@phdthesis{Fauth, author = {Fauth, Judith}, title = {A process-oriented decision model for determining the permitability of construction projects}, doi = {10.25643/bauhaus-universitaet.4602}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20220309-46020}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {325}, abstract = {In recent years, the discussion of digitalization has arrived in the media, at conferences, and in committees of the construction and real estate industry. While some areas are producing innovations and some contributors can be described as pioneers, other topics still show deficits with regard to digital transformation. The building permit process can also be counted in this category. Regardless of how architects and engineers in planning offices rely on innovative methods, building documents have so far remained in paper form in too many cases, or are printed out after electronic submission to the authority. Existing resources - for example in the form of a building information model, which could provide support in the building permit process - are not being taken advantage of. In order to use digital tools to support decision-making by the building permit authorities, it is necessary to understand the current situation and to question conditions before pursuing the overall automation of internal authority processes as the sole solution. With a substantive-organizational consideration of the relevant areas that influence building permit determination, an improvement of the building permit procedure within authorities is proposed. Complex areas - such as legal situations, the use of technology, as well as the subjective alternative action - are determined and structured. With the development of a model for the determination of building permitability, both an understanding of influencing factors is conveyed and an increase in transparency for all parties involved is created. In addition to an international literature review, an empirical study served as the research method. The empirical study was conducted in the form of qualitative expert interviews in order to determine the current state in the field of building permit procedures. The collected data material was processed and subsequently subjected to a software-supported content analysis. The results were processed, in combination with findings from the literature review, in various analyses to form the basis for a proposed model. The result of the study is a decision model that closes the gap between the current processes within the building authorities and an overall automation of the building permit review process. The model offers support to examiners and applicants in determining building permit eligibility, through its process-oriented structuring of decision-relevant facts. The theoretical model could be transferred into practice in the form of a web application.}, subject = {Baugenehmigung}, language = {en} } @phdthesis{Fauth, author = {Fauth, Judith}, title = {Ein handlungsorientiertes Entscheidungsmodell zur Feststellung der Genehmigungsf{\"a}higkeit von Bauvorhaben}, publisher = {Bauhaus-Universit{\"a}tsverlag}, address = {Ilmtal-Weinstraße}, isbn = {978-3-95773-299-6}, doi = {10.25643/bauhaus-universitaet.4509}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20210928-45093}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {318}, abstract = {Die Auseinandersetzung mit der Digitalisierung ist in den letzten Jahren in den Medien, auf Konferenzen und in Aussch{\"u}ssen der Bau- und Immobilienbranche angekommen. W{\"a}hrend manche Bereiche Neuerungen hervorbringen und einige Akteure als Pioniere zu bezeichnen sind, weisen andere Themen noch Defizite hinsichtlich der digitalen Transformation auf. Zu dieser Kategorie kann auch das Baugenehmigungsverfahren gez{\"a}hlt werden. Unabh{\"a}ngig davon, wie Architekten und Ingenieure in den Planungsb{\"u}ros auf innovative Methoden setzen, bleiben die Bauvorlagen bisher zuhauf in Papierform oder werden nach der elektronischen Einreichung in der Beh{\"o}rde ausgedruckt. Vorhandene Ressourcen, beispielsweise in Form eines Bauwerksinformationsmodells, die Unterst{\"u}tzung bei der Baugenehmigungsfeststellung bieten k{\"o}nnen, werden nicht ausgesch{\"o}pft. Um mit digitalen Werkzeugen eine Entscheidungshilfe f{\"u}r die Baugenehmigungsbeh{\"o}rden zu erarbeiten, ist es notwendig, den Ist-Zustand zu verstehen und Gegebenheiten zu hinterfragen, bevor eine Gesamtautomatisierung der innerbeh{\"o}rdlichen Vorg{\"a}nge als alleinige L{\"o}sung zu verfolgen ist. Mit einer inhaltlich-organisatorischen Betrachtung der relevanten Bereiche, die Einfluss auf die Baugenehmigungsfeststellung nehmen, wird eine Optimierung des Baugenehmigungsverfahrens in den Beh{\"o}rden angestrebt. Es werden die komplexen Bereiche, wie die Gesetzeslage, der Einsatz von Technologie aber auch die subjektiven Handlungsalternativen, ermittelt und strukturiert. Mit der Entwicklung eines Modells zur Feststellung der Baugenehmigungsf{\"a}higkeit wird sowohl ein Verst{\"a}ndnis f{\"u}r Einflussfaktoren vermittelt als auch eine Transparenzsteigerung f{\"u}r alle Beteiligten geschaffen. Neben einer internationalen Literaturrecherche diente eine empirische Studie als Untersuchungsmethode. Die empirische Studie wurde in Form von qualitativen Experteninterviews durchgef{\"u}hrt, um den Ist-Zustand im Bereich der Baugenehmigungsverfahren festzustellen. Das erhobene Datenmaterial wurde aufbereitet und anschließend einer softwaregest{\"u}tzten Inhaltsanalyse unterzogen. Die Ergebnisse wurden in Kombination mit den Erkenntnissen der Literaturrecherche in verschiedenen Analysen als Modellgrundlage aufgearbeitet. Ergebnis der Untersuchung stellt ein Entscheidungsmodell dar, welches eine L{\"u}cke zwischen den gegenw{\"a}rtigen Abl{\"a}ufen in den Baubeh{\"o}rden und einer Gesamtautomatisierung der Baugenehmigungspr{\"u}fung schließt. Die prozessorientierte Strukturierung entscheidungsrelevanter Sachverhalte im Modell erm{\"o}glicht eine Unterst{\"u}tzung bei der Baugenehmigungsfeststellung f{\"u}r Pr{\"u}fer und Antragsteller. Das theoretische Modell konnte in Form einer Webanwendung in die Praxis {\"u}bertragen werden.}, subject = {Baugenehmigung}, language = {de} } @phdthesis{Hoerold, author = {H{\"o}rold, Stefan}, title = {Leistungsbezogene Musterjahresganglinien f{\"u}r den Straßenbetriebsdienst}, doi = {10.25643/bauhaus-universitaet.4491}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20210830-44910}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {124}, abstract = {In den letzten Jahrzehnten unterlag der Straßenbetriebsdienst tiefgreifenden Ver{\"a}nderungen. Diese Ver{\"a}nderungen schließt auch die betriebliche Steuerungsphilosophie ein, um eine planungsrationale und {\"o}konomische Gestaltung des Straßenbetriebsdienstes zu unterst{\"u}tzen. Dabei erfolgt eine verbindliche Vorgabe der Leistungsinhalte und -umf{\"a}nge und erm{\"o}glicht eine Budgetierung f{\"u}r das vorgesehene Jahresarbeitsprogramm. Ziel der Untersuchung ist die Entwicklung eines Modells f{\"u}r die Ermittlung von leistungsbezogenen Musterjahresganglinien zur Unterst{\"u}tzung der Jahresarbeitsplanung. Daf{\"u}r lagen f{\"u}r jede Leistung des Leistungsbereiches „Gr{\"u}npflege" jeweils 260 einzelne Jahresganglinien vor. Im Ergebnis der Untersuchung wird die leistungsbezogene Musterjahresganglinie in vier Schritten ermittelt. Im ersten Schritt erfolgt die Pr{\"u}fung der Datenqualit{\"a}t; im zweiten Schritt eine Korrelationsanalyse; im dritten Schritt die fachliche {\"U}berpr{\"u}fung der Leistungsauspr{\"a}gung und im vierten Schritt die Ermittlung der leistungsbezogenen Musterjahresganglinie aus den verbliebenen leistungsbezogenen Jahresganglinien.}, subject = {Straßenbetriebsdienst}, language = {de} } @misc{Mukherjee, type = {Master Thesis}, author = {Mukherjee, Nilangshu}, title = {A numerical comparison of the impact of different climatic conditions in different geographic locations on the construction of an office building}, doi = {10.25643/bauhaus-universitaet.3270}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170811-32700}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {127}, abstract = {The aim of my research is to observe the variance of energy efficiency of a typical multi-story office building under the exposure of different climatic conditions. Energy efficiency requirements in building codes or energy standards are among the most important single measures for buildings' energy efficiency. Therefore, this study can be set up for a better understanding of how energy efficiency of a building changes under the effect of adverse to moderate climatic conditions which possess a mentionable effect on the operation of a building. This thesis is structured in three balanced and conceptual steps. Following the aim of the project, the virtual building model is to be analyzed under the effect of seven distinct climatic conditions namely work environment of New Delhi, Mumbai, Berlin, Lisbon, Copenhagen, Dubai and Montreal. Firstly, the task is to do a complete literature research based on the scope of similar researches and studying the problems in detail along with the theoritical background all the concepts which are implemented to get the numerical results. This chapter also comprises a detailed study of the climatic conditions of the above-mentioned cities. Different climatic traits like temperature variations, count of heating and cooling degree days, relative humidity, temperature range and comfort zonal charts for the specified cities are studied in detail. This study helps to understand the effect of these adverse to moderate climates on the operation of the building. On the second step, the virtual building model is prepared on a software platform named Revit Structures. This virtual building model is not necessarily a complete building, but it has the relevant functionalities of a real building. We perform the energy analysis and the heating and cooling analysis on this virtual building model to study the operational outcome of the building under different climatic conditions in detail. By the end of these above two tasks, two scenarios are observed. On one hand, we have a literature research and on the other hand we have the numerical results. Therefore, finally we present a comparative scenario based on the energy efficient performances of the building under such variant climatic conditions. This is followed by the prediction of thermal comfort level inside the building and it based on Fanger's PMV Model. Understanding the literature and the numerical values in detail helps us to predict the index thermal comfort level inside the building. The conclusion of this master thesis focuses mainly on the scopes of improvement of energy efficiency requirements in energy codes if any, differentiated according to specific locations. The initial aim of my hypothesis which is to study the impacts of climatic variations on the energy efficient performances of a building is fulfilled but as such topics have very deep and broad roots, the scope of further improvements is always predominant.}, subject = {Klima}, language = {en} } @article{Bargstaedt, author = {Bargst{\"a}dt, Hans-Joachim}, title = {Challenges of BIM for Construction Site Operations}, series = {Procedia Engineering}, journal = {Procedia Engineering}, doi = {10.1016/j.proeng.2015.08.123}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170413-31218}, pages = {52 -- 59}, abstract = {Building Information Modeling is a powerful tool for the design and for a consistent set of data in a virtual storage. For the application in the phases of realization and on site it needs further development. The paper describes main challenges and main features, which will help the development of software to better service the needs of construction site managers}, subject = {Building Information Modeling}, language = {en} } @masterthesis{Steinkrauss, type = {Bachelor Thesis}, author = {Steinkrauß, Tobias}, title = {Building Information Modeling im Erdbau - eine Potentialanalyse im Spezialtiefbau}, doi = {10.25643/bauhaus-universitaet.2614}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20160623-26140}, school = {Bauhaus-Universit{\"a}t Weimar}, abstract = {Jede Baumaßnahme ist durch einen Unikatcharakter gepr{\"a}gt. Individuelle Planung, Vergabe und Bauvorg{\"a}nge stellen immer wieder aufs Neue eine große Herausforderung dar. Durch die sich teilweise sehr schnell {\"a}ndernden Randbedingungen, m{\"u}ssen erarbeitete Abl{\"a}ufe h{\"a}ufig schnell ge{\"a}ndert werden. Dies geschieht heutzutage meist auf Grundlage von Erfahrungen der am Bau Beteiligten. Auch bei bester Planung und Vorbereitung k{\"o}nnen Unw{\"a}gbarkeiten den Bauprozess aufhalten. Das k{\"o}nnen ungeeigneter Baugrund, verschiedenste Hinderungen im Baufeld, schlechte Witterungsverh{\"a}ltnisse, Ausf{\"a}lle von Maschinen, ver{\"a}nderte Zielsetzungen des Auftraggebers und vieles mehr sein. Dies f{\"u}hrt zu Bauzeitverl{\"a}ngerungen und damit zu Kostensteigerungen. Um diesen Problemen besser begegnen zu k{\"o}nnen und diesen komplexen und fehler-anf{\"a}lligen Prozess zu unterst{\"u}tzen, sind ein verbesserter Informationsfluss, genauere Boden-aufschl{\"u}sse und eine exaktere Dimensionierung des einzusetzenden Ger{\"a}tes notwendig. Aus diesen Gr{\"u}nden ist der Einsatz von Building Information Modeling (BIM) sinnvoll. BIM bietet die M{\"o}glichkeit den Informationsfluss zu verbessern, die Datengenauigkeit zu erh{\"o}hen und Abl{\"a}ufe zu optimieren. Außerdem erm{\"o}glicht die Anwendung Planungsschritte miteinander zu verkn{\"u}pfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das {\"u}ber den gesamten Lebenszyklus erweitert werden kann. Die Maßnahmen des Spezialtiefbaus z{\"a}hlen zu den kostenintensivsten auf einer Baustelle. Großes Ger{\"a}t und spezialisierte Firmen sind f{\"u}r eine erfolgreiche Durchf{\"u}hrung unerl{\"a}sslich. Da der Baugrund immer einen großen Unsicherheitsfaktor bildet, m{\"u}ssen geeignete, unterst{\"u}tzende Anwendungen zum Einsatz kommen. Hierf{\"u}r bildet BIM eine geeignete Plattform. Protokolle, Maschinendaten und Kontrolldaten k{\"o}nnen hier webbasiert analysiert und f{\"u}r alle zug{\"a}nglich gemacht werden, um zum einen die Transparenz zu steigern und zum anderen den {\"U}berblick, selbst bei hochkomplexen Bauvorhaben zu behalten. In dieser Arbeit soll ein {\"U}berblick {\"u}ber die aktuelle Forschungssituation im Bereich Building Information Modeling im Erdbau, speziell im Spezialtiefbau, gegeben werden. Die Ergebnisse die mit Hilfe vorhandener Publikationen und Forschungsarbeiten verschiedener Universit{\"a}ten und namhafter Forschungsgruppen zusammengetragen wurden sollen eine Grundlage f{\"u}r die weitere Forschung in diesem Bereich bilden. {\"U}ber die Aufgabenstellung hinaus wird zus{\"a}tzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt. Es wird versucht eine {\"u}berschnittene Bohrpfahlwand zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm f{\"u}r den Einsatz bewertet.}, subject = {Erdbau}, language = {de} } @masterthesis{Kratt, type = {Bachelor Thesis}, author = {Kratt, Helen}, title = {Building Information Modeling im Erdbau - eine Potentialanalyse im Tiefbau}, doi = {10.25643/bauhaus-universitaet.2613}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20160623-26132}, school = {Bauhaus-Universit{\"a}t Weimar}, abstract = {Die meisten Baustellen bieten Optimierungspotential. Vor allem der Erdbau fordert durch seine hohe Dynamik und großen Unsicherheiten eine hohe Planungsleistung f{\"u}r jedes neue Projekt. Doch auch bei bester Planung und Vorbereitung kann der Bauprozess durch nicht vorhersehbare Einwirkungen aufgehalten werden. Dazu z{\"a}hlen Witterungseinfl{\"u}sse, Baumaschinenausf{\"a}lle, unvorhergesehene Bodenschichten und ver{\"a}nderte Zielsetzungen des Auftraggebers. Dies kann zu St{\"o}rungen im Bauablauf f{\"u}hren, die eine Bauzeitverz{\"o}gerung und eine Kostensteigerung nach sich ziehen. Um diese Probleme zu umgehen, sind ein verbesserter Informationsfluss, genaue Bodenaufschl{\"u}sse und eine exakte Dimensionierung des einzusetzenden Ger{\"a}tes notwendig. Hier kann Building Information Modeling (BIM) zum Einsatz kommen. Diese Anwendung bietet die M{\"o}glichkeit, die Datengenauigkeit zu erh{\"o}hen, den Informationsfluss auf der Baustelle zu verbessern, eine Informationsplattform f{\"u}r alle Beteiligten zu schaffen und die Abl{\"a}ufe transparent zu gestalten. Außerdem erm{\"o}glicht die Anwendung Planungsschritte miteinander zu verkn{\"u}pfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das {\"u}ber den gesamten Lebenszyklus erweitert werden kann. Die Grundlagen dieser Arbeit bilden die Begriffsdefinitionen zu Erdbau, Tiefbau und Building Information Modeling. Diese Arbeit setzt sich speziell mit Erdbauwerken und deren Sicherungsmaßnahmen auseinander. Darauf aufbauend wird im Rahmen einer Recherche der Forschungsstand im Bereich Building Information Modeling und Tiefbau zusammengefasst. Mit Hilfe einiger Forschungsbeitr{\"a}ge, -projekte, -verb{\"a}nde, Dissertationen und Anwendungsprogrammen wird ein {\"U}berblick geschaffen. Die {\"U}bersicht soll eine Grundlage f{\"u}r die weitere Forschung auf diesem Gebiet bilden. Abschließend findet eine Bewertung statt. {\"U}ber die Aufgabenstellung hinaus wird zus{\"a}tzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt, um aufzuzeigen, dass das Potential auf Erdbaustellen mit BIM-Anwendungen besser ausgesch{\"o}pft werden kann. Es wird versucht eine Gabionenwand, eine Sicherungsmaßnahme von Erdbauwerken zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm f{\"u}r den Einsatz im Tiefbau bewertet.}, subject = {Erdbau}, language = {de} } @inproceedings{OPUS4-2451, title = {International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar}, series = {Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar}, booktitle = {Digital Proceedings, International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering : July 20 - 22 2015, Bauhaus-University Weimar}, editor = {G{\"u}rlebeck, Klaus and Lahmer, Tom}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2451}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20150828-24515}, pages = {230}, abstract = {The 20th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering will be held at the Bauhaus University Weimar from 20th till 22nd July 2015. Architects, computer scientists, mathematicians, and engineers from all over the world will meet in Weimar for an interdisciplinary exchange of experiences, to report on their results in research, development and practice and to discuss. The conference covers a broad range of research areas: numerical analysis, function theoretic methods, partial differential equations, continuum mechanics, engineering applications, coupled problems, computer sciences, and related topics. Several plenary lectures in aforementioned areas will take place during the conference. We invite architects, engineers, designers, computer scientists, mathematicians, planners, project managers, and software developers from business, science and research to participate in the conference!}, subject = {Angewandte Informatik}, language = {en} } @masterthesis{Goedicke, type = {Bachelor Thesis}, author = {Goedicke, Glenn}, title = {M{\"o}gliche Schnittstellenverschiebungen zwischen Bau- und Nebent{\"a}tigkeiten auf ausdifferenzierten Baustellen aus arbeitsrechtlicher Sicht}, doi = {10.25643/bauhaus-universitaet.2419}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20150629-24192}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {50}, abstract = {In der modernen Arbeitswelt ist es {\"u}blich betriebliche Aufgaben extern zu vergeben. Dieser Vorgang wird in der Wirtschaft Outsourcing genannt und beschr{\"a}nkt sich in der Regel auf Arbeiten, welche nicht zu den Kernkompetenzen eines Unternehmens geh{\"o}ren. Wenn diese Arbeiten durch spezialisierte Unternehmen {\"u}bernommen werden ergeben sich Potenziale, die weit {\"u}ber eine bloße Kostensenkung hinausgehen. Der Kern dieser Arbeit bezieht sich auf die Auslagerung von sogenannten Nebent{\"a}tigkeiten im Zusammenhang einer Bauwerksausf{\"u}hrung. Dabei werden die arbeitsrechtliche Situation, Machbarkeit und Sinnhaftigkeit analysiert. Das Arbeitsrecht im Baugewerbe ist {\"u}beraus komplex und von starren Regelungen gepr{\"a}gt. Die f{\"u}r allgemeinverbindlich erkl{\"a}rten Tarifvertr{\"a}ge gelten gemeinhin f{\"u}r alle Betriebe, die {\"u}berwiegend bauliche T{\"a}tigkeiten aus{\"u}ben. Problematisch wird die tarifliche Zuordnung f{\"u}r Betriebe, welche die Nebent{\"a}tigkeiten {\"u}bernehmen und f{\"u}r gew{\"o}hnlich nicht in den Geltungsbereich der Tarifvertr{\"a}ge fallen. Bei der Vergabe von Nebent{\"a}tigkeiten mit Hilfe von Werk- oder Dienstvertr{\"a}gen bedarf es einer genauen Kl{\"a}rung, ab wann eine unerlaubte Arbeitnehmer{\"u}berlassung beginnt. Im Rahmen dieser Arbeit soll untersucht werden, inwieweit eine Auslagerung der baulichen Nebent{\"a}tigkeiten durch eine Werk- oder Dienstvertragsvergabe an die Grenzen der arbeitsrechtlichen Gegebenheiten st{\"o}ßt. Zus{\"a}tzlich wird eine tarifliche Einordnung der T{\"a}tigkeiten vorgenommen.}, subject = {Arbeitsrecht}, language = {de} } @phdthesis{Dang, author = {Dang, Trang}, title = {Automated Detailing of 4D Schedules}, doi = {10.25643/bauhaus-universitaet.2310}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20141006-23103}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {120}, abstract = {The increasing success of BIM (Building Information Model) and the emergence of its implementation in 3D construction models have paved a way for improving scheduling process. The recent research on application of BIM in scheduling has focused on quantity take-off, duration estimation for individual trades, schedule visualization, and clash detection. Several experiments indicated that the lack of detailed planning causes about 30\% non-productive time and stacking of trades. However, detailed planning still has not been implemented in practice despite receiving a lot of interest from researchers. The reason is associated with the huge amount and complexity of input data. In order to create a detailed planning, it is time consuming to manually decompose activities, collect and calculate the detailed information in relevant. Moreover, the coordination of detailed activities requires much effort for dealing with their complex constraints. This dissertation aims to support the generation of detailed schedules from a rough schedule. It proposes a model for automated detailing of 4D schedules by integrating BIM, simulation and Pareto-based optimization.}, subject = {Simulation}, language = {en} }