen.}, subject = {Entscheidungsfindung}, language = {de} } @inproceedings{Buecker2000, author = {B{\"u}cker, Joachim}, title = {Qualit{\"a}tssicherung durch baubegleitende Pr{\"u}fung}, doi = {10.25643/bauhaus-universitaet.704}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7046}, year = {2000}, abstract = {Darstellung der aktuellen Situation der Qualit{\"a}tssicherung im Bauwesen, der Aufgaben und der Vorgehensweise des T{\"U}V Bautechnik bei der Qualit{\"a}ts{\"u}berwachung am Bau.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Conrad1999, author = {Conrad, Gabriele}, title = {Die Baustellenverordnung - praktische Erfahrungen bei der Anwendung}, doi = {10.25643/bauhaus-universitaet.835}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8351}, year = {1999}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{Damm2003, author = {Damm, Rainer}, title = {Chancen f{\"u}r den pr{\"a}ventiven Arbeitsschutz durch Facility Management}, doi = {10.25643/bauhaus-universitaet.419}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4195}, year = {2003}, abstract = {An einem Beispiel wird belegt, dass unzureichende Beachtung von sicherheitsrelevanten Aspekten in der Phase der Projektplanung nachteilige Auswirkungen f{\"u}r die Bewirtschaftung eines Objektes hat. Einziger praktikabler Ausweg f{\"u}r eine dauerhafte wirtschaftliche L{\"o}sung komplette Reinigung der Glasfassade, die den {\"u}berwiegenden Teil der Gesamtfassadenfl{\"a}che ausmacht, bleibt in diesem Beispiel, unter Abw{\"a}gung aller Umst{\"a}nde und unter Ber{\"u}cksichtigung der einschl{\"a}gigen arbeitsschutzrechtlichen Bestimmungen, das nachtr{\"a}gliche Installieren von so genannten Flachdachauslegern in Verbindung mit einer Arbeitsb{\"u}hne, die der Beschaffenheit des Daches, der unterschiedlichen Zahl von Geschossebenen und der unmittelbaren N{\"a}he der Gleisanlage der Straßenbahn Rechnung tr{\"a}gt.}, subject = {Arbeitsschutz}, language = {de} } @phdthesis{Dang, author = {Dang, Trang}, title = {Automated Detailing of 4D Schedules}, doi = {10.25643/bauhaus-universitaet.2310}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20141006-23103}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {120}, abstract = {The increasing success of BIM (Building Information Model) and the emergence of its implementation in 3D construction models have paved a way for improving scheduling process. The recent research on application of BIM in scheduling has focused on quantity take-off, duration estimation for individual trades, schedule visualization, and clash detection. Several experiments indicated that the lack of detailed planning causes about 30\% non-productive time and stacking of trades. However, detailed planning still has not been implemented in practice despite receiving a lot of interest from researchers. The reason is associated with the huge amount and complexity of input data. In order to create a detailed planning, it is time consuming to manually decompose activities, collect and calculate the detailed information in relevant. Moreover, the coordination of detailed activities requires much effort for dealing with their complex constraints. This dissertation aims to support the generation of detailed schedules from a rough schedule. It proposes a model for automated detailing of 4D schedules by integrating BIM, simulation and Pareto-based optimization.}, subject = {Simulation}, language = {en} } @inproceedings{Dannecker2000, author = {Dannecker, Lutz}, title = {Bausch{\"a}den im Wohn- und Gewerbebau - eine Th{\"u}ringer Bestandsaufnahme und Ans{\"a}tze zur Probleml{\"o}sung}, doi = {10.25643/bauhaus-universitaet.705}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7057}, year = {2000}, abstract = {Der Verfasser gibt einen {\"U}berblick {\"u}ber die aktuelle Bauschadensforschung an Wohn-, Gewerbe- und Industriebauten (Schadensanf{\"a}lligkeit, zeitliche Verteilung von Bausch{\"a}den, Verteiliung der Verursachung und des Verschuldens, Schadensintensit{\"a}t in Abh{\"a}ngigkeit von den Vertragsstrukturen, M{\"a}ngel- und Schadensbeseitigungskosten). Es werden Schlussfolgerungen auf notwendige Maßnahmen zur Reduzierung der Schadensintensit{\"a}t gezogen.}, subject = {Baubetriebslehre}, language = {de} } @misc{Drude2005, type = {Master Thesis}, author = {Drude, Erik}, title = {Studie zu bautechnischen Voraussetzungen f{\"u}r automatisierte Fertigteilmontagen am Beispiel von Stahlbeton-Skelettbauwerken}, doi = {10.25643/bauhaus-universitaet.672}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-6725}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2005}, abstract = {In Deutschland hat sich das vollautomatische Bauen bisher vergleichsweise bescheiden entwickelt. Ein hoher Automatisierungsgrad ist dagegen seit Jahren bei den station{\"a}ren Mischanlagen von Baustoffen, wie Beton und Asphalt sowie in der Serienfertigung standardisierter Betonwaren zu finden. Jedoch fehlen in Deutschland die Voraussetzungen, um grundlegend neu konzipierte, flexibel automatisierte oder roboterisierte Maschinen und Systeme zu entwickeln und einzusetzen. Zur Schaffung dieser Voraussetzungen soll die vorliegende Arbeit einen Beitrag leisten. Sie betrachtet ausschließlich die Skelettbauweise. Diese stellt ein Teilgebiet des Betonfertigteilbaus dar. Da eine Automatisierungsl{\"o}sung grunds{\"a}tzlich erst bei großen Objekten mit einer hohen Wiederholungsrate der Prozesse und Elemente wirtschaftlich ist, wird die Montage eines Mehrzweckkomplexes untersucht. Die Tragstruktur dieses Geb{\"a}udes setzt sich, charakteristisch f{\"u}r die Skelettbauweise, aus St{\"u}tzen und Bindern zusammen. Dabei werden im Hinblick auf die Aufgabenstellung dem herk{\"o}mmlichen Montageablauf die Besonderheiten und bautechnischen Voraussetzungen einer automatisierten Montage hinzugef{\"u}gt. Es wird eingrenzend speziell die Montage einer Fertigteilst{\"u}tze und eines Unterzuges aufgezeigt. Nach einem einleitenden Kapitel sind in Kapitel 2 die Grundlagen der Automatisierung dargestellt. Darin werden die Gr{\"u}nde f{\"u}r eine Automatisierung und deren theoretischen Vorraussetzungen beleuchtet. Vornehmlich umfasst dies die Erl{\"a}uterung der Anforderungen an Automatisierungsger{\"a}te und automatisierungsgerechte Fertigteile. Im sich anschließenden Kapitel 3 werden die Vorraussetzungen der Planung, der Vermessung und der Herstellung umfassend dargelegt. Die Planungs-voraussetzungen beschreiben den ganzheitlichen L{\"o}sungsansatz von Entwurf, Planung, Herstellung, Ausf{\"u}hrung (Montage) und Betrieb der Geb{\"a}ude. Die verschiedenen Technologien zur Positionsbestimmung, Identifikation und Objektverfolgung werden in den vermessungstechnischen Grundlagen erl{\"a}utern. Um alle Bereiche, die vor dem Beginn der eigentlichen Montage notwendig sind zu beleuchten wird schließlich in den herstellerseitigen Vorraussetzungen insbesondere beschrieben, welche optischen Markierungen, Sensoren und andere Hilfsmittel in die Fertigteile zu integrieren sind. Das Kapitel 4 beschreibt detailliert die beispielhafte Montage der Fertigteilst{\"u}tze und des -unterzuges. Erg{\"a}nzend sind in die einzelnen Schritten der Montage selbst entwickelte Varianten integriert. Als Grundlage werden zu jedem Prozess Gemeinsamkeiten aller Varianten aufgef{\"u}hrt. Daran schließen sich nach Bedarf individuelle Erl{\"a}uterungen an. Die Varianten sind aus {\"U}berlegungen des Autors und aus den Konsultationen mit dem betreuenden Lehrstuhl entwickelt worden. Sie werden in diesem Teil der Arbeit detailliert beschrieben und ihre Eigenarten und Verwendungszwecke erl{\"a}utert. Im Ganzen gesehen ergibt dieses Kapitel eine komplette Montage mit verschiedenen M{\"o}glichkeiten die einzelnen Schritte auszuf{\"u}hren. Im Kapitel 5 werden zu den jeweiligen Varianten die Vor- und Nachteile knapp und {\"u}bersichtlich dargestellt. Aus welchen Gr{\"u}nden eine Variante weiterverfolgt werden sollte oder sie nicht umsetzbar ist, ist in einem sich jeweils anschließenden kurzen Fazit begr{\"u}ndet. Anschließend wird unter teilweiser Verwendung der Varianten eine Vorzugsvariante zur automatisierten Montage entwickelt. Auf detailliertere Ausf{\"u}hrungen wurde hier verzichtet um sich nicht zu wiederholen und Redundanzen zu vermeiden. Ausf{\"u}hrlich wurden die einzelnen verwendeten Varianten bereits im Kapitel 4 beschrieben. Das Kapitel 6 untersucht die wirtschaftlichen Potentiale einer automatisierten Fertigteilmontage und stellt die Kosten einer automatisierten Montage, denen einer herk{\"o}mmlichen Montage gegen{\"u}ber. Dabei wurden verschiedene Annahmen getroffen, die aus den Ergebnissen der vorliegenden Arbeit, den Ergebnissen der Diplomarbeit von Frau Lauterbach und weiteren Literaturrecherchen abgeleitet wurden. Kapital 7 fasst die Ergebnisse der Arbeit zusammen und gibt Hinweise auf notwendige weiterf{\"u}hrende Forschungen und Untersuchungen.}, subject = {Montagegerechte Konstruktion}, language = {de} } @inproceedings{Duft2000, author = {Duft, Mathias}, title = {Zusammenwirken der am Prozess Beteiligten bei komplexen Projekten}, doi = {10.25643/bauhaus-universitaet.703}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7035}, year = {2000}, abstract = {Eine integrierte Gesamtplanung, ein konzentriertes Planungs- und Freigabesystem, ein konsequentes Baustellenmanagement sowie die Einbeziehung und B{\"u}ndelung des Know how und der Leistungsf{\"a}higkeit solventer Partner sind Grundlage f{\"u}r die Optimierung der Kommunikations- und Entscheidungswege f{\"u}r die systemgef{\"u}hrte Prozesslenkung. Das wird am Beispiel der Errichtung des Innerst{\"a}dtischen Einkaufszentrums Anger 1 belegt.}, subject = {Baubetriebslehre}, language = {de} } @article{Eisenbrandt2005, author = {Eisenbrandt, G{\"u}nter}, title = {Die Berufsgenossenschaften zwischen Deregulierung und Konsolidierung}, doi = {10.25643/bauhaus-universitaet.688}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-6882}, year = {2005}, abstract = {Am Beispiel der Tiefbau-Berufsgenossenschaft werden Entzwicklung und Stand der Berufsgenossenschaften in Deutschland betrachtet. Auf die Bildung einer einheitlichen BG der Bauwirtschaft wird Bezug genommen.}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{Eisenbrandt1999, author = {Eisenbrandt, G{\"u}nter}, title = {Arbeitssicherheit bei Arbeiten in Baugruben und Gr{\"a}ben}, doi = {10.25643/bauhaus-universitaet.834}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8347}, year = {1999}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{Eschenbruch2006, author = {Eschenbruch, Klaus}, title = {{\"A}nderungsmanagementsysteme bei komplexen Projekten - Paradigmenwechsel beim Claimmanagement}, doi = {10.25643/bauhaus-universitaet.847}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8470}, year = {2006}, subject = {Weimar / Bauhaus-Universit{\"a}t / Professur Baubetrieb und Bauverfahren}, language = {de} } @phdthesis{Fauth, author = {Fauth, Judith}, title = {Ein handlungsorientiertes Entscheidungsmodell zur Feststellung der Genehmigungsf{\"a}higkeit von Bauvorhaben}, publisher = {Bauhaus-Universit{\"a}tsverlag}, address = {Ilmtal-Weinstraße}, isbn = {978-3-95773-299-6}, doi = {10.25643/bauhaus-universitaet.4509}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20210928-45093}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {318}, abstract = {Die Auseinandersetzung mit der Digitalisierung ist in den letzten Jahren in den Medien, auf Konferenzen und in Aussch{\"u}ssen der Bau- und Immobilienbranche angekommen. W{\"a}hrend manche Bereiche Neuerungen hervorbringen und einige Akteure als Pioniere zu bezeichnen sind, weisen andere Themen noch Defizite hinsichtlich der digitalen Transformation auf. Zu dieser Kategorie kann auch das Baugenehmigungsverfahren gez{\"a}hlt werden. Unabh{\"a}ngig davon, wie Architekten und Ingenieure in den Planungsb{\"u}ros auf innovative Methoden setzen, bleiben die Bauvorlagen bisher zuhauf in Papierform oder werden nach der elektronischen Einreichung in der Beh{\"o}rde ausgedruckt. Vorhandene Ressourcen, beispielsweise in Form eines Bauwerksinformationsmodells, die Unterst{\"u}tzung bei der Baugenehmigungsfeststellung bieten k{\"o}nnen, werden nicht ausgesch{\"o}pft. Um mit digitalen Werkzeugen eine Entscheidungshilfe f{\"u}r die Baugenehmigungsbeh{\"o}rden zu erarbeiten, ist es notwendig, den Ist-Zustand zu verstehen und Gegebenheiten zu hinterfragen, bevor eine Gesamtautomatisierung der innerbeh{\"o}rdlichen Vorg{\"a}nge als alleinige L{\"o}sung zu verfolgen ist. Mit einer inhaltlich-organisatorischen Betrachtung der relevanten Bereiche, die Einfluss auf die Baugenehmigungsfeststellung nehmen, wird eine Optimierung des Baugenehmigungsverfahrens in den Beh{\"o}rden angestrebt. Es werden die komplexen Bereiche, wie die Gesetzeslage, der Einsatz von Technologie aber auch die subjektiven Handlungsalternativen, ermittelt und strukturiert. Mit der Entwicklung eines Modells zur Feststellung der Baugenehmigungsf{\"a}higkeit wird sowohl ein Verst{\"a}ndnis f{\"u}r Einflussfaktoren vermittelt als auch eine Transparenzsteigerung f{\"u}r alle Beteiligten geschaffen. Neben einer internationalen Literaturrecherche diente eine empirische Studie als Untersuchungsmethode. Die empirische Studie wurde in Form von qualitativen Experteninterviews durchgef{\"u}hrt, um den Ist-Zustand im Bereich der Baugenehmigungsverfahren festzustellen. Das erhobene Datenmaterial wurde aufbereitet und anschließend einer softwaregest{\"u}tzten Inhaltsanalyse unterzogen. Die Ergebnisse wurden in Kombination mit den Erkenntnissen der Literaturrecherche in verschiedenen Analysen als Modellgrundlage aufgearbeitet. Ergebnis der Untersuchung stellt ein Entscheidungsmodell dar, welches eine L{\"u}cke zwischen den gegenw{\"a}rtigen Abl{\"a}ufen in den Baubeh{\"o}rden und einer Gesamtautomatisierung der Baugenehmigungspr{\"u}fung schließt. Die prozessorientierte Strukturierung entscheidungsrelevanter Sachverhalte im Modell erm{\"o}glicht eine Unterst{\"u}tzung bei der Baugenehmigungsfeststellung f{\"u}r Pr{\"u}fer und Antragsteller. Das theoretische Modell konnte in Form einer Webanwendung in die Praxis {\"u}bertragen werden.}, subject = {Baugenehmigung}, language = {de} } @phdthesis{Fauth, author = {Fauth, Judith}, title = {A process-oriented decision model for determining the permitability of construction projects}, doi = {10.25643/bauhaus-universitaet.4602}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20220309-46020}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {325}, abstract = {In recent years, the discussion of digitalization has arrived in the media, at conferences, and in committees of the construction and real estate industry. While some areas are producing innovations and some contributors can be described as pioneers, other topics still show deficits with regard to digital transformation. The building permit process can also be counted in this category. Regardless of how architects and engineers in planning offices rely on innovative methods, building documents have so far remained in paper form in too many cases, or are printed out after electronic submission to the authority. Existing resources - for example in the form of a building information model, which could provide support in the building permit process - are not being taken advantage of. In order to use digital tools to support decision-making by the building permit authorities, it is necessary to understand the current situation and to question conditions before pursuing the overall automation of internal authority processes as the sole solution. With a substantive-organizational consideration of the relevant areas that influence building permit determination, an improvement of the building permit procedure within authorities is proposed. Complex areas - such as legal situations, the use of technology, as well as the subjective alternative action - are determined and structured. With the development of a model for the determination of building permitability, both an understanding of influencing factors is conveyed and an increase in transparency for all parties involved is created. In addition to an international literature review, an empirical study served as the research method. The empirical study was conducted in the form of qualitative expert interviews in order to determine the current state in the field of building permit procedures. The collected data material was processed and subsequently subjected to a software-supported content analysis. The results were processed, in combination with findings from the literature review, in various analyses to form the basis for a proposed model. The result of the study is a decision model that closes the gap between the current processes within the building authorities and an overall automation of the building permit review process. The model offers support to examiners and applicants in determining building permit eligibility, through its process-oriented structuring of decision-relevant facts. The theoretical model could be transferred into practice in the form of a web application.}, subject = {Baugenehmigung}, language = {en} } @inproceedings{Frerichs2000, author = {Frerichs, Uwe}, title = {Zukunft des Bauens aus der Sicht eines industriellen Baubetriebs}, doi = {10.25643/bauhaus-universitaet.702}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7023}, year = {2000}, abstract = {Im Beitrag werden die Merkmale zuk{\"u}nftigen Bauens dargestellt. Sie beruhen auf drei Kernpunkten: Rationalisierung, Standardisierung und Weiterentwicklung der Technik. Betont wird der hohe Einfluss der Planung auf die Qualit{\"a}t der Bauwerke.}, subject = {Baubetriebslehre}, language = {de} } @misc{GarischKutznerOehleretal., author = {Garisch, Mathias and Kutzner, Eva and Oehler, Vanessa and Patzer, Nicole and Schmeing, Carolin}, title = {Analyse von Terminpl{\"a}nen}, doi = {10.25643/bauhaus-universitaet.2139}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20140317-21392}, pages = {61}, abstract = {Das Bachelorprojekt „Analyse von Terminpl{\"a}nen" besch{\"a}ftigt sich mit der Analyse der Abh{\"a}ngigkeiten zwischen den unterschiedlichen Vorg{\"a}ngen des Bauablaufs. Die Problematik in der Terminplanerstellung liegt darin, dass ein Terminplan nicht alle Hintergrundinformationen abbildet und es daher zu Projektverz{\"o}gerungen und Absprachefehlern kommen kann. Dieses Bachelorprojekt macht Gebrauch von bereits aufbereiteten Informationen zur genannten Problematik in Form eines vorangegangen Bachelorprojekts und eines Masterprojekts, sowie einer Umfrage des Instituts f{\"u}r Bauwirtschaft der Universit{\"a}t Kassel. In diesem Projekt werden 50 neue und 100 bereits existierende Terminpl{\"a}ne von diversen Unternehmen aus ganz Deutschland analysiert und ausgewertet. Die Analyse der Terminpl{\"a}ne basiert auf gef{\"u}hrten Experteninterviews. Das Interview ber{\"u}cksichtigt Faktoren wie zum Beispiel Darstellungsformen, Detaillierungsgrade, Abh{\"a}ngigkeiten, Vorgangsdauern oder Planungsgrundlagen. Durch die Befragung von m{\"o}glichst vielen Firmen konnte festgestellt werden, dass jeder Terminplanentwickler eine Vorgehensweise entwickelt, nach welcher er arbeitet. Außerdem ist in den Gespr{\"a}chen deutlich geworden, dass das Theorie- Praxis-Gef{\"a}lle sehr groß ist. Das heißt, dass theoretische Modelle aus der Ausbildung an beispielsweise Hochschulen, in der Praxis heutzutage wenig angewandt werden. Nach der Analyse der Terminpl{\"a}ne und Auswertung der Interviews, werden die Daten in eine vom vorangehenden Masterprojekt erstellte Excel-Tabelle eingepflegt. Die vorhandenen Informationen werden dann anhand verschiedenster Diagramme verglichen und ausgewertet.}, subject = {Analyse}, language = {de} } @inproceedings{Gartung2000, author = {Gartung, Thomas}, title = {Bew{\"a}hrte Projektsteuerung f{\"u}r ICE-Neubautrassen - Ingenieuraufgaben an der ICE-Strecke Erfurt - N{\"u}rnberg}, doi = {10.25643/bauhaus-universitaet.701}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7018}, year = {2000}, abstract = {Um die kompexen Randbedingungen des Eisenbahnbaus erf{\"u}llen zu k{\"o}nnen, hat die Planungsgesellschaft Bahnbau Deutsche Einheit (PBDE) neue Methoden f{\"u}r ein effizientes Management von Planung und Bau eingef{\"u}hrt, die in dem Beitrag vorgestellt werden.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Geyer2007, author = {Geyer, Annett}, title = {K{\"o}nnen wir uns schlechte Arbeitsbedingungen leisten?}, doi = {10.25643/bauhaus-universitaet.839}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8397}, year = {2007}, subject = {Bev{\"o}lkerungsentwicklung}, language = {de} } @masterthesis{Goedicke, type = {Bachelor Thesis}, author = {Goedicke, Glenn}, title = {M{\"o}gliche Schnittstellenverschiebungen zwischen Bau- und Nebent{\"a}tigkeiten auf ausdifferenzierten Baustellen aus arbeitsrechtlicher Sicht}, doi = {10.25643/bauhaus-universitaet.2419}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20150629-24192}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {50}, abstract = {In der modernen Arbeitswelt ist es {\"u}blich betriebliche Aufgaben extern zu vergeben. Dieser Vorgang wird in der Wirtschaft Outsourcing genannt und beschr{\"a}nkt sich in der Regel auf Arbeiten, welche nicht zu den Kernkompetenzen eines Unternehmens geh{\"o}ren. Wenn diese Arbeiten durch spezialisierte Unternehmen {\"u}bernommen werden ergeben sich Potenziale, die weit {\"u}ber eine bloße Kostensenkung hinausgehen. Der Kern dieser Arbeit bezieht sich auf die Auslagerung von sogenannten Nebent{\"a}tigkeiten im Zusammenhang einer Bauwerksausf{\"u}hrung. Dabei werden die arbeitsrechtliche Situation, Machbarkeit und Sinnhaftigkeit analysiert. Das Arbeitsrecht im Baugewerbe ist {\"u}beraus komplex und von starren Regelungen gepr{\"a}gt. Die f{\"u}r allgemeinverbindlich erkl{\"a}rten Tarifvertr{\"a}ge gelten gemeinhin f{\"u}r alle Betriebe, die {\"u}berwiegend bauliche T{\"a}tigkeiten aus{\"u}ben. Problematisch wird die tarifliche Zuordnung f{\"u}r Betriebe, welche die Nebent{\"a}tigkeiten {\"u}bernehmen und f{\"u}r gew{\"o}hnlich nicht in den Geltungsbereich der Tarifvertr{\"a}ge fallen. Bei der Vergabe von Nebent{\"a}tigkeiten mit Hilfe von Werk- oder Dienstvertr{\"a}gen bedarf es einer genauen Kl{\"a}rung, ab wann eine unerlaubte Arbeitnehmer{\"u}berlassung beginnt. Im Rahmen dieser Arbeit soll untersucht werden, inwieweit eine Auslagerung der baulichen Nebent{\"a}tigkeiten durch eine Werk- oder Dienstvertragsvergabe an die Grenzen der arbeitsrechtlichen Gegebenheiten st{\"o}ßt. Zus{\"a}tzlich wird eine tarifliche Einordnung der T{\"a}tigkeiten vorgenommen.}, subject = {Arbeitsrecht}, language = {de} } @misc{Gollos, type = {Master Thesis}, author = {Gollos, Carolin}, title = {Optimierung der Baustellenlogistik f{\"u}r die Ausbauphase eines Großprojektes}, doi = {10.25643/bauhaus-universitaet.2285}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20140901-22858}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {98}, abstract = {Baulogistische Vorg{\"a}nge sind in einer modern angelegten Baustelle der Schl{\"u}ssel zu einer wirtschaftlichen Abwicklung. Dieses gilt nicht nur f{\"u}r den Rohbau, bei dem die sehr enge Verzahnung zwischen den Fertigungs- und Logistikprozessen auf der Baustelle zu beobachten ist, sondern noch mehr f{\"u}r die Ausbauphase, bei der vermeintlich unabh{\"a}ngig voneinander agierende Einzelunternehmen des Ausbaus auf engem Raum miteinander um die jeweils besten Liefer- und Montagebedingungen konkurrieren. Ausgehend von einer aktuellen Großbaustelle in Jena werden verschiedene Varianten einer leistungsf{\"a}higen Baulogistik entwickelt und deren Implementierung auf der Baustelle vorbereitet werden.}, subject = {Baulogistik}, language = {de} } @inproceedings{Habiuk2003, author = {Habiuk, Anja}, title = {Arbeits- und Gesundheitsschutz aus der Sicht von Besch{\"a}ftigten und Studierenden - Eine Fragebogenstudie}, doi = {10.25643/bauhaus-universitaet.474}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4748}, year = {2003}, abstract = {Die im Vortrag erl{\"a}uterten Untersuchung dienten der Erfassung von Bestimmungsgr{\"o}ßen und relevanten Aspekten von sicherheits- und gesundheitsgerechtem Verhalten. Es sollen individuelle verhaltenssteuernde Gr{\"o}ßen und Steuerungsformen der Organisation beim Umgang mit Sicherheits- und Gesundheitsrisiken erhoben werden. Dargestellt werden Methodik, Fragebogen und erste Ergebnisse der Untersuchung.}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{Hahn2002, author = {Hahn, Oliver}, title = {Dezentrale Bauzustandserfassung am Beispiel von Riss{\"u}berwachungen}, doi = {10.25643/bauhaus-universitaet.710}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7106}, year = {2002}, abstract = {Bauzust{\"a}nde lassen sich dank einer sich best{\"a}ndig weiterentwickelnden Technik sehr genau und zuverl{\"a}ssig erfassen. Durch den Einsatz elektronischer Sensoren und automatischer Datenerfassungssysteme sowie unter Nutzung der Datenfern{\"u}bertragung {\"u}ber Telefon oder Internet l{\"a}sst sich eine Vielzahl von Objekten {\"u}berwachen. Der Verfasser gibt ein Anwendungsbeispiel anhand der Riss{\"u}berwachung an Geb{\"a}uden.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{HanfFricke2002, author = {Hanf, Peter and Fricke, Ronald}, title = {Erfahrungen bei der Neubaustrecke K{\"o}ln-Rhein/Main aus Sicht der Arbeitsgemeinschaft Mittelstand}, doi = {10.25643/bauhaus-universitaet.715}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7156}, year = {2002}, abstract = {Die Verfasser schildern ihre Erfahrungen bei der Errichtung der Neubaustrecke K{\"o}ln-Rhein/Main aus Sicht einer Arbeitsgemeinschaft, der zehn Partnerfirmen aus der gesamten Bundesrepublik sowie eine Schweizer Firmengruppe angeh{\"o}rten: zur Strecke, Entwurf der Trasse, Streckenverlauf und zu erstellende Bauwerke, Allgemeines zum Vergabeverfahren, Angebotsbearbeitung, Aufbau der Arge Mittelstand, Erfahrungen aus der Durchf{\"u}hrung, Fazit}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Havers2002, author = {Havers, Martin}, title = {Zahlungssicherheit beim Bauen - mit Sicherheit Sicherheiten?!}, doi = {10.25643/bauhaus-universitaet.713}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7138}, year = {2002}, abstract = {Der Verfasser behandelt das Problem der Sicherheiten, die dazu dienen, das wirtschaftliche Risiko f{\"u}r den Fall zu vermindern, dass der Vertragspartner Vertragspflichten nicht nachkommen will oder kann: Sicherheiten des \S 17 VOB/B, Sicherheiten nach \S 648 BGB / \S 648 a BGB}, subject = {Baubetriebslehre}, language = {de} } @phdthesis{Hegewald2011, author = {Hegewald, Antje}, title = {Strategische Handlungsempfehlungen f{\"u}r die technische Bewirtschaftung von Wohnungsbest{\"a}nden}, isbn = {978-3-86068-460-3}, doi = {10.25643/bauhaus-universitaet.1475}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111216-14759}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2011}, abstract = {Das Bauen im Bestand ist ein wichtiges, aber vergleichsweise noch wenig erforschtes Wissenschaftsfeld. Die Konzentration auf das Bauen im Bestand im Wohnungsbau f{\"u}hrte in den bautechnischen Abteilungen von Wohnungsunternehmen zu einem strategischen Wandel. Die Betreuung der Bestandsmaßnahmen ist zum wichtigsten Aufgabenfeld der technischen Bewirtschaftung geworden. Bestandsmaßnahmen bezeichnen die Baumaßnahmen, die die Wohnobjekte (Wohngeb{\"a}ude, Außenanlagen) und ihre Elemente erhalten oder ver{\"a}ndern. Basis f{\"u}r eine rationale und kosteneffiziente technische Bewirtschaftung der Wohnungsbest{\"a}nde sind Kenntnisse der charakteristischen Eigenschaften der Bestandsmaßnahmen und ihrer Abh{\"a}ngigkeiten. Die bisherigen empirischen Untersuchungen zu Bestandsmaßnahmen weisen forschungsmethodische und inhaltliche Defizite auf. Der Erkenntnisgewinn ist so noch nicht f{\"u}r die professionelle und kosteneffiziente technische Bewirtschaftung der Wohnungsbest{\"a}nde umsetzbar. Ziel der Arbeit ist es, strategische Handlungsempfehlungen f{\"u}r die rationale und kostenoptimierte Auswahl von Bestandsmaßnahmen in Wohnungsunternehmen zu entwickeln und zu bewerten. Darauf aufbauend soll ein Konzept f{\"u}r eine objektiv begr{\"u}ndete Auswahl von Bestandsmaßnahmen entworfen werden. Die Arbeit basiert auf der empirischen Untersuchung von Bestandsmaßnahmen. Die Maßnahmen wurden am Beispiel eines unternehmensstrategisch interessanten Wohnungsunternehmens und eines statistisch gesehen typischen Wohnungsbestandes betrachtet. Es wurden circa 3000 Maßnahmen {\"u}ber einen Zeitraum von f{\"u}nf Jahren untersucht. Die Maßnahme- und Kostenverteilungen der Bestandsmaßnahmen werden in Abh{\"a}ngigkeit vom Baualter und von unternehmensstrategischen Einflussfaktoren charakterisiert. Mit diesen Erkenntnissen werden strategische Handlungsempfehlungen zur Erf{\"u}llung der Pflichten der technischen Bewirtschaftung sowie der Gew{\"a}hrleistung eines Investitionsminimums abgeleitet. Die Handlungsempfehlungen dienen der Ermittlung von Kostensenkungspotentialen und der Berechnung des Investitionsminimums der technischen Bewirtschaftung. Sie werden in ein Konzept zur objektivierten und systematischen Auswahl der Maßnahmen eingebunden.}, subject = {Bauen im Bestand}, language = {de} } @inproceedings{Henke2005, author = {Henke, Torsten}, title = {Schadstoffproblematik beim Umbau der Anna-Amalia-Bibliothek Weimar}, doi = {10.25643/bauhaus-universitaet.693}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-6935}, year = {2005}, abstract = {Sieben Bestandsbauten der Herzogin-Anna-Amalia-Bibliothek Weimar sollten umgenutzt und durch zwei oberirdische und drei unterirdische Neubauten erg{\"a}nzt werden. Im Beitrag n{\"a}her beschrieben: Schadstofferkundung und Beurteilung der Gefahren der Baumaßnahmen, Sicherheitsmaßnahmen, Durchf{\"u}hrung von Reinigungsarbeiten}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{Hilbert1999, author = {Hilbert, Hans-Kurt}, title = {Ger{\"u}stet f{\"u}r den Ernstfall - Ausstattung f{\"u}r die Erste Hilfe auf Baustellen : Der AMD - der Betriebsarzt der Bauunternehmen}, doi = {10.25643/bauhaus-universitaet.833}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8336}, year = {1999}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{HollermannMelzner, author = {Hollermann, Sebastian and Melzner, J{\"u}rgen}, title = {24. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik}, editor = {Hollermann, Sebastian and Melzner, J{\"u}rgen}, address = {Weimar}, doi = {10.25643/bauhaus-universitaet.1937}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20130523-19371}, abstract = {Tagungsband - 24. Assistententreffen der Bereiche Bauwirtschaft, Baubetrieb und Bauverfahrenstechnik 10.-12.Juli 2013 Weimar}, subject = {Baubetrieb}, language = {de} } @inproceedings{Hoernig2000, author = {H{\"o}rnig, Wolfgang}, title = {Moderne Fertigungsmethoden im Br{\"u}ckenbau am Beispiel der Bogenherstellung {\"u}ber die Wilde Gera}, doi = {10.25643/bauhaus-universitaet.699}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-6994}, year = {2000}, abstract = {Es werden die Erfahrungen der Adam H{\"o}rnig Baugesellschaft bei der Bogenherstellung im Freivorbau einer Autobahnbr{\"u}cke beschrieben.}, subject = {Baustelle}, language = {de} } @phdthesis{Hoerold, author = {H{\"o}rold, Stefan}, title = {Leistungsbezogene Musterjahresganglinien f{\"u}r den Straßenbetriebsdienst}, doi = {10.25643/bauhaus-universitaet.4491}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20210830-44910}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {124}, abstract = {In den letzten Jahrzehnten unterlag der Straßenbetriebsdienst tiefgreifenden Ver{\"a}nderungen. Diese Ver{\"a}nderungen schließt auch die betriebliche Steuerungsphilosophie ein, um eine planungsrationale und {\"o}konomische Gestaltung des Straßenbetriebsdienstes zu unterst{\"u}tzen. Dabei erfolgt eine verbindliche Vorgabe der Leistungsinhalte und -umf{\"a}nge und erm{\"o}glicht eine Budgetierung f{\"u}r das vorgesehene Jahresarbeitsprogramm. Ziel der Untersuchung ist die Entwicklung eines Modells f{\"u}r die Ermittlung von leistungsbezogenen Musterjahresganglinien zur Unterst{\"u}tzung der Jahresarbeitsplanung. Daf{\"u}r lagen f{\"u}r jede Leistung des Leistungsbereiches „Gr{\"u}npflege" jeweils 260 einzelne Jahresganglinien vor. Im Ergebnis der Untersuchung wird die leistungsbezogene Musterjahresganglinie in vier Schritten ermittelt. Im ersten Schritt erfolgt die Pr{\"u}fung der Datenqualit{\"a}t; im zweiten Schritt eine Korrelationsanalyse; im dritten Schritt die fachliche {\"U}berpr{\"u}fung der Leistungsauspr{\"a}gung und im vierten Schritt die Ermittlung der leistungsbezogenen Musterjahresganglinie aus den verbliebenen leistungsbezogenen Jahresganglinien.}, subject = {Straßenbetriebsdienst}, language = {de} } @inproceedings{Kapellmann2004, author = {Kapellmann, Klaus D.}, title = {Planungshaftung bei Vertr{\"a}gen auf der Basis funktionaler oder teilfunktionaler Leistungsbeschreibung}, doi = {10.25643/bauhaus-universitaet.718}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7188}, year = {2004}, abstract = {Funktionale Leistungsbeschreibung, das auf die Planung anzuwendende Recht, vertragliche Zuteilung der Planungspflicht, fehlerhafte Auftraggeberplanung, Probleme beim Construction Management}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Kath2005, author = {Kath, Thilo}, title = {Sicher arbeiten mit Kr{\"a}nen durch Simulation und Visualisierung}, doi = {10.25643/bauhaus-universitaet.690}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-6901}, year = {2005}, abstract = {Bestimmungen und Anforderungen an den Entwurf von Baustelleneinrichtungen (BE), Kraneinsatzplan als Bestandteil der BE, planungstechnische Aspekte, Untersuchung von CAD-Anwendungen f{\"u}r die Planung von Baustelleneinrichtungen, Entwicklung eines Kraneinsatzplaners, Sicherheitsaspekte bei der Planung von Baukraneins{\"a}tzen. Es zeigte sich, dass gerade die Forderung der Betrachtung kausaler und r{\"a}umlicher Abh{\"a}ngigkeiten mit den in der Praxis angewandten Planungswerkzeugen nicht oder nur eingeschr{\"a}nkt realisierbar ist. Mit dem Programm >EasyCrane TK< wird eine M{\"o}glichkeit aufgezeigt, die Erstellung von Kraneinsatzpl{\"a}nen effizienter und f{\"u}r die Umsetzung auf der Baustelle sicherer zu gestalten.}, subject = {Arbeitsschutz}, language = {de} } @inproceedings{Kiewitt2005, author = {Kiewitt, Walter}, title = {Die neue Gefahrstoffverordnung - neue Regelungen auch f{\"u}r Baustellen?}, doi = {10.25643/bauhaus-universitaet.692}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-6925}, year = {2005}, abstract = {Was bringt die >Gefahrstoffverordnung 2004< Neues? Grundmaßnahmen bei T{\"a}tigkeiten mit Gefahrstoffen (Schutzstufen)}, subject = {Arbeitsschutz}, language = {de} } @misc{Klima2011, type = {Master Thesis}, author = {Klima, Sebastian}, title = {Anwendungsm{\"o}glichkeiten der Werkzeuge der Lean Construction in der Ablaufplanung im Fassadenbau}, doi = {10.25643/bauhaus-universitaet.1457}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20110816-15531}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2011}, abstract = {Trotz Mechanisierung und Vorfertigung ist die Bauproduktion stark handwerklich gepr{\"a}gt. Zu dem sind Baustellen in der Regel komplexe und einmalige Produktionsst{\"a}tten f{\"u}r Einzelobjekte. Sie sind h{\"a}ufig witterungsabh{\"a}ngig, was die Planbarkeit des Herstellungsprozesses beeintr{\"a}chtigt. Zu dem unterscheiden sich die jeweiligen {\"o}rtlichen Bedingungen stark voneinander. St{\"a}ndig wechselndes Personal und Nachunternehmer aus verschiedenen L{\"a}ndern mit unter-schiedlichen Erfahrungen und Qualifikationen sowie andere Ger{\"a}te, Herstellungsmethoden und Baustoffe stellen sehr komplexe Anforderungen an die Baubeteiligten. Außerdem gelten in Deutschland hohe Qualit{\"a}tsanforderungen und komplizierte Vorschriften, die den Aufwand f{\"u}r die Bauleitung deutlich erh{\"o}hen. Die Bauindustrie hat sich aus der Kombination verschiedener Berufe entwickelt und leidet deshalb bis heute unter einer arbeitsteiligen Gliederung. Dies hat zur Folge, dass gegenw{\"a}rtige Ressourcen nur mangelhaft ausgenutzt werden. Besonders bei den Schnittstellen zwischen den einzelnen Gewerken besteht enormes Potential, da die Abl{\"a}ufe und {\"U}berg{\"a}nge zwischen den einzelnen Gewerken meist nicht richtig funktionieren. Hinzu kommen Lieferprobleme sowie zum Teil gegens{\"a}tzliche Ziele der am Bau Beteiligten, welche die Arbeit erschweren und das Resultat beeintr{\"a}chtigen. Dies hat zur Folge, dass die tats{\"a}chliche, produktive Arbeitsleistung im Verh{\"a}ltnis zur gesamten Arbeitszeit zu gering ausf{\"a}llt. Seit Mitte der neunziger Jahre versuchen, vor allem amerikanische Bauingenieure und Ma-nagementfachleute, wissenschaftlich einzelne Gestaltungsprinzipien und Methoden der Lean Production (LP) aus der station{\"a}ren Industrie auf das Bauwesen zu {\"u}bertragen und bran-chenspezifisch weiterzuentwickeln. Dabei werden haupts{\"a}chlich Werkzeuge und Methoden des Toyota Produktionssystems (TPS) und der LP verwendet um eine Steigerung der Produktivit{\"a}t und Stabilisierung der Bauabl{\"a}ufe zu erreichen. Dieser Managementansatz zur Gestaltung der Baustellenproduktion wird als Lean Construction (LC) bezeichnet.}, subject = {Ablaufplanung}, language = {de} } @inproceedings{Klingsporn2007, author = {Klingsporn, Karin}, title = {Gesundheitsf{\"u}rsorge im Unternehmen - Betriebliche Gesundheitsf{\"o}rderung}, doi = {10.25643/bauhaus-universitaet.842}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8427}, year = {2007}, subject = {Bev{\"o}lkerungsentwicklung}, language = {de} } @masterthesis{Kratt, type = {Bachelor Thesis}, author = {Kratt, Helen}, title = {Building Information Modeling im Erdbau - eine Potentialanalyse im Tiefbau}, doi = {10.25643/bauhaus-universitaet.2613}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20160623-26132}, school = {Bauhaus-Universit{\"a}t Weimar}, abstract = {Die meisten Baustellen bieten Optimierungspotential. Vor allem der Erdbau fordert durch seine hohe Dynamik und großen Unsicherheiten eine hohe Planungsleistung f{\"u}r jedes neue Projekt. Doch auch bei bester Planung und Vorbereitung kann der Bauprozess durch nicht vorhersehbare Einwirkungen aufgehalten werden. Dazu z{\"a}hlen Witterungseinfl{\"u}sse, Baumaschinenausf{\"a}lle, unvorhergesehene Bodenschichten und ver{\"a}nderte Zielsetzungen des Auftraggebers. Dies kann zu St{\"o}rungen im Bauablauf f{\"u}hren, die eine Bauzeitverz{\"o}gerung und eine Kostensteigerung nach sich ziehen. Um diese Probleme zu umgehen, sind ein verbesserter Informationsfluss, genaue Bodenaufschl{\"u}sse und eine exakte Dimensionierung des einzusetzenden Ger{\"a}tes notwendig. Hier kann Building Information Modeling (BIM) zum Einsatz kommen. Diese Anwendung bietet die M{\"o}glichkeit, die Datengenauigkeit zu erh{\"o}hen, den Informationsfluss auf der Baustelle zu verbessern, eine Informationsplattform f{\"u}r alle Beteiligten zu schaffen und die Abl{\"a}ufe transparent zu gestalten. Außerdem erm{\"o}glicht die Anwendung Planungsschritte miteinander zu verkn{\"u}pfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das {\"u}ber den gesamten Lebenszyklus erweitert werden kann. Die Grundlagen dieser Arbeit bilden die Begriffsdefinitionen zu Erdbau, Tiefbau und Building Information Modeling. Diese Arbeit setzt sich speziell mit Erdbauwerken und deren Sicherungsmaßnahmen auseinander. Darauf aufbauend wird im Rahmen einer Recherche der Forschungsstand im Bereich Building Information Modeling und Tiefbau zusammengefasst. Mit Hilfe einiger Forschungsbeitr{\"a}ge, -projekte, -verb{\"a}nde, Dissertationen und Anwendungsprogrammen wird ein {\"U}berblick geschaffen. Die {\"U}bersicht soll eine Grundlage f{\"u}r die weitere Forschung auf diesem Gebiet bilden. Abschließend findet eine Bewertung statt. {\"U}ber die Aufgabenstellung hinaus wird zus{\"a}tzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt, um aufzuzeigen, dass das Potential auf Erdbaustellen mit BIM-Anwendungen besser ausgesch{\"o}pft werden kann. Es wird versucht eine Gabionenwand, eine Sicherungsmaßnahme von Erdbauwerken zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm f{\"u}r den Einsatz im Tiefbau bewertet.}, subject = {Erdbau}, language = {de} } @phdthesis{Krudewig2007, author = {Krudewig, Norbert}, title = {Streitbeilegungsmodell f{\"u}r das Bauwesen in Deutschland}, doi = {10.25643/bauhaus-universitaet.1251}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20080303-13181}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2007}, abstract = {Baustreitigkeiten werden in Deutschland in nicht ausreichender Form von den Vertragsparteien selbst gel{\"o}st. Die unterschiedliche Auslegung der vertraglich geschuldeten Bauleistung zwischen den Parteien wird immer h{\"a}ufiger zum Inhalt von vor Gericht ausgetragenen Streitigkeiten. Die Anzahl und die Komplexit{\"a}t der Streitf{\"a}lle f{\"u}hrt zu einer {\"U}berlastung der Gerichte mit der Folge von meist mehrj{\"a}hrigen Verfahrensdauern, die in einzelnen F{\"a}llen mehr als ein Jahrzehnt andauern k{\"o}nnen. Die hieraus resultierenden Rechts- und Finanzunsicherheiten k{\"o}nnen f{\"u}r die Prozessbeteiligten weitreichende Konsequenzen bis hin zur Insolvenz mit sich f{\"u}hren. Die in Deutschland {\"u}bliche Projektstruktur Auftraggeber - Generalunternehmer - Nachunternehmer f{\"u}hrt schon in dieser einfachen Konstellation dazu, dass parallele Rechtsstreitigkeiten in ein und derselben Sache auftreten k{\"o}nnen. Unterschiedliche Gerichtsstandsklauseln in den einzelnen Vertragsebenen bewirken, dass aufgrund unterschiedlicher Beteiligter derselbe Streitfall an verschiedenen Gerichtsst{\"a}nden behandelt werden muss. Die Ergebnisse der einzelnen Verfahren k{\"o}nnen dabei unterschiedlich ausfallen. Auf Basis dieser Randbedingungen wird der Wunsch vieler Baubeteiligter nach einer schnelleren, effektiven Streitbeilegung f{\"u}r das deutsche Bauwesen immer gr{\"o}ßer. Im Rahmen der vorliegenden Arbeit wird den Vertragsbeteiligten ein Weg aufgezeigt, der die H{\"a}ufigkeit von langwierigen und risikobehafteten Gerichtsprozessen reduziert. Auf Basis der maßgeblichen Streitbeilegungsverfahren wird hierzu ein auf die Anforderungen des Bauwesens angepasstes Streitbeilegungsmodell entwickelt. Im deutschen Bauvertragswesen sind die Inhalte der außergerichtlichen Streitbeilegung nicht oder nur rudiment{\"a}r implementiert. Internationale Bauvertragsmuster greifen einzelne Elemente der außergerichtlichen Streitbeilegung auf, lassen aber ein ganzheitliches Modell vermissen. Zur Streitbeilegung existieren Verfahren zur Verhandlung, Schlichtung, Mediation und Entscheidung, die entweder konsensual oder kontradiktorisch wirken. Ein Modell, das die gegebenen M{\"o}glichkeiten der außergerichtlichen Streitbeilegung in vollem Umfang nutzt, wurde bisher nicht passend f{\"u}r die deutschen Rahmenbedingungen entwickelt. Eine Anpassung von Streitbeilegungsverfahren auf die jeweiligen Aufbauorganisationen der am Bau beteiligten Unternehmen wurde bisher nicht vorgenommen. In der Arbeit werden in einem ersten Schritt die Leitlinien der gesch{\"a}ftlichen Beziehungen im Bauwesen betrachtet und hinsichtlich ihrer Wirkung auf Streitbeilegungsmechanismen bewertet. In einem zweiten Schritt werden die international gebr{\"a}uchlichen Verfahren zur Streitbeilegung vorgestellt, analysiert und bewertet. Unter Anwendung der Analogie- und Variationsmethodik werden bestehende und bew{\"a}hrte Ans{\"a}tze zur Streitbeilegung aufgenommen, kombiniert und zu einem verbesserten Streitbeilegungsmodell weiterentwickelt. Zur Implementierung des modular aufgebauten Modells wird unter Ber{\"u}cksichtigung der unterschiedlichen Gr{\"o}ßen der im Bauwesen t{\"a}tigen Unternehmen eine Anpassung des Systems vorgenommen. In einem weiteren Verfahrensschritt werden Wege zur Vereinbarung geeigneter Streitbeilegungsmechanismen zwischen den Vertragsbeteiligten aufgezeigt. Im Rahmen der Validierung des Modells wird durch die Anwendung auf extreme Systemkonfrontationen aufgezeigt, dass das Streitbeilegungsmodell auch unter besonderen Randbedingungen einsetzbar ist. Der Stand der Wissenschaft wird im Bereich der Streitbeilegung umfassend aufbereitet. Es wird ein Verfahren entwickelt, das erstmalig die Vorteile der Verhandlung, Schlichtung, Mediation und Entscheidung vollst{\"a}ndig in ein Modell zur Streitbeilegung im Bauwesen implementiert. Durch definierte Verfahrensabl{\"a}ufe wird den Vertragsparteien eine strukturierte, zielorientierte Vorgehensweise zur Beilegung von Streitigkeiten vorgegeben. Die systematisierte Aufbereitung beg{\"u}nstigt und beschleunigt die außergerichtliche Streitbeilegung und reduziert im Ergebnis die Anzahl von vor Gerichten auszutragenden Streitf{\"a}llen. Der modulare Aufbau des Streitbeilegungsmodells erm{\"o}glicht flexible Reaktionen auf unterschiedliche Anforderungen. Die Ber{\"u}cksichtigung der Unternehmensgr{\"o}ßen durch Variation der zu verwendenden Module erm{\"o}glicht eine große Einsatzbreite des Modells. Gleichzeitig wird auch durch die Definition des Moduls „Experten-Entscheidung" als Wahloption die Verwendung des Streitbeilegungsmodells den Parteien erm{\"o}glicht, die sich einer Experten-Entscheidung nicht beugen wollen oder d{\"u}rfen. Den Vertragsparteien werden Wege zur Vereinbarung des Modells aufgezeigt und ein Auswahlverfahren zur Bestimmung des externen Expertengremiums vorgegeben. Zur Vereinfachung der Implementierung des Streitbeilegungsmodells werden {\"A}nderungsvorschl{\"a}ge zur Anpassung der VOB/A und VOB/B unterbreitet.}, subject = {Beilegung}, language = {de} } @inproceedings{Koenig2006, author = {K{\"o}nig, Markus}, title = {Workflow-Management in der Baupraxis}, doi = {10.25643/bauhaus-universitaet.850}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8500}, year = {2006}, subject = {Weimar / Bauhaus-Universit{\"a}t / Professur Baubetrieb und Bauverfahren}, language = {de} } @inproceedings{Koeppel2006, author = {K{\"o}ppel, Bernd}, title = {Nachtragsj{\"a}gerei und Akquisition, eine unm{\"o}gliche Symbiose?}, doi = {10.25643/bauhaus-universitaet.845}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-8459}, year = {2006}, subject = {Weimar / Bauhaus-Universit{\"a}t / Professur Baubetrieb und Bauverfahren}, language = {de} }