@inproceedings{XieIssaO'Brien2004, author = {Xie, Haiyan and Issa, Raja and O'Brien, William}, title = {Structure of a Formal User Model for Construction Information Retrieval}, doi = {10.25643/bauhaus-universitaet.129}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1296}, year = {2004}, abstract = {Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction.}, subject = {Bauwerk}, language = {en} } @article{WillenbacherHuebler2004, author = {Willenbacher, Heiko and H{\"u}bler, Reinhard}, title = {Intelligent Link-Management for the Support of Integration in Building Life Cycle}, doi = {10.25643/bauhaus-universitaet.222}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2223}, year = {2004}, abstract = {The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its "intelligent" link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants.}, subject = {Mehragentensystem}, language = {en} } @phdthesis{Willenbacher2002, author = {Willenbacher, Heiko}, title = {Interaktive verkn{\"u}pfungsbasierte Bauwerksmodellierung als Integrationsplattform f{\"u}r den Bauwerkslebenszyklus}, doi = {10.25643/bauhaus-universitaet.30}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20040216-328}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2002}, abstract = {Den Gegenstand der Dissertation bilden die Konzeption und die exemplarische Realisierung eines verkn{\"u}pfungsbasierten Bauwerksmodellierungsansatzes zur Schaffung einer integrierenden Arbeits- und Planungsumgebung f{\"u}r den Lebenszyklus von Bauwerken. Die Basis der Integration bildet ein deklarativ ausgerichteter Bauwerksmodellverbund bestehend aus abstrahierten, dom{\"a}nenspezifischen Partialmodellen. Auf Grund der de facto existierenden Dynamik im Bauwerkslebenszyklus werden sowohl der Bauwerksmodellverbund als auch die einzelnen Partialmodelle dynamisch modifizierbar konzipiert und auf Basis spezieller Modellverwaltungssysteme technisch realisiert. Die Verst{\"a}ndigung innerhalb der vorgeschlagenen Gesamtbauwerksmodellarchitektur basiert auf anwenderspezifisch zu erstellenden Verkn{\"u}pfungen zwischen den Partialmodellen und wird im Sinne einer hybriden Modellarchitektur durch eine zentrale, die Verkn{\"u}pfungen verwaltende Komponente koordiniert. Zur Verwaltung und Abarbeitung der Verkn{\"u}pfungen wird der Einsatz von Softwareagenten im Rahmen eines Multiagentensystems vorgeschlagen und diskutiert.}, subject = {Bauwerk}, language = {de} } @article{Wiedemann1997, author = {Wiedemann, A.}, title = {Digital Architectural Photogrammetry for Building Registration}, doi = {10.25643/bauhaus-universitaet.489}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4892}, year = {1997}, abstract = {For many purposes geometric information about existing buildings is necessary, e.g. planing of conservation or reconstruction. Architectural photogrammetry is a technique to acquire 3D geometric data of buildings for a CAD model from images. In this paper the state of the art in architectural photogrammetry and some developments towards automation are described. The photogrammetric process consists of image acquisition, orientation and restitution. Special attention is put on digital methods, from digital image acquisition to restitution methods, supported by digital image processing. There are a few field of development towards automation, e.g. feature extraction, extraction of edges and lines and the detection of corresponding points. The acquired data may be used in a CAD environment or for visualization in Virtual Reality Models, using digital orthoimages for texture mapping.}, subject = {Bauwerk}, language = {en} } @inproceedings{WellmannJelicBaitschHartmann2004, author = {Wellmann Jelic, Andres and Baitsch, Matthias and Hartmann, Dietrich}, title = {Distributed computing of failure probabilities for structures in civil engineering}, doi = {10.25643/bauhaus-universitaet.103}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1030}, year = {2004}, abstract = {In this contribution the software design and implementation of an analysis server for the computation of failure probabilities in structural engineering is presented. The structures considered are described in terms of an equivalent Finite Element model, the stochastic properties, like e.g. the scatter of the material behavior or the incoming load, are represented using suitable random variables. Within the software framework, a Client-Server-Architecture has been implemented, employing the middleware CORBA for the communication between the distributed modules. The analysis server offers the possibility to compute failure probabilities for stochastically defined structures. Therefore, several different approximation (FORM, SORM) and simulation methods (Monte Carlo Simulation and Importance Sampling) have been implemented. This paper closes in showing several examples computed on the analysis server.}, subject = {Konzipieren }, language = {en} } @inproceedings{WardThorpePrice2004, author = {Ward, Michael and Thorpe, Tony and Price, Andrew}, title = {The Re-use of Site Data to Inform Business Processes}, doi = {10.25643/bauhaus-universitaet.130}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1308}, year = {2004}, abstract = {The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.}, subject = {Bauwerk}, language = {en} } @inproceedings{Walukiewicz2003, author = {Walukiewicz, Henryk}, title = {Identification of Structural Models as a Problem of Group Representation Theory}, doi = {10.25643/bauhaus-universitaet.372}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3725}, year = {2003}, abstract = {It has been shown that symmetries of moment functions of stochastic processes play an important role in identification of systems. They provide the group-theoretic method of choice of the model structure and model parameters. In the first stage the group-theoretic analysis of some fundamental concepts of stochastic dynamics: stochastic processes and functional series of Volterra-Wiener type has been undertaken. The analysis of group representations of the moment functions of order m for stochastic processes is the basic, original concept of the work. The following groups: symmetric Sm, special affine SAff(m), general linear GL(n, R), GL(n,C) and their subgroups play the main role in the models. In the second stage the informational entropy has been introduced as a measure of the randomness in the identified models. The group-theoretic approach underlines the unity of the nonlinear system identification and leads to useful engineering results in the range of the second-order (stochastic) theory.}, subject = {Bauwerk}, language = {en} } @article{Voronin1997, author = {Voronin, V. P.}, title = {Renovation's peculiarities of industrial enterprises in conditions of economic selfsufficiency}, doi = {10.25643/bauhaus-universitaet.529}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-5296}, year = {1997}, abstract = {Probleme of recrienfation of building complex, to the sharp increase of share of reconstruction works, capital repair and modernisation of in-dustrial plants are concidered in this work. The conception of develop-ment and creation of unitified system of expluatation and renovation of industrial plants are worded out. This system is based on date-computer technology and taking into conciderations of real economic relations.}, subject = {Bauwerk}, language = {en} } @article{SemenovAlekseevaTarlapan2004, author = {Semenov, Vitaly and Alekseeva, Elena and Tarlapan, Oleg}, title = {Virtual Construction using Map-based Approach}, doi = {10.25643/bauhaus-universitaet.244}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2447}, year = {2004}, abstract = {The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility...}, subject = {Produktmodell}, language = {en} } @inproceedings{Schultmann2003, author = {Schultmann, Frank}, title = {Projektplanungsmodelle und -methoden f{\"u}r den R{\"u}ckbau von Bauwerken}, doi = {10.25643/bauhaus-universitaet.16}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-162}, year = {2003}, abstract = {Vor dem Hintergrund einer sich versch{\"a}rfenden Umweltgesetzgebung sowie der Erkenntnis, dass Bauabf{\"a}lle sich grunds{\"a}tzlich f{\"u}r eine Stoffkreislauff{\"u}hrung eignen, hat der R{\"u}ckbau von Bauwerken in den letzten Jahren verst{\"a}rkt an Bedeutung gewonnen. Aufgrund oftmals strenger Zeit- und Kostenvorgaben f{\"u}r einen R{\"u}ckbau, begrenzter Verf{\"u}gbarkeit von Personal und Betriebsmitteln, einer weitgehenden Unikatfertigung sowie wechselnder Standorte kommt dabei der projektorientierten Planung von Maßnahmen auf der Baustelle große Bedeutung zu. Im Rahmen des Beitrages werden Ans{\"a}tze zur Modellierung und L{\"o}sung der sich hieraus ergebenden Probleme zur Planung und Optimierung von (R{\"u}ck-) Bauabl{\"a}ufen unter Verwendung von Projektplanungsmodellen und -methoden vorgestellt. Hierbei werden neben betriebswirtschaftlichen auch umweltrelevante sowie technische Fragestellungen im Zusammenhang mit der Planung von R{\"u}ckbauprojekten aufgegriffen. Eine Anwendung der Planungsans{\"a}tze auf reale Geb{\"a}ude zeigt, dass sich durch Kombination von Geb{\"a}uder{\"u}ckbau und Aufbereitungstechnik eine Qualit{\"a}tsverbesserung von Recyclingbaustoffen erzielen l{\"a}sst. Zur Umsetzung der hierzu erforderlichen Maßnahmen werden unter Ber{\"u}cksichtigung individueller abfallwirtschaftlicher Rahmenbedingungen der jeweiligen Planungsregion, geb{\"a}ude- und baustellenbezogener Besonderheiten, technischer sowie kapazitiver Restriktionen Ablaufpl{\"a}ne f{\"u}r den Geb{\"a}uder{\"u}ckbau berechnet. Die f{\"u}r unterschiedliche Planungsregionen vorgenommenen Modellrechnungen weisen nach, dass sich die Demontage von Geb{\"a}uden gegen{\"u}ber einem konventionellen Geb{\"a}udeabbruch unter bestimmten Rahmenbedingungen bereits wirtschaftlich vorteilhaft realisieren l{\"a}sst. Abgerundet wird der Beitrag durch einen Ausblick auf M{\"o}glichkeiten einer Realisierung komplexer Bauabl{\"a}ufe auch unter strengen Zeitvorgaben sowie bei begrenzten Platzverh{\"a}ltnissen mit Hilfe fertigungssynchroner Ressourceneinsatzplanung sowie auf die Ber{\"u}cksichtigung von Unsicherheiten in der Planung und Ausf{\"u}hrung von R{\"u}ckbauprojekten.}, subject = {Bauwerk}, language = {de} } @inproceedings{SchapkeScherer2004, author = {Schapke, Sven-Eric and Scherer, Raimar J.}, title = {A Four Layer Bayesian Network for Product Model Based Information Mining}, doi = {10.25643/bauhaus-universitaet.120}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1207}, year = {2004}, abstract = {Business and engineering knowledge in AEC/FM is captured mainly implicitly in project and corporate document repositories. Even with the increasing integration of model-based systems with project information spaces, a large percentage of the information exchange will further on rely on isolated and rather poorly structured text documents. In this paper we propose an approach enabling the use of product model data as a primary source of engineering knowledge to support information externalisation from relevant construction documents, to provide for domain-specific information retrieval, and to help in re-organising and re-contextualising documents in accordance to the user's discipline-specific tasks and information needs. Suggested is a retrieval and mining framework combining methods for analysing text documents, filtering product models and reasoning on Bayesian networks to explicitly represent the content of text repositories in personalisable semantic content networks. We describe the proposed basic network that can be realised on short-term using minimal product model information as well as various extensions towards a full-fledged added value integration of document-based and model-based information.}, subject = {Bauwerk}, language = {en} } @article{Rueppel1997, author = {R{\"u}ppel, Uwe}, title = {Multimediale Gestaltung von Bestandsverwaltungsprozessen im Bauwesen}, doi = {10.25643/bauhaus-universitaet.483}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4839}, year = {1997}, abstract = {Die Kosten f{\"u}r die Unterhaltung von Bauwerken {\"u}ber den Lebenszyklus sind im Vergleich zu den Planungs- und Herstellungskosten erheblich gr{\"o}ßer. Insbesondere setzt eine Reduzierung des Instandhaltungsaufwandes als Teilprozeß der Bestandsverwaltung das rechtzeitige Erkennen von Bausch{\"a}den und das vorausschauende Ergreifen von Gegenmaßnahmen voraus. Das planm{\"a}ßige Vorgehen beim Erkennen von Bausch{\"a}den, d.h. die regelm{\"a}ßige {\"U}berwachung baulicher Anlagen, dient nicht nur dem sparsamen Umgang mit vorhandenen Mitteln, sondern verringert auch die Gefahr des pl{\"o}tzlichen Versagens von tragenden Bauteilen. Dadurch werden Gefahren f{\"u}r die Nutzer der Bauwerke fr{\"u}hzeitig abgewendet. Die Notwendigkeit der systematischen Instandhaltung mit modernen Methoden wird auch in den Schlußfolgerungen des dritten Bauschadensberichts des Bundesministeriums f{\"u}r Raumordnung, Bauwesen und St{\"a}dtebau unterstrichen. Um den Zustand eines Bauteils festzustellen, werden ausreichende Informationen {\"u}ber Struktur, Material, Alter, Belastungen, Umweltbedingungen etc. ben{\"o}tigt. Zur Verarbeitung dieser F{\"u}lle von Informationen unterschiedlichen Typs (z.B. technische Dokumente, CAD-Zeichnungen, Photos etc.) bei der {\"U}berwachung und Dokumentation baulicher Anlagen ist eine geeignete DV-Unterst{\"u}tzung notwendig. Zur Verwaltung der komplexen Baustrukturinformationen werden objektorientierte Bauwerksmodelle ben{\"o}tigt. Zur bedarfsgerechten Aufbereitung der unterschiedlichen Informationsarten und -qualit{\"a}ten ist zus{\"a}tzlich eine multimediale Informationsverarbeitung sowohl intern als auch in der Benutzungsschnittstelle erforderlich. Im Beitrag werden die Grundlagen objektorientierter Methoden zur Bauwerksmodellierung sowie von Multimedia mit den Bereichen Text, Graphik (Vektor- und Pixelgraphik), Audio, Photo und Video einschließlich deren Verkn{\"u}pfungsm{\"o}glichkeiten im Sinne von Hypermedia an Beispielen erl{\"a}utert. Zus{\"a}tzlich werden aktuelle Entwicklungstendenzen im Bereich der Telekommunikation mit den M{\"o}glichkeiten des Computernetzes INTERNET zur Bestandsverwaltung in verteilten Systemen aufgezeigt. Abschließend werden Anwendungen der objektorientierten und multimedialen Informationsverarbeitung in der t{\"a}glichen Ingenieurpraxis am Beispiel des DV-Systems BestandManager zur {\"U}berwachung und Dokumentation baulicher Anlagen vorgestellt.}, subject = {Bauwerk}, language = {de} } @inproceedings{RombergTreeckNiggl2003, author = {Romberg, Richard and Treeck, Christioph van and Niggl, Andreas}, title = {Numerische Simulation auf Basis des IFC-Bauwerksmodells}, doi = {10.25643/bauhaus-universitaet.352}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3521}, year = {2003}, abstract = {Dieser Beitrag zeigt einen Ansatz, verschiedene numerische Simulationsaufgaben auf ein gemeinsames und durchg{\"a}ngig dreidimensionales Geometriemodell zu gr{\"u}nden. Hinsichtlich der physikalischen Modelle reicht die Bandbreite der hier vorgestellten Anwendungen von einer ganzheitlichen Betrachtung der Geb{\"a}udestruktur in der Strukturmechanik {\"u}ber die raumbezogene, hochaufl{\"o}sende Modellierung konvektiver Raumluftstr{\"o}mungen bis hin zur Simulation des thermischen Verhaltens eines ganzen Geb{\"a}udes. Das jeweils zugrunde liegende numerische Verfahren setzt dabei auf einem stets gleichen Zwischenmodell der realen Geometrie der Struktur auf, ohne dabei vereinfachende dimensionsreduzierte Modelle anzuwenden. Nachfolgende Werkzeuge werden derzeit im Rahmen mehrerer Forschungsprojekte an dieses Geometriemodell angeschlossen: Die p-Version der FEM f{\"u}r die Strukturanalyse, ein sog. Mehrzonenmodell f{\"u}r die thermische Geb{\"a}udesimulation sowie ein auf dem sog. hybriden thermischen Gitter-Boltzmann-Verfahren (hTLBE) basierender Str{\"o}mungssimulationscode. Der Import geometrischer wie semantischer Daten eines Bauwerks in das Simulations-Framework erfolgt nach dem Produktmodell der Industry Foundation Classes (IFC), das sich als Quasi-Standard f{\"u}r den Datenaustausch im Bauwesen etabliert hat. Das IFC-Schema dient dabei nicht als Modell zur internen Speicherung von Daten, sondern wird hier als Schnittstelle zur Anbindung unterschiedlicher Programme wie CAD-Anwendungen f{\"u}r Architekten oder anderen Modellierungstools verwendet. Die Implementierung dieser Schnittstelle erfolgt unter Verwendung einer sog. Toolbox, die das Objektschema der IFC auf ein Klassenmodell einer objektorientierten Programmiersprache abbildet und Werkzeuge f{\"u}r den effizienten Objektzugriff zur Verf{\"u}gung stellt. Damit werden Grenzen zwischen spezialisierten Softwarepaketen, die maßgeschneidert auf spezielle Erfordernisse ausgerichtet sind, aufgebrochen und der Datenaustausch {\"u}ber die Anwendungsgrenzen hinaus unterst{\"u}tzt. Dies ist eine Konsequenz aus einer dem Wunsch nach vernetzt-kooperativen Planung von Bauwerken....}, subject = {Bauwerk}, language = {de} } @inproceedings{RaueWeitzmann2004, author = {Raue, Erich and Weitzmann, R{\"u}diger}, title = {Analysis and Design of Hybrid Structures using Optimization Strategies}, doi = {10.25643/bauhaus-universitaet.102}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1023}, year = {2004}, abstract = {The paper gives a general overview and concerns with a specified set of computer-aided analysis modules for hybrid structures loaded by extreme excitations. All problems are solved by methods of linear, quadratic or nonlinear mathematical optimization, that leads to very effective and economic design solutions. All approaches are derived from general optimization problem that can be easily altered to conform to specific design tasks. Some advantages and possibilities of hybrid structural modeling (single or mixed model-supported) are discussed. The methods will be illustrated by an example structure and optimization schemes.}, subject = {Konzipieren }, language = {en} } @inproceedings{RaueTimmlerSchueler1997, author = {Raue, Erich and Timmler, Hans-Georg and Sch{\"u}ler, H.}, title = {Anwendung der mathematischen Optimierung bei der physikalisch und geometrisch nichtlinearen Analyse und Bemessung seismisch beanspruchter Tragwerke}, doi = {10.25643/bauhaus-universitaet.442}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4421}, year = {1997}, abstract = {Moderne Bemessungskonzepte f{\"u}r seismisch beanspruchte Hochbauten, wie die Methode der Kapazit{\"a}ts-bemessung, planen inelastisches Verhalten einzelner Bereiche der Konstruktion beim Entwurf bewußt ein, um so einen Teil der durch das Beben eingetragenen Energie als inelastische Form{\"a}nderungsarbeit zu absorbieren. Wird bei Akzeptanz inelastischen Verhaltens eine bestimmte Belastungsintensit{\"a}t, die als adaptive Grenzlast oder Einspiellast bezeichnet wird, {\"u}berschritten, kann es infolge zyklischer Einwirkungen zu einer unbe-grenzten Akkumulation inelastischer Deformationen kommen. Die adaptive Grenzlast stellt damit f{\"u}r zyklische Einwirkungen eine geeignete Kenngr{\"o}ße zur Bewertung der Tragwerksqualit{\"a}t dar, bei der neben der Sicherung des Gleichgewichts ein bestimmtes Sch{\"a}digungsniveau nicht {\"u}berschritten wird. Im vorliegenden Beitrag werden die Grundz{\"u}ge eines Bemessungs- und Nachweiskonzeptes f{\"u}r seismisch beanspruchte Stahlbetontragwerke, das unter Einbeziehung der Grundprinzipe der Kapazit{\"a}tsbemessung von einem einheitlichen Kriterium zur Beschreibung des Grenzzustandes der Tragf{\"a}higkeit auf der Basis der adaptive Grenzlast ausgeht, vorgestellt. Dabei ist die Absch{\"a}tzung der Verformungen notwendiger Bestandteil des Nachweis- bzw. Bemessungskonzeptes. Bei Druckgliedern ist die Ber{\"u}cksichtigung des Einflusses der Verformungen notwendiger Bestandteil des Bemessungskonzeptes. Entsprechende Erweiterungen der Berechnungsmodelle zur Ber{\"u}cksichtigung des Einflusses geometrisch nichtlinearer Effekte im Sinne einer Theorie II. Ordnung werden vorgestellt.}, subject = {Bauwerk}, language = {de} } @inproceedings{PetzoldDonath2004, author = {Petzold, Frank and Donath, Dirk}, title = {The building as a container of information : the starting point for project development and design formulation}, doi = {10.25643/bauhaus-universitaet.184}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1848}, year = {2004}, abstract = {For planning in existing built contexts, the building survey is the starting point for initial planning proposals, for the diagnosis and documentation of building damages, for the creation of objectives catalogues, for the detailed design of renovation and conversion measures and for ensuring fulfilment of building legislation, particularly by change of use and refitting. An examination of currently available IT-tools shows insufficient support for planning within existing contexts, most notably a deficit with regard to information capture and administration. This paper discusses the concept for a modular surveying system (basic concept, separation of geometry from semantic data, and separation into sub-systems) and the prototypical realisation of a system for the complete support of the entire building surveying process for existing buildings. The project aims to contribute to the development of a planning system for existing buildings. ...}, subject = {Architektur}, language = {en} } @inproceedings{PetkovChristov2003, author = {Petkov, Zdravko B. and Christov, Christo T.}, title = {Response Spectra Evaluation Including Pounding Effect}, doi = {10.25643/bauhaus-universitaet.346}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3464}, year = {2003}, abstract = {Most of the existing seismic resistant design codes are based on the response spectrum theory. The influence of inelastic deformations can be evaluated by considering inelastic type of resisting force and then the inelastic spectrum is considerably different from the elastic one. Also, the influence of stiffness degradation and strength deterioration can be accounted for by including more precise models from material point of view. In some recent papers the corresponding changes in response spectra due to the P- {\"A} effect are discussed. The experience accumulated from the recent earthquakes indicates that structural pounding may considerably influence the response of structures and should be taken into account in design procedures. The most convenient way to do that is to predict the influence of the pounding on the response spectra for accelerations, velocities and displacements. Generally speaking the contact problems such as pounding are characterized by large extent of nonlinearity and slow convergence of the computational procedures. Thus obtaining spectra where the contact problem is accounted for seems very attractive from engineering point of view because could easy be implemented into the design procedures. However it is worth nothing that there is not rigorous mathematical proof that the original system can be decomposed into single equations related to single degree of freedom systems. It is the porpose of the paper to study the influence of the pounding on the response spectra and to evaluate the amplification due to the impact. For this purpose two adjacent SDOF systems are considered that are able to interact during the vibration process. This problem is solved versus the elastic stiffness ratio, which appears to be very important for such assemblage. The contact between masses is numerically simulated using opening gap elements as links. Comparisons between calculated response spectra and linear response spectra are made in order to derive analytical relationships to simply obtain the contribution of pounding. The results are graphically illustrated in response spectra format and the influence of the stiffness ratio is clarified.}, subject = {Bauwerk}, language = {en} } @inproceedings{PetersenSeewald2004, author = {Petersen, Michael and Seewald, Gerrit}, title = {Establishing of fundamentals in building projects using web services}, doi = {10.25643/bauhaus-universitaet.127}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1273}, year = {2004}, abstract = {During the establishing of fundamentals in a building project a huge amount of influence factors and boundary conditions have to be investigated in order to provide the prerequisites for further planning processes. These investigative tasks are often related with a great effort concerning time and money, because there are no standardized workflows and interfaces which provide an efficient access to the necessary information related to a specific construction site. Within the fundamental investigation human and natural circumstances have to be taken into account. Thus, in this project two examples have been chosen in order to demonstrate the holistic approach for an integration and provision of georeferenced information. The developed internet-site http://www.grundlagenermittlung.de has been designed to support architects and civil engineers in early planning phases of a building project efficiently. It offers web-based services based on dynamic interfaces for a flexible search and collection of information concerning the building site. Therefore, a central Metadatabase-Server for Description, Discovery and Integration has been established which enables a registration of georeferenced services and the redirection of incoming requests to other, distributed data pools. Using this Yellow-Page concept in combination with the underlying meta-data based on the ISO 19115 standard an efficient investigation of geographical and environmental information becomes possible.}, subject = {Bauwerk}, language = {en} } @article{PetersPetersenMeissner1997, author = {Peters, F. and Petersen, Michael and Meißner, Udo F.}, title = {Bestandsverwaltung und -bewirtschaftung durch integratives Informationsmanagement}, doi = {10.25643/bauhaus-universitaet.484}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4848}, year = {1997}, abstract = {Neben der reinen Bauausf{\"u}hrung und den damit verbundenen Roh- und Ausbaukosten stellt insbesondere die Bewirtschaftung von Geb{\"a}uden einen wesentlichen Kostenfaktor dar, den zu minimieren Ziel der Bestrebungen auf dem Gebiet des Facilities Management ist. Insbesondere die Integration der verteilt vorliegenden Informationen muß hierbei das Ziel sein, um durch effiziente Informationsverarbeitung eine Einsparung von Unterhaltskosten zu erreichen. Bereits in der Planungsphase lassen sich die sp{\"a}teren Kosten f{\"u}r die Bewirtschaftung modellieren. Dies gilt auch f{\"u}r die Modellierung des Energiehaushaltes von Geb{\"a}uden. F{\"u}r die Modellierung des W{\"a}rmeschutzes und der damit verbundenen Ermittlung des Heizenergiebedarfs werden z.Zt. starke Vereinfachungen getroffen, die durch die aktuelle W{\"a}rmeschutzverordnung vorgegeben sind, so daß die errechneten Werte meist sehr ungenau sind. F{\"u}r eine DV-gerechte Modellierung eines Geb{\"a}udes w{\"a}hrend seiner Bewirtschaftung reichen herk{\"o}mmliche CAD-Systeme nicht aus, da das Modell verschiedene Sichten zulassen muß: Neben einer bauteilorientierten Sicht muß auch eine raumorientierte Sicht vorgehalten werden, damit eine Modellierung von fl{\"a}chenbezogenen Parametern wie z.B. Kosten m{\"o}glich wird. Dieser Beitrag zeigt einen Ansatz, der eine intensive Nutzung heterogener Ressourcen und Informationen auf der Grundlage eines dreidimensionalen Geb{\"a}udemodells erm{\"o}glicht. Exemplarisch f{\"u}r die Bereiche Raummanagement (im Sinne von kosten- und nutzungsorientierter Bestandsverwaltung) und Bauphysik wird dieser Ansatz erl{\"a}utert und die Eingliederung dieser Teilgebiete der Bestandsverwaltung und -bewirtschaftung in ein Gesamtsystem aufgezeigt.}, subject = {Bauwerk}, language = {de} } @inproceedings{PengLawLau2004, author = {Peng, Jun and Law, Kincho and Lau, Gloria}, title = {Internet-Enabled Software Model for Nonlinear Structural Analysis and Simulations}, doi = {10.25643/bauhaus-universitaet.105}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1057}, year = {2004}, abstract = {This paper describes an Internet-enabled software model that could facilitate the development and utilization of nonlinear structural analysis programs. The software model allows users easy access to the analysis core program and the analysis results by using a web-browser or other application programs. In addition, new and legacy codes can be incorporated as distributed services and be integrated with the software framework from disparate sites. A distributed project management system, taking advantages of Internet and database technologies, is implemented to store and manage model information and simulation results. Nonlinear dynamic analysis and simulations of a bridge structure is performed to illustrate the facilities of the Internet-enabled software model.}, subject = {Konzipieren }, language = {en} } @inproceedings{Pavlov2004, author = {Pavlov, Alexander}, title = {Data Transfer and Objects Recognition in Building Design}, doi = {10.25643/bauhaus-universitaet.126}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1265}, year = {2004}, abstract = {The problem of data interoperability is now very important. The formal description of construction systems and objects must base upon the modeling for the description of construction data domain. The XML-language was selected as a basis of a universal data format, ensuring natural hierarchy of objects, flexibility, good layout and expandability. The language, developed by the author, is called Building Object Description Extensible Markup Language (bodXML). The types of all objects used by data transfer should be definite beforehand with existing methods of programming. It limits the possibilities of IT in application of new types. But the recipient software must recognize the building objects even if the kind of object is unknown at the outset. The author offers a set of main topological and geometric properties being sufficient for recognition of main three-dimensional building constructions with flat edges. The tests of artificial neuron network have shown that the recognition of a kind of the constructions represented as a set of indicated parameters happens enough confidently.}, subject = {Bauwerk}, language = {en} } @inproceedings{ParmeeAbraham2004, author = {Parmee, Ian and Abraham, Johnson}, title = {User-centric Evolutionary Design Systems - the Visualisation of Emerging Multi-Objective Design Information}, doi = {10.25643/bauhaus-universitaet.109}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1094}, year = {2004}, abstract = {The paper describes further developments of the interactive evolutionary design concept relating to the emergence of mutually inclusive regions of high performance design solutions. These solutions are generated from cluster-oriented genetic algorithm (COGAs) output and relate to a number of objectives introduced during the preliminary design of military airframes. The data-mining of multi-objective COGA (moCOGA) output further defines these regions through the application of clustering algorithms, data reduction and variable attribute relevance analyses. A number of visual representations of the COGA output projected onto both variable and objective space are presented. The multi-objective output of the COGA is compared to output from a Strength Pareto Evolutionary Algorithm (SPEA-II) to illustrate the manner in which moCOGAs can generate good approximations to Pareto frontiers.}, subject = {Konzipieren }, language = {en} } @inproceedings{O'BrienDansoAmoakoIssa2004, author = {O'Brien, William and Danso-Amoako, Mark and Issa, Raja}, title = {A Case Study of IFC and CIS/2 Support for Steel Supply Chain Processes}, doi = {10.25643/bauhaus-universitaet.119}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1195}, year = {2004}, abstract = {The evolution of data exchange and integration standards within the Architectural, Engineering and Construction industry is gradually making the long-held vision of computer-integratedconstruction a reality. The Industry Foundations Classes and CIMSteel Integration Standards are two such standards that have seen remarkable successes over the past few years. Despite successes, these standards support the exchange of product data more than they do process data, especially those processes that are loosely coupled with product models. This paper reports on on-going research to evaluate the adequacy of the IFC and CIS/2 standards to support process modeling in the steel supply chain. Some initial recommendations are made regarding enhancements to the data standards to better support processes.}, subject = {Bauwerk}, language = {en} } @inproceedings{NourBeucke2003, author = {Nour, Mohamed and Beucke, Karl}, title = {Object Information Packs as a Base for Information Modelling in Construction}, doi = {10.25643/bauhaus-universitaet.338}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3387}, year = {2003}, abstract = {The construction industry is suffering form the existence of isolated islands of software applications and bottle neck solutions. The idea of an integrated virtual database that consists of separated platforms, representing various disciplines, depending on the web technology is envisaged to solve the problem of integration. This paper is about the production and use of OIPs (Object Information Packs) as a part of the construction material product in the form of XML files that include all the technical and commercial data of the product, which might be needed by any discipline in its overall life cycle. This object information pack is neutral and independent of any software application. It is assumed to fit in a building product model at the IFC (resource layer). An example of brick - wall aggregation process is used to demonstrate the capability of the technology and the ability of non computer science experts to use it.}, subject = {XML}, language = {en} } @article{NgoRueppel1997, author = {Ngo, D. Q. and R{\"u}ppel, Uwe}, title = {BINAS - Ein Entscheidungshilfesystem f{\"u}r die Bestandsanalyse von Bauwerken}, doi = {10.25643/bauhaus-universitaet.499}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4994}, year = {1997}, abstract = {Bauwerke sind in ihrer Betriebszeit vielen nutzungseinschr{\"a}nkenden Einfl{\"u}ssen ausgesetzt. Die dadurch erforderliche Instandhaltung dient zur Gew{\"a}hrleistung und zur Erh{\"o}hung der geplanten Nutzungsf{\"a}higkeit sowie Dauerhaftigkeit von Bauwerken. Sie spielt eine immer gr{\"o}ßere Rolle im Bauwesen. Die Kosten der Bauwerksinstandhaltung betragen je nach Art des Bauwerkes in Deutschland pro Jahr ca. 1-6\% des Wiederbeschaffungswertes. Die Reduzierung des Instandhaltungsaufwandes durch Technik- und Management-Maßnahmen ist daher wirtschaftlich sinnvoll. Der Einsatz moderner Informations- und Kommunikationstechnologie auf dem Gebiet der Bestandsaufnahme und -analyse ist erforderlich, um einerseits die Bearbeitung von multimedialen Informationen {\"u}ber Ist- und Soll-Zust{\"a}nde von Bauwerken effektiver durchzuf{\"u}hren und um andererseits die Analyse von Sch{\"a}den im Sinne einer Entscheidungshilfe zu unterst{\"u}tzen. Durch den Einsatz der WWW-Technologie kann die Bearbeitung auch verteilt im Datennetz {\"u}ber ferne Rechner hinweg erfolgen. Im Beitrag werden die Konzeptionierung und Implementierung des WWW-f{\"a}higen DV-Systems BINAS zur Unterst{\"u}tzung der Bestandsaufnahme und -analyse sowie die daf{\"u}r erforderlichen Methoden und Werkzeuge vorgestellt.}, subject = {Bauwerk}, language = {de} } @inproceedings{MilesCenTaylor2004, author = {Miles, John and Cen, Mei and Taylor, Mark}, title = {Linking Sketching and Constraint Checking for Early Conceptual Design}, doi = {10.25643/bauhaus-universitaet.1548}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1547}, year = {2004}, abstract = {At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients.}, subject = {Konzipieren }, language = {en} } @inproceedings{MenzelGarrettMahdavietal.1997, author = {Menzel, Karsten and Garrett, James H. and Mahdavi, A. and Ries, R.}, title = {Processing "fuzzy" materials sets for environmental impact analysis of buildings}, doi = {10.25643/bauhaus-universitaet.450}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4500}, year = {1997}, abstract = {Processing technical and environmental data on building materials, components, and systems has become more important during the last few years. Increased sensitivity towards environmental and energy problems has lead to the demand for simulation and evaluation of the long term behavior of buildings. The results of such simulations are expected to enable architects and engineers to develop a broader, interdisciplinary understanding of the impact of their products (buildings) on the environment. However, conducting such evaluations is currently hampered by the lack of comprehensive, up-to-date, and ecologically relevant data on building materials, components, and systems. To address this problem, this paper proposes an approach to deal with the absent or uncertain attributes of building materials, components, and systems. In the past, various information systems have been developed to provide data on a limited set of building materials, including precise values pertaining to some of their characteristics, such as availability, manufacturers, costs, etc. These traditional information systems have difficulty in dealing with uncertain, incomplete and sparse data. However, uncertainty and incompleteness characterize the nature of most of the available and environmentally related characteristics of materials, components, and systems. In this paper, a fuzzy-logic-based augmentation of traditional information systems is proposed towards providing management, utilization and manipulation of incomplete and uncertain data.}, subject = {Bauwerk}, language = {en} } @inproceedings{MaWongYang2004, author = {Ma, Zhiliang and Wong, K. D. and Yang, Jun}, title = {An Approach to Utilizing Exchanged Documents in Construction Projects Based on Data Warehouse Technology}, doi = {10.25643/bauhaus-universitaet.122}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1227}, year = {2004}, abstract = {There are many construction projects in China and mass documents are exchanged among the multi-party, including the owner, the contractor and the engineer in the projects. Based on previous studies, an approach to the utilization of the exchanged documents is established by using data warehouse technology and a prototype system called EXPLYZER is developed. The approach and the prototype system are verified through their application in a construction project. It is concluded that the approach can support the decision-making in project management.}, subject = {Bauwerk}, language = {en} } @inproceedings{LiuSoibelmanWu2004, author = {Liu, Liang and Soibelman, Lucio and Wu, Jianfeng}, title = {Data Fusion and Modeling for Construction Management Knowledge Discovery}, doi = {10.25643/bauhaus-universitaet.125}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1254}, year = {2004}, abstract = {Advances in construction data analysis techniques have provided useful tools to discover explicit knowledge on historical databases supporting project managers' decision making. However, in many situations, historical data are extracted and preprocessed for knowledge discovery based on time-consuming and problem-specific data preparation solutions, which often results in inefficiencies and inconsistencies. To overcome the problem, we are working on the development of a new data fusion methodology, which is designed to provide timely and consistent access to historical data for efficient and effective management knowledge discovery. The methodology is intended to be a new bridge between historical databases and data analysis techniques, which shields project managers from complex data preparation solutions, and enables them to use discovered knowledge for decision making more conveniently. This paper briefly describes the motivation, the background and the initial results of the ongoing research.}, subject = {Bauwerk}, language = {en} } @inproceedings{LenzenWaller2003, author = {Lenzen, Armin and Waller, Heinz}, title = {Deterministische und stochastische Systemidentifikation mit Methoden der linearen Algebra zur Formulierung von mathematischen Modellen im Lebensdauerzyklus von Bauwerken}, doi = {10.25643/bauhaus-universitaet.12}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-125}, year = {2003}, abstract = {Werden Bauwerke f{\"u}r eine begrenzte Lebensdauer ausgelegt, kann es sinnvoll sein, die Tragf{\"a}higkeit von Tragkonstruktionen zu {\"u}berwachen, um Sch{\"a}den zu vermeiden und eine sichere Funktionsweise zu gew{\"a}hrleisten. Die {\"U}berwachung, hier auf Basis von Schwingungen der Struktur, wird zumeist von einer rechnergest{\"u}tzten Messtechnik automatisch durchgef{\"u}hrt. Der Computer {\"u}berpr{\"u}ft spezielle physikalische Kennwerte oder Kennfunktionen des Tragwerks auf Ver{\"a}nderungen. Eine Sch{\"a}digung ruft eine Ver{\"a}nderung hervor. Aufgabe der Systemidentifikation ist es, eine solche Ver{\"a}nderung zu erkennen. Eine Modellbildung kann z.B. auf theoretischer Basis als Finite Element Modellierung, oder als Black Box Modellierung aus Messwerten mit der Methodik der deterministischen oder stochastischen Systemidentifikation vorgenommen werden. In diesem Aufsatz werden die Analyse allgemeiner deterministischer und stochastischer Erregungen und deren Schwingungsantworten zur Modellbildung und Systemidentifikation beschrieben. Als Anwendungsbeispiele f{\"u}r die Bauwerks{\"u}berwachung werden Methoden zur Schadens-Erfassung und -Lokalisation vorgestellt. Den Abschluss bilden Ausf{\"u}hrungen zur numerischen Modellierung von Windlasten als stochastischen Prozess und der Kopplung dieser Modelle mit finiten Element-Modellen, um eine bessere Absch{\"a}tzung der Lebensdauer eines Bauwerks schon im Entwurfsprozess zu erm{\"o}glichen.}, subject = {Bauwerk}, language = {de} } @inproceedings{LaabsPahl1997, author = {Laabs, Andreas and Pahl, Peter Jan}, title = {Das Beobachterkonzept zum Erhalt der Konsistenz in Datenmodellen}, doi = {10.25643/bauhaus-universitaet.431}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4310}, year = {1997}, abstract = {Die Aufgaben des Bauingenieurwesens sind dadurch gepr{\"a}gt, daß sowohl die Planung als auch die Ausf{\"u}hrung von Bauwerken h{\"a}ufigen {\"A}nderungen unterliegen. Beschreibt man das Verhalten der Bauwerke und den Bauprozeß im Computer mit Modellen, so {\"a}ndern sich Umfang und Struktur der Modelle als Folge der {\"A}nderung in Planung und Ausf{\"u}hrung. Diesen Vorgang nennt man Dynamisierung des Modells. Die Dynamisierung f{\"u}hrt zu Ver{\"a}nderungen und Inkonsistenzen in den Modellen der Anwendungen. Die Aktualisierung und Abstimmung von Beziehungen innerhalb eines Modells sowie die Sicherung der Konsistenz der Modelle untereinander sind daher von zentraler Bedeutung f{\"u}r die L{\"o}sung von Bauingenieuraufgaben. Seit den letzten 10 Jahren wird die objektorientierte Methode in der Modellierung f{\"u}r Anwendungen im Bauingenieurwesen intensiv entwickelt und eingesetzt. Es hat sich gezeigt, daß die Anwendung dieser Methode in wichtigen Bereichen der Modellierung zu Verbesserungen f{\"u}hrt. Gleichzeitig hat sich aber auch herausgestellt, daß die f{\"u}r das Bauingenieurwesen wichtigen Aspekte der Aktualisierung und der Konsistenz nicht zweckm{\"a}ßig beschreibbar sind. In diesem Beitrag wird eine einfache Modelliermethode in ihrem Konzept und ihrer Realisierung gezeigt, mit der sich die Aktualisierung von Objekten und Modellen sowie die Sicherstellung der Konsistenz in Systemen des Bauingenieurwesens bearbeiten lassen.}, subject = {Bauwerk}, language = {de} } @inproceedings{KolbeRanglackSteinmann1997, author = {Kolbe, P. and Ranglack, D. and Steinmann, Frank}, title = {Eine Schnittstelle f{\"u}r dynamische Objektstrukturen f{\"u}r Entwurfsanwendungen}, doi = {10.25643/bauhaus-universitaet.455}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4555}, year = {1997}, abstract = {Trotz der langj{\"a}hrigen Erfahrung bei der Anwendung objektorientierter Konzepte bei der Modellierung von Geb{\"a}uden ist es bisher nicht gelungen, ein allgemein anerkanntes Geb{\"a}udemodell im Rechner abzubilden. Das mag zum einen daran liegen, daß die Standardisierung eines solchen Modells bis heute zu keinem Abschluß gekommen ist. Zum anderen aber scheint vor allem die Problematik der Abbildung eines solchen Geb{\"a}udemodells in das Objektmodell einer Programmiersprache bisher untersch{\"a}tzt worden zu sein. Die erhoffte Durchg{\"a}ngigkeit von objektorientierter Analyse, Entwurf und Programmierung gelingt bei Anwendungen f{\"u}r Entwurfsaufgaben nicht. Das gilt vor allem f{\"u}r Anwendungen, die fr{\"u}he Entwurfsphasen unterst{\"u}tzen und damit erst zur Definition eines Geb{\"a}udemodells beitragen. Im Bereich der Softwareentwicklung wird das Konzept des Objektes als Ordnungsbegriff zur Strukturierung von Softwaremodulen benutzt. Die {\"U}bertragung dieser Ordnung in die Welt des Ingenieurs oder Architekten zur Bezeichnung eines konkreten Elements aus einem Modell (Raum 42 aus der Menge aller R{\"a}ume des Geb{\"a}udes Blumenstraße 7) kann daher nur zu begrenzten Erfolgen f{\"u}hren. Aus der Analyse der Widerspr{\"u}chlichkeit des Objektbegriffs zwischen Softwareentwickler (Programmierer) und Softwareanwender (Ingenieur, Architekt) wird im folgenden ein Laufzeitsystem f{\"u}r dynamische Objektstrukturen entwickelt, das es dem Softwareentwickler erlaubt, sowohl auf die Struktur als auch auf die Auspr{\"a}gung eines Modells zuzugreifen. Dem Softwareanwender k{\"o}nnen damit Werkzeuge zur Verf{\"u}gung gestellt werden, die es ihm gestatten, Geb{\"a}udemodelle zu definieren. Das Laufzeitsystem enth{\"a}lt zum einen eine Reihe von Klassen, die es erm{\"o}glichen, die Struktur von Anwenderobjekten dynamisch zu beschreiben und zu analysieren. Eine zweite Art von Klassen erlaubt das Erzeugen und Ver{\"a}ndern von Anwenderobjekten, die diesen Strukturen entsprechen}, subject = {Bauwerk}, language = {de} } @inproceedings{KohlerBodin2003, author = {Kohler, Niklaus and Bodin, Olivier}, title = {Dealing with sensitivity and uncertainty analysis in integrated buildung LCA model : Dealing with Uncertainty in Life Cyle Analysis of Building Model by Using Experiment Design Methods}, doi = {10.25643/bauhaus-universitaet.322}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3220}, year = {2003}, abstract = {Building design, realization, operation and refurbishment have to take into account the environmental impacts as well as the resulting costs over a long period of time. LCA methods had to be developed for buildings because of their complexity, their long life duration and through a large number of actors who are involved. This was realized by integrating life cycle analysis, life cycle costing and building product models in integrated LCA models. However the use of such models leads to difficulties. The principal ones are the uncertainty treatment in LCA models and the lack of experience of practitioners who are not LCA specialists. Answers to these problems are the management of uncertainty and the development of simplified models for building design, construction and operation. This can be achieved with the mean of experimental plans or Monte Carlo simulation. The paper will focus on how these techniques can be used, what are their possibilities and disadvantages, particularly concerning the development of simplified models.}, subject = {Bauwerk}, language = {en} } @article{KiviniemiFischer2004, author = {Kiviniemi, Arto and Fischer, Martin}, title = {Requirements Management Interface to Building Product Models}, doi = {10.25643/bauhaus-universitaet.242}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2427}, year = {2004}, abstract = {In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...}, subject = {Produktmodell}, language = {en} } @inproceedings{JianpingTianyiQiping2004, author = {Jianping, Zhang and Tianyi, Ma and Qiping, Shen}, title = {Application of Data Warehouse and Data Mining in Construction Management}, doi = {10.25643/bauhaus-universitaet.124}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1247}, year = {2004}, abstract = {All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper.}, subject = {Bauwerk}, language = {en} } @inproceedings{HuebnerWalhornKoelke2003, author = {H{\"u}bner, Bj{\"o}rn and Walhorn, Elmar and K{\"o}lke, Andreas}, title = {Simultane L{\"o}sung gekoppelter Struktur-Fluid-Systeme}, doi = {10.25643/bauhaus-universitaet.311}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3114}, year = {2003}, abstract = {Ein simultanes L{\"o}sungsverfahren f{\"u}r Fluid-Struktur-Wechselwirkungen aus dem Bereich des Bauingenieurwesens wird vorgestellt. Die Modellierung der Tragwerksdynamik erfolgt mit der geometrisch nichtlinearen Elastizit{\"a}tstheorie in total Lagrangescher Formulierung. Die Str{\"o}mung wird mit den inkompressiblen Navier-Stokes-Gleichungen beschrieben. Wenn Turbulenzeffekte massgeblich sind, kommen die Reynolds-Gleichungen in Verbindung mit dem k-omega-Turbulenzmodell von Wilcox zum Einsatz. Zur Beschreibung von komplexen freien Oberfl{\"a}chen wird die Level-Set-Methode eingesetzt. Die einheitliche Diskretisierung von Fluid und Struktur mit der Raum-Zeit-Finite-Element-Methode f{\"u}hrt zu einem konsistenten Berechnungsmodell f{\"u}r das gekoppelte System. Da die isoparametrischen Raum-Zeit-Elemente ihre Geometrie in Zeitrichtung {\"a}ndern k{\"o}nnen, erlaubt die Methode eine nat{\"u}rliche Beschreibung des infolge der Strukturbewegung zeitver{\"a}nderlichen Str{\"o}mungsgebiets. Die gewichtete Integralformulierung der Kopplungsbedingungen mit globalen Freiwerten f{\"u}r die Interface-Spannungen sichert eine konservative Kopplung von Fluid und Struktur. Ausgew{\"a}hlte Anwendungsbeispiele zeigen die Leistungsf{\"a}higkeit der entwickelten Methodik und belegen die guten Konvergenzeigenschaften des simultanen L{\"o}sungsverfahrens.}, subject = {Bauwerk}, language = {de} } @phdthesis{Huth2002, author = {Huth, Olaf}, title = {Ein adaptiertes Polyreferenz-Verfahren und seine Anwendung in der Systemidentifikation}, doi = {10.25643/bauhaus-universitaet.3}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20040202-34}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2002}, abstract = {Die vorliegende Arbeit gliedert sich in das Gebiet der Systemidentifikation ein. Besonderes Augenmerk wird auf die Detektion, die Lokalisierung und die Quantifizierung von Systemver{\"a}nderungen gerichtet. F{\"u}r diese Ziele werden -basierend auf Schwingungsmessungen- modale Parameter sowie Ein- und Ausgangsgr{\"o}ßen im Frequenzbereich extrahiert. Die in dieser Arbeit entwickelte Adaption des Polyreferenz-Verfahrens beruht auf einer ver{\"a}nderten Bestimmung der Fundamentalmatrix mit Hilfe der verallgemeinerten Singul{\"a}rwertzerlegung. Eine Vorfilterung, die eine Reduktion der Frequenzanteile im Signal bewirkt, ist dabei Voraussetzung. Diese basiert auf dem Einsatz rekursiver Filtertechiken und der einfachen Singul{\"a}rwertzerlegung. Als Resultat k{\"o}nnen modale Parameter auch im Falle, wenn eng benachbarte und verrauschte Signalanteile vorliegen oder nur wenige Mess- und Anregungspunkte zur Verf{\"u}gung stehen, pr{\"a}zise bestimmt und damit auch sehr geringe Syemver{\"a}nderungen detektiert werden. Die mit dem adaptierten Polyreferenz-Verfahren extrahierten modalen Parameter werden in der Lokalisierung von Systemver{\"a}nderungen eingesetzt. Zur Bestimmung modaler Parameter auch an realen Bauwerken wird die Konstruktion eines Impulshammers vorgestellt. Besonderes Gewicht wird dabei auf die Gestaltung des Erregerkraftspektrums gelegt. Die Arbeit enth{\"a}lt eine m{\"o}gliche Vorgehensweise zum Abgleich von Finite-Elemente Modellen. In vielen praxisnahen F{\"a}llen sind weit weniger modale Parameter vorhanden, als freie, zum Abgleich bestimmte Parameter gesucht werden. Das Gleichungssystem ist schlechtgestellt und ben{\"o}tigt eine Regularisierung. Eine andere M{\"o}glichkeit zur Korrektur von Rechenmodellen bietet das Projektive Eingangsgr{\"o}ßenverfahren, das auf der Basis unvollst{\"a}ndig gemessener Ein- und Ausgangsgr{\"o}ßen arbeitet. In einer Versagenswahrscheinlichkeitsstudie wird die Robustheit des Verfahrens gegen{\"u}ber! Rauscheinfl{\"u}ssen untersucht}, subject = {Systemidentifikation}, language = {de} } @inproceedings{HauschildHuebler1997, author = {Hauschild, Thomas and H{\"u}bler, Reinhard}, title = {Entwicklung eines verteilbaren und kooperativ nutzbaren objektorientierten CAAD-Produktmodellierkerns}, doi = {10.25643/bauhaus-universitaet.447}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4475}, year = {1997}, abstract = {Der Fokus des Projektes liegt auf einer besseren Unterst{\"u}tzung der kooperativen Aspekte im Bauwerksentwurf und der Anwendung von ComponentWare-Techniken in der Architektur des Entwurfssystems. Es muß festgestellt werden, daß die Kooperation der Beteiligten im Entwurfsprozeß von Bauwerken durch die heute praktizierten Datenaustauschverfahren nicht oder nur unbefriedigend unterst{\"u}tzt wird und das keine L{\"o}sung dieses Problems durch die Weiterentwicklung von filebasierten Datenaustauschformaten zu erwarten ist. Im Rahmen des Projektes wird mit einer CORBA-Umgebung f{\"u}r Smalltalk-80 ein verteilbares Objektsystem realisiert. Als Architektur des Systems wurde eine hybride Herangehensweise gew{\"a}hlt, bei der allgemeine Informationen auf einem zentralen Server verwaltet werden und die eigentlichen Projektinformationen bei Bedarf repliziert werden. Wie allgemein in GroupWare - orientierten Systemen notwendig, m{\"u}ssen effektive Mechanismen der Nebenl{\"a}ufigkeitskontrolle und zur Sperrung bestimmter Modellbereiche realisiert werden. Wichtig ist f{\"u}r kooperative Entwurfssysteme die Systemunterst{\"u}tzung der Beseitigung der Folgen von kollidierenden Entwurfsintensionen durch die Bearbeiter. Dazu werden unter anderem Remote-Pointer-Mechanismen realisiert. In Abh{\"a}ngigkeit von der Rolle eines Bearbeiters werden diesem Sichten auf des Objektmodell (Partialmodelle) zugeordnet. Es werden Mechanismen zur Autorisierung des Zugriffs auf Partialmodelle implementiert, zu diesem Zweck erfolgt eine Nutzerauthentifizierung. Beziehungen zwischen Partialmodellen werden durch eine spezielle Relation im Objektsystem abgebildet. Die Konzeption des Objektsystems lehnt sich an die PREPLAN-Philosophie an. Das impliziert die Unterst{\"u}tzung von Entwurfshandlungen sowohl in Bottom-Up- als auch in Top-Down - Richtung. Benutzer k{\"o}nnen das Objektsystem um eigene Klassen erweitern bzw. existierende Klassen modifizieren und Attribute mit Defaultwerten belegen, um das System inkrementell mit Dom{\"a}nenwissen anreichern zu k{\"o}nnen. Von großer Bedeutung f{\"u}r kooperative Entwurfssysteme sind eine Versionsverwaltung und die Bereitstellung von Undo - und Redo - Mechanismen. Es ist m{\"o}glich, multimediale Daten im Objektmodell abzulegen und diese in Abh{\"a}ngigkeit von ihrem Format wiederzugeben bzw. zu bearbeiten. Das beschriebene System befindet sich derzeit in der Implementierung.}, subject = {Bauwerk}, language = {de} } @inproceedings{HauschildHuebler2000, author = {Hauschild, Thomas and H{\"u}bler, Reinhard}, title = {Aspekte der verteilten Bauwerksmodellierung in kooperativen Entwurfsumgebungen auf Basis dynamischer Objektstrukturen}, doi = {10.25643/bauhaus-universitaet.591}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-5912}, year = {2000}, abstract = {Entwurfsprozesse im Bauwesen sind hochgradig kooperative Prozesse mit alternierenden Phasen asynchroner und synchroner Teamarbeit. Die Informationen {\"u}ber den aktuellen Entwurfsgegenstand k{\"o}nnen als Objektstrukturen modelliert werden, die in entsprechenden Modellverwaltungssystemen gespeichert werden. Bei der Realisierung von kooperativ nutzbaren Umgebungen f{\"u}r den Bauwerksentwurf sind jedoch bei der Auswahl von Basistechniken spezifische Anforderungen von CSCW-Applikationen zu beachten, die bestimmte traditionelle Verfahren nicht erf{\"u}llen. Neben verschiedenen Auswirkungen auf das Interaktionsverhalten der Entwurfsumgebung spielt die cooperation awareness der eingesetzten Mechanismen eine bedeutende Rolle. Mechanismen zur Zugriffskontrolle sind in netzwerkbasierten Mehrbenutzerumgebungen essentiell, jedoch sind herk{\"o}mmliche Verfahren zu unflexibel und nicht hinreichend ausdrucksstark. Eine adaptierte und erweiterte Variante des Matrixverfahrens ist f{\"u}r die Anwendung in Modellverwaltungssystemen geeignet. Ebenso muss bei der Auswahl von Mechanismen zur Nebenl{\"a}ufigkeitskontrolle Augenmerk auf dessen Eignung in Groupware-Systemen gelegt werden. Bei der Unterst{\"u}tzung asynchroner Kooperation k{\"o}nnen Lock-Verfahren auf die Informationen in Modellverwaltungssystemen angewandt werden. F{\"u}r die Applikationen f{\"u}r synchrone Teamarbeit m{\"u}ssen derartige Mechanismen auf die gemeinsamen Informationsbest{\"a}nde sowie auf Systemressourcen der Entwurfsumgebung angewendet werden. Hierf{\"u}r sind floor-passing'-Verfahren geeignet; die Anwendbarkeit von Transformationsverfahren sollte f{\"u}r die konkret umzusetzende Applikation gepr{\"u}ft werden.}, subject = {Bauwerk}, language = {de} } @inproceedings{HauschildHuebler2003, author = {Hauschild, Thomas and H{\"u}bler, Reinhard}, title = {Techniken der Verwaltung dynamischer digitaler Bauwerksmodelle f{\"u}r Revitalisierungsvorhaben}, doi = {10.25643/bauhaus-universitaet.305}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3054}, year = {2003}, abstract = {Modellverwaltungssysteme sind eine geeignete technologische Basis zum Management digitaler Bauwerksmodelle bei Planungst{\"a}tigkeiten f{\"u}r den Neubau als auch f{\"u}r die Revitalisierung von Bauwerken. Die Unterst{\"u}tzung von Revitalisierungsprozessen impliziert f{\"u}r den Entwurf integrierter Planungsumgebungen spezifische Anforderungen wie die Repr{\"a}sentation von Informationen, die mit verschiedenen Typen von Vagheit behaftet sind, die Notwendigkeit, den Soll- sowie den Ist- Zustand des Bauwerks abzubilden und die F{\"a}higkeit des Umgangs mit temporal inkonsistenten Modellzust{\"a}nden. Die erforderliche Dynamik der Dom{\"a}nenmodelle und die erforderliche Nutzbarkeit in Virtual Enterprises stellen weitere Anspr{\"u}che an die Realisierungsbasis der Modellverwaltungssysteme. Zur Implementierung derartiger Systeme erweist es sich als vorteilhaft, Eigenschaften objektorientierter Programmiersprachen mit nichtstatischen Typsystemen auszunutzen, da diese durch die vorhandene Metaebene sowie Introspektions- und Reflektionsmechanismen eine effiziente Realisierungsbasis bereitstellen. Zur effektiven Unterst{\"u}tzung synchroner kooperativer Planungst{\"a}tigkeiten innerhalb einzelner Fachdisziplinen wurde ein Benachrichtigungsmechanismus realisiert, der an das Modellverwaltungssystem angekoppelte Fachapplikationen {\"u}ber nebenl{\"a}ufig vorgenommene Modifikationen am zugeh{\"o}rigen Dom{\"a}nenmodell oder an Projektinformationen informiert. Weiterhin existiert ein Mechanismus zur vereinfachten Anbindung von existierenden Applikationen, die auf statischen Partialmodellen beruhen oder standardisierte, modellbasierte Austauschformate unterst{\"u}tzen. Abschließend wird eine aus einem zentralen Projektserver, Dom{\"a}nenservern und Dom{\"a}nenclients bestehende hybride Systemarchitektur vorgestellt, die geeignet ist, unter den Randbedingungen kooperativer und geographisch verteilter Arbeit bei Revitalisierungsvorhaben in Virtual Enterprises eingesetzt zu werden.}, subject = {Bauwerk}, language = {de} } @phdthesis{Hauschild2003, author = {Hauschild, Thomas}, title = {Computer Supported Cooperative Work-Applikationen in der Bauwerksplanung auf Basis einer integrierten Bauwerksmodellverwaltung}, doi = {10.25643/bauhaus-universitaet.64}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20040311-672}, school = {Bauhaus-Universit{\"a}t Weimar}, year = {2003}, abstract = {Gegenstand der vorliegenden Arbeit ist die Konzeption und prototypische Umsetzung von Techniken des Computer Supported Cooperative Work (CSCW) im Rahmen einer integrierten objektorientierten und dynamischen Bauwerksmodellverwaltung zur Unterst{\"u}tzung der Bauwerksplanung. Die Planung von Bauwerken ist durch einen hohen Grad an Arbeitsteiligkeit, aber auch durch eine schwache Strukturierung der ablaufenden Prozesse gekennzeichnet. Besonders durch den Unikatcharakter des Planungsgegenstands \'Bauwerk\' ergeben sich signifikante Unterschiede zum Entwurf anderer, durch Serienfertigung produzierter Industrieg{\"u}ter. Zunehmend wird die Planung von Bauwerken in Virtual Enterprises ausgef{\"u}hrt, die sich durch eine dynamische Organisationsstruktur, geographische Verteilung der Partner, schwer normierbare Informationsfl{\"u}sse und eine h{\"a}ufig stark heterogene informationstechnische Infrastruktur auszeichnen. Zur rechnerinternen Repr{\"a}sent! ation des Planungsgegenstands haben sich objektorientierte Bauwerksmodelle bew{\"a}hrt. Aufgrund der Ver{\"a}nderlichkeit der Bauwerke und deren rechnerinterner Repr{\"a}sentation im Laufe des Bauwerkslebenszyklus ist eine dynamische Anpassung der Modelle unumg{\"a}nglich. Derartige in Form von Taxonomien dargestellte dynamische Bauwerksmodellstrukturen k{\"o}nnen gemeinsam mit den in Instanzform vorliegenden konkreten Projektinformationen in entsprechenden Modellverwaltungssystemen (MVS) gehandhabt werden. Dabei wird aufgrund der Spezialisierung und Arbeitsteilung im Planungsprozess von einer inhaltlich verkn{\"u}pften Partialmodellstruktur, die r{\"a}umlich verteilt sein kann, ausgegangen. Die vorgeschlagenen Methoden zur Koordinierung der Teamarbeit in der Bauwerksplanung beruhen auf der Nutzung von CSCW-Techniken f{\"u}r \'Gemeinsame Informationsr{\"a}ume\' und \'Workgroup Computing\', die im Kontext der als Integrationsbasis fungierenden Modellverwaltungssysteme umgesetzt werden. Dazu werden die zur d! ynamischen Bauwerksmodellierung erforderlichen Metaebenenfunk! tionalit{\"a}ten sowie Ans{\"a}tze zur Implementierung von Modellverwaltungskernen systematisiert. Ebenso werden notwendige Basistechniken f{\"u}r die Realisierung von MVS untersucht und eine Architektur zur rollenspezifischen Pr{\"a}sentation dynamischer Modellinhalte vorgestellt. Da klassische Schichtenmodelle nicht auf die Verh{\"a}ltnisse in Virtual Enterprises angewendet werden k{\"o}nnen, wird eine physische Systemarchitektur mit einem zentralen Projektserver, Dom{\"a}nenservern und Dom{\"a}nenclients vorgestellt. Ebenso werden Techniken zur Sicherung des autorisierten Zugriffs sowie des Dokumentencharakters beschrieben. Zur Unterst{\"u}tzung der asynchronen Phasen der Kooperation wird der gemeinsame Informationsraum durch Mappingtechniken zur Propagation und Notifikation von {\"A}nderungsdaten bez{\"u}glich relevanter Modellinformationen erg{\"a}nzt. Zur Unterst{\"u}tzung synchroner Phasen werden Techniken zur Schaffung eines gemeinsamen Kontexts durch relaxierte WYSIWIS-Pr{\"a}sentationen auf Basis der Modellinformationen! verbunden mit Telepresence-Techniken vorgestellt. Weiterhin werden Methoden zur Sicherung der Group-Awareness f{\"u}r alle Kooperationsphasen betrachtet.}, subject = {Computer Supported Cooperative Work}, language = {de} } @inproceedings{GarrettAkinciWang2004, author = {Garrett, James H. and Akinci, Burcu and Wang, Hongjun}, title = {Towards Domain-Oriented Semi-Automated Model Matching for Supporting Data Exchange}, doi = {10.25643/bauhaus-universitaet.132}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1324}, year = {2004}, abstract = {The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today's demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models.}, subject = {Bauwerk}, language = {en} } @article{Fink2004, author = {Fink, Thomas}, title = {Structural analysis, design and detailing using standard CAD software and standard building information model}, doi = {10.25643/bauhaus-universitaet.270}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2702}, year = {2004}, abstract = {This paper describes the concept of a german commercial software package developed for the needs of structural engineers. Using a standard CAD software as user interface for all geometrical data and to save all important input data, there is a natural link to upcoming building information models.}, subject = {Bauindustrie}, language = {en} } @inproceedings{CheungNoruziaanLi2004, author = {Cheung, Moe M. S. and Noruziaan, Bahman and Li, W. C.}, title = {Data acquisition, processing and management systems for a Canadian bridge monitoring project}, doi = {10.25643/bauhaus-universitaet.123}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1235}, year = {2004}, abstract = {This paper will present a number of technical aspects for one of the most elaborate instrumentation and data acquisition projects ever undertaken in Canada. Confederation Bridge, the longest bridge built over ice covered seawater has been equipped with the state of the art data acquistition devices and systems as well as data transfer networks. The Bridge has been providing a fixed surface connection between Prince Edward Island and Province of New Brunswick in Canada since its opening in 1997. The Bridge has a rather long design service life of 100 years. Because of its large size and long span length, its design is not covered by any existing codes or standards worldwide. The focus of the paper is to introduce the data acquisition, transfer, processing and management systems. The instrumentation and communications infrastructure and devices will be presented in some details along with the data processing and management systems and techniques. Teams of engineers and researchers use the collected data to verify the analysis and design assumptions and parameters as well as investigate the short-term and long-term behaviour and health of the Bridge. The collected data are also used in furthering research activities in the field of bridge engineering and in elevating our knowledge about behaviour, reliability and durability of such complex structures, their components and materials.}, subject = {Bauwerk}, language = {en} } @inproceedings{ChangwanHaasCaldas2004, author = {Changwan, Kim and Haas, Carl and Caldas, Carlos}, title = {Spatial data acquisition, integration, and modeling for real-time project life-cycle applications}, doi = {10.25643/bauhaus-universitaet.128}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1280}, year = {2004}, abstract = {Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.}, subject = {Bauwerk}, language = {en} } @inproceedings{BedardMoraRivard2004, author = {B{\´e}dard, Claude and Mora, Rodrigo and Rivard, Hugues}, title = {A Framework for Computer-Aided Conceptual Design of Building Structures}, doi = {10.25643/bauhaus-universitaet.101}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1018}, year = {2004}, abstract = {This paper describes a framework for computer-aided conceptual design of building structures that results from building architectural considerations. The central task that is carried out during conceptual design is the synthesis of the structural system. This paper proposes a methodology for the synthesis of structural solutions. Given the nature of architectural constraints, user-model interactivity is devised as the most suitable computer methodology for driving the structural synthesis process. Taking advantage of the hierarchical organization of the structural system, this research proposes a top-down approach for structural synthesis. Through hierarchical refinement, the approach lends itself to the synthesis of global and local structural solutions. The components required for implementing the proposed methodology are briefly described. The main components have been incorporated in a proof-of-concept prototype that is being tested and validated with actual buildings.}, subject = {Konzipieren }, language = {en} } @inproceedings{BoukampAkinci2004, author = {Boukamp, Frank and Akinci, Burcu}, title = {Towards Automated Defect Detection: Object-oriented Modeling of Construction Specifications}, doi = {10.25643/bauhaus-universitaet.131}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1315}, year = {2004}, abstract = {This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system.}, subject = {Bauwerk}, language = {en} } @inproceedings{BothKohlerGessmann2004, author = {Both, Petra von and Kohler, Niklaus and Gessmann, Robin}, title = {A virtual life cycle structured platform for building applications}, doi = {10.25643/bauhaus-universitaet.121}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1219}, year = {2004}, abstract = {The development of a life cycle structured cooperation platform is described, which is based on an integrated process and goal-oriented project model. Furthermore the structure of a life cycle oriented object structure model and its implementation in the platform are documented. The complete conceptual model is described, which represents the basis of a lifecycle -oriented structuring of the planning object and supports the thematic classification of the object and project management data.}, subject = {Bauwerk}, language = {en} } @inproceedings{BargstaedtBlickling2003, author = {Bargst{\"a}dt, Hans-Joachim and Blickling, Arno}, title = {Neue Methoden f{\"u}r die bauteilorientierte Ausschreibung und Kalkulation unter Beachtung des Integrated Product Lifecycle Management von Bauwerken}, doi = {10.25643/bauhaus-universitaet.7}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-70}, year = {2003}, abstract = {Die Autoren stellen Grundlagen und Methoden zur Erstellung von Ausschreibungen und zur Durchf{\"u}hrung der Kalkulation vor, die direkt mit dreidimensionalen Bauteilmodellen arbeiten. Dies tr{\"a}gt dazu bei, den gesamten Lebenszyklus eines Bauwerkes durchg{\"a}ngig {\"u}ber 3-D-Modelle beschreiben zu k{\"o}nnen. Im ersten Abschnitt werden grundlegende {\"U}berlegungen zum Einsatz von PLM/PDM-Technologien im Bauwesen angestellt. Im Anschluß daran wird die herk{\"o}mmliche Ausschreibungsmethodik analysiert. Die Unterschiede zwischen einem konventionellen Leistungsverzeichnis und einem dreidimensionalen Bauteilkatalog (Objektdatenbank) hinsichtlich der Datenstruktur werden dargestellt. Hieraus abgeleitet werden Methoden und Prozesse bei der Erstellung einer 3-D-Leistungsbeschreibung entwickelt. Dazu wird eine geeignete Benutzer-Schnittstelle eines dreidimensionalen Bauteilkataloges vorgestellt. Schließlich werden praxisrelevante Probleme bei der Verwendung von Bauteilkatalogen er{\"o}rtert. Ein wesentlicher Baustein ist die Kalkulation. Hier werden Kalkulationsmethoden basierend auf einem zweidimensionalen Leistungsverzeichnis und einem dreidimensionalen Bauteilkatalog miteinander verglichen. Erg{\"a}nzt wird dies um L{\"o}sungen zur Anbindung von elektronischen Marktpl{\"a}tzen an den Bauteilkatalog zum Zweck der Preisbildung. Schließlich wird ein Ausblick gegeben, wie eine Synthese zwischen dreidimensionalem Bauteilkatalog und textlichen Standard-Leistungsbeschreibungen erreicht werden kann.}, subject = {Bauwerk}, language = {de} } @inproceedings{BaitschHartmann2004, author = {Baitsch, Matthias and Hartmann, Dietrich}, title = {Object Oriented Finite Element Analysis for Structural Optimization using p-Elements}, doi = {10.25643/bauhaus-universitaet.108}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1089}, year = {2004}, abstract = {The optimization of continuous structures requires careful attention to discretization errors. Compared to ordinary low order formulation (h-elements) in conjunction with an adaptive mesh refinement in each optimization step, the use of high order finite elements (so called p-elements) has several advantages. However, compared to the h-method a higher order finite element analysis program poses higher demands from a software engineering point of view. In this article the basics of an object oriented higher order finite element system especially tailored to the use in structural optimization is presented. Besides the design of the system, aspects related to the employed implementation language Java are discussed.}, subject = {Konzipieren }, language = {en} } @inproceedings{AsayamaMae2004, author = {Asayama, Shuichi and Mae, Toshifumi}, title = {Fractal Truss Structure and Automatic Form Generation Using Iterated Function System}, doi = {10.25643/bauhaus-universitaet.104}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1046}, year = {2004}, abstract = {This paper describes a couple of new truss structures based on fractal geometry. One is the famous Sierpinski Gasket and another is a fractal triangle derived by means of applying a process forming leaves of a cedar tree using M. F. Barnsley's contraction mapping theory. Therefore a pair of x-y coordinates of an arbitrary nodal point on the structures are generated easily if IFS(Iterated Function System) codes and a scale of them are specified. Structural members are defined similarly. Thus data for frame analysis can be generated automatically, which is significant if the objective structure has complex configuration. Next analytical results under vertical and wind loadings in Japanese Building Code are shown. Here members are assumed to be timber and to have cross section of 15cm×15cm. Finally authors conclude that geometrically new truss structures were developed and automatic data generation for frame analysis was attained using IFS. Analytical results show they contribute to saving material when compared it with King-post truss.}, subject = {Konzipieren }, language = {en} } @inproceedings{AlDiabHenryBoulemia2003, author = {Al Diab, Ali and Henry, Eric and Boulemia, Cherif}, title = {A concerted and multi-criterion approach for helping to choose a Structure- Foundation system of building}, doi = {10.25643/bauhaus-universitaet.273}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-2732}, year = {2003}, abstract = {The research of the best building design requires a concerted design approach of both structure and foundation. Our work is an application of this approach. Our objective is also to create an interactive tool, which will be able to define, at the early design stages, the orientations of structure and foundation systems that satisfy as well as possible the client and the architect. If the concerns of these two actors are primarily technical and economical, they also wish to apprehend the environmental and social dimensions of their projects. Thus, this approach bases on alternative studies and on a multi-criterion analysis. In this paper, we present the context of our work, the problem formulation, which allows a concerted design of Structure and Foundation systems and the feasible solutions identifying process.}, subject = {Bauwerk}, language = {en} } @article{AbrahamczykUzair, author = {Abrahamczyk, Lars and Uzair, Aanis}, title = {On the use of climate models for estimating the non-stationary characteristic values of climatic actions in civil engineering practice}, series = {Frontiers in Built Environment}, volume = {2023}, journal = {Frontiers in Built Environment}, number = {volume 9, article 1108328}, publisher = {Frontier Media}, address = {Lausanne}, doi = {10.3389/fbuil.2023.1108328}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20230524-63751}, pages = {1 -- 9}, abstract = {The characteristic values of climatic actions in current structural design codes are based on a specified probability of exceedance during the design working life of a structure. These values are traditionally determined from the past observation data under a stationary climate assumption. However, this assumption becomes invalid in the context of climate change, where the frequency and intensity of climatic extremes varies with respect to time. This paper presents a methodology to calculate the non-stationary characteristic values using state of the art climate model projections. The non-stationary characteristic values are calculated in compliance with the requirements of structural design codes by forming quasi-stationary windows of the entire bias-corrected climate model data. Three approaches for the calculation of non-stationary characteristic values considering the design working life of a structure are compared and their consequences on exceedance probability are discussed.}, subject = {Klima{\"a}nderung}, language = {en} }