@inproceedings{ReinhardtGarrettScherer2000, author = {Reinhardt, Jan and Garrett, James H. and Scherer, Raimar J.}, title = {The preliminary design of a wearable computer for supporting Construction Progress Monitoring}, doi = {10.25643/bauhaus-universitaet.590}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-5901}, year = {2000}, abstract = {Progress monitoring has become more and more important as owners have increasingly demanded shorter times for the delivery of their projects. This trend is even more evident in high technology industries, such as the computer industry and the chemical industry. Fast changing markets, such as the computer industry, force companies to have to build new facilities quickly. To make a statement about construction progress, the status of a building has to be determined and monitored over a period of time. Depicting the construction progress in a diagram over time, statements can be made about the anticipated completion of the project and delays and problems in certain areas. Having this information, measures can be taken to efficiently >catch up< on the schedule of the project. New technologies, such as wearable computers, speech recognition, touch screens and wireless networks could help to move electronic data processing to the construction site. Progress monitoring could very much take advantage of this move, as several intermediate steps of processing progress data can be made unnecessary. The processing of progress data could be entirely done by computers, which means that data for supporting decisions can be made available at the moment the construction progress is measured. This paper describes a project, that investigates how these new technologies can be linked to create a system that enhances the efficiency of progress monitoring. During the project a first prototype of a progress monitoring system was developed that allows construction companies and site supervisors to measure construction progress on site using wearable computers that are speech controlled and connected to a central database via a wireless network.}, subject = {Bauablauf}, language = {en} } @inproceedings{Wolff1997, author = {Wolff, Ulrich}, title = {Konzept zur rechnergest{\"u}tzten integrierten Projektsteuerung im Bauwesen}, doi = {10.25643/bauhaus-universitaet.453}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4531}, year = {1997}, abstract = {Projektsteuerung gewinnt als Aufgabenfeld bei der Realisierung von Investitionsprojekten st{\"a}ndig an Bedeutung. Zur Bew{\"a}ltigung der umfangreichen und komplizierten Aufgaben des Projektsteuerers wird zunehmend Software angeboten und genutzt. Dabei ist feststellbar, daß von einer integrierten Projektsteuerung unter Ber{\"u}cksichtigung der Kriterien Leistung, Termin und Kosten nicht gesprochen werden kann, weil wesentliche theoretische und praktische Voraussetzungen fehlen. Im Beitrag werden Defizite der praktizierten Vorgehensweise und L{\"o}sungsans{\"a}tze f{\"u}r eine integrierte rechnergest{\"u}tzte Projektsteuerung vorgestellt. Durch geeignete Formen der Projektstrukturierung und eine Kopplung auf dem Mark befindlicher Standardsoftware k{\"o}nnen geeignete L{\"o}sungen gefunden werden. Problempunkte dabei stellen die Schnittstellen zwischen den Anwenderprogrammen die Datenbeschaffung und -verwaltung sowie geeignete Verfahren zur Kostenermittlung und -verfolgung dar. Im Beitrag werden eine bereits praktizierte und eine in Entwicklung befindliche L{\"o}sung vorgestellt.}, subject = {Bauwesen}, language = {de} } @inproceedings{Hohmann1997, author = {Hohmann, Georg}, title = {Von der Netzplantechnik zur Simulation - Analyse von Bauprozessen mit Hilfe von Petri-Netzen}, doi = {10.25643/bauhaus-universitaet.451}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-4511}, year = {1997}, abstract = {Nichtstation{\"a}re Baustellenprozesse sind dadurch gekennzeichnet, daß ihr Ablauf nicht vollst{\"a}ndig vorhersehbar ist, sondern einer Vielzahl von St{\"o}rungen unterworfen sein kann. Zur Planung und Steuerung dieser Prozesse sind daher Methoden erforderlich, welche u.a. eine große Anpassungsf{\"a}higkeit, die Darstellung paralleler Vorg{\"a}nge, die Erfassung pl{\"o}tzlicher St{\"o}rungen sowie stochastische bzw. unscharfe Parameter zulassen. Hiervon ausgehend wurden spezielle Simulationssysteme entwickelt. In der Praxis dient jedoch in den meisten F{\"a}llen das Balkendiagramm bzw. die Netzplantechnik als Planungshilfsmittel. Dabei ist der Informationsgehalt der Netzplantechnik eindeutig geringer gegen{\"u}ber der Simulation. Auch fallen deterministische Berechnungen in der Regel zu optimistisch aus. Ein Wechsel von der Netzplantechnik zur Simulation ist m{\"o}glich, indem zun{\"a}chst Netzpl{\"a}ne auf der Grundlage von Petri-Netzen dargestellt werden und somit ein schrittweiser {\"U}bergang zur Simulation erfolgt. Neben der Modellbildung kommt der Bereitstellung realit{\"a}tsnaher Parameter, die den Berechnungen zugrunde gelegt werden, eine große Bedeutung zu. Bei der Terminplanung sind Kenntnisse zu bestimmten {\"a}ußeren Einfl{\"u}ssen (z. B. Niederschlag) oft nur in unscharfer Weise vorhanden. Hier bietet sich der Einsatz von Fuzzy-Verfahren an. Mit ihrer Hilfe lassen sich unscharfe Faktoren erfassen und in die Planung einbeziehen. Sowohl zur Darstellung von Petri-Netzen als zur Berechnung (Simulation) auf deren Grundlage sowie zur Aufbereitung der Daten mittels Fuzzy-Verfahren liegen entsprechende Rechenprogramme vor.}, subject = {Bauablauf}, language = {de} } @inproceedings{Huhnt2004, author = {Huhnt, Wolfgang}, title = {Progress Measurement in Planning Processes on the Base of Process Models}, doi = {10.25643/bauhaus-universitaet.166}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1664}, year = {2004}, abstract = {This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data - the products of engineers like technical drawings, technical models, reports, or specifications - form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.}, subject = {Baubetrieb}, language = {en} } @inproceedings{Schultmann2003, author = {Schultmann, Frank}, title = {Projektplanungsmodelle und -methoden f{\"u}r den R{\"u}ckbau von Bauwerken}, doi = {10.25643/bauhaus-universitaet.16}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-162}, year = {2003}, abstract = {Vor dem Hintergrund einer sich versch{\"a}rfenden Umweltgesetzgebung sowie der Erkenntnis, dass Bauabf{\"a}lle sich grunds{\"a}tzlich f{\"u}r eine Stoffkreislauff{\"u}hrung eignen, hat der R{\"u}ckbau von Bauwerken in den letzten Jahren verst{\"a}rkt an Bedeutung gewonnen. Aufgrund oftmals strenger Zeit- und Kostenvorgaben f{\"u}r einen R{\"u}ckbau, begrenzter Verf{\"u}gbarkeit von Personal und Betriebsmitteln, einer weitgehenden Unikatfertigung sowie wechselnder Standorte kommt dabei der projektorientierten Planung von Maßnahmen auf der Baustelle große Bedeutung zu. Im Rahmen des Beitrages werden Ans{\"a}tze zur Modellierung und L{\"o}sung der sich hieraus ergebenden Probleme zur Planung und Optimierung von (R{\"u}ck-) Bauabl{\"a}ufen unter Verwendung von Projektplanungsmodellen und -methoden vorgestellt. Hierbei werden neben betriebswirtschaftlichen auch umweltrelevante sowie technische Fragestellungen im Zusammenhang mit der Planung von R{\"u}ckbauprojekten aufgegriffen. Eine Anwendung der Planungsans{\"a}tze auf reale Geb{\"a}ude zeigt, dass sich durch Kombination von Geb{\"a}uder{\"u}ckbau und Aufbereitungstechnik eine Qualit{\"a}tsverbesserung von Recyclingbaustoffen erzielen l{\"a}sst. Zur Umsetzung der hierzu erforderlichen Maßnahmen werden unter Ber{\"u}cksichtigung individueller abfallwirtschaftlicher Rahmenbedingungen der jeweiligen Planungsregion, geb{\"a}ude- und baustellenbezogener Besonderheiten, technischer sowie kapazitiver Restriktionen Ablaufpl{\"a}ne f{\"u}r den Geb{\"a}uder{\"u}ckbau berechnet. Die f{\"u}r unterschiedliche Planungsregionen vorgenommenen Modellrechnungen weisen nach, dass sich die Demontage von Geb{\"a}uden gegen{\"u}ber einem konventionellen Geb{\"a}udeabbruch unter bestimmten Rahmenbedingungen bereits wirtschaftlich vorteilhaft realisieren l{\"a}sst. Abgerundet wird der Beitrag durch einen Ausblick auf M{\"o}glichkeiten einer Realisierung komplexer Bauabl{\"a}ufe auch unter strengen Zeitvorgaben sowie bei begrenzten Platzverh{\"a}ltnissen mit Hilfe fertigungssynchroner Ressourceneinsatzplanung sowie auf die Ber{\"u}cksichtigung von Unsicherheiten in der Planung und Ausf{\"u}hrung von R{\"u}ckbauprojekten.}, subject = {Bauwerk}, language = {de} }