@unpublished{WittWudtke2005, author = {Witt, Karl Josef and Wudtke, Robert-Balthasar}, title = {Implementation and Improvement of Design and Authorisation Procedures for proposed Tailings Facilities}, doi = {10.25643/bauhaus-universitaet.796}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7964}, year = {2005}, abstract = {The report is part of the research project 'TAILSAFE'. The project is supported by the european union. Basics of design and investigation procedures are presented within the report. Furthermore possible applications of design and investigation procedures are evaluated concerning to a smooth work during all using phases of a tailings facility, that is the planning and execution. Finally recomendations are given to optimise the handling with significant standards.}, subject = {Bergeteich}, language = {en} } @inproceedings{Schoenberger2003, author = {Sch{\"o}nberger, Karsten}, title = {IuK bei der Steuerung von Instandsetzungsprozessen in der Immobilienwirtschaft : Projektplanung und Ressourceneinsatz}, doi = {10.25643/bauhaus-universitaet.362}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3628}, year = {2003}, abstract = {Die Situation in der Immobilienwirtschaft hat sich in den letzten Jahren grundlegend ver{\"a}ndert. Die Neubauaktivit{\"a}ten in ganz Deutschland sind deutlich zur{\"u}ckgegangen. Das Bauen im Bestand mit den T{\"a}tigkeitsfeldern der Renovierung, Modernisierung und Instandsetzung r{\"u}ckt daher in den Mittelpunkt der Aktivit{\"a}ten. Laut Bundesarbeitskreis Altbauerneuerungen werden im n{\"a}chsten Jahr 74 Prozent des gesamten Bauvolumens auf die Modernisierung von alten H{\"a}usern entfallen, der Anteil der Neubaumaßnahmen geht auf 26 Prozent zur{\"u}ck. Dies gilt nicht nur f{\"u}r Wohn-, sondern auch f{\"u}r Gewerbeimmobilien. Die anhaltende Rezession und die Entzauberung der New Economy ziehen in diesem Bereich Leerst{\"a}nde und fallende Mieten nach sich. Auch die Wohnungswirtschaft hat vor allem in den neuen L{\"a}ndern mit Leerst{\"a}nden zu k{\"a}mpfen. Diese Tatsache zwingt Immobilienbetreiber zunehmend dazu, Methoden zu ergreifen und Werkzeuge einzusetzen, die die Effizienz im eigenen Unternehmen steigern. Die Aufgabenstellung lautet: Mehr Sanierungsprojekte in der selben Zeit abwickeln. Dies setzt eine prozessorientierte Vorgehensweise und unterst{\"u}tzende Werkzeuge voraus. Mit dem baucommunicator wurde ein Werkzeug entwickelt, dass es dem Geb{\"a}udemanager erm{\"o}glicht, bei der Abwicklung von Bau- und Sanierungsmaßnahmen im Aufgabenfeld der Koordination dieser Aufgabenstellung zu entsprechen. Die Kernfunktionen der Software sind das Termin-, Kosten und Qualit{\"a}tsmanagement bei der Abwicklung von Bauprozessen. Die unternehmens{\"u}bergreifende Konzeption erlaubt sowohl dem Auftraggeber, wie auch den ausf{\"u}hrenden Betrieben den Zugriff auf die zentral abgelegten Projektinformationen. Die Workflow-Funktionalit{\"a}t des baucommunicator f{\"u}hrt zu einer Reduktion der Prozessaktivit{\"a}ten. Dadurch werden Kosten eingespart und die Ausf{\"u}hrungsqualit{\"a}t gesteigert.}, subject = {Immobilienwirtschaft}, language = {de} } @inproceedings{RueppelKlauer2003, author = {R{\"u}ppel, Uwe and Klauer, Thomas}, title = {Internetbasiertes Management von Bauprojekten auf der Basis eines dynamischen Workflow-Frameworks}, doi = {10.25643/bauhaus-universitaet.356}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-3561}, year = {2003}, abstract = {Die Baubranche zeichnet sich durch eine sehr starke Arbeitsteilung aus, die hohe Anspr{\"u}che an die Koordination der Prozesse und auch an die Qualit{\"a}t der auszutauschenden Informationen stellt. Trotz der gegenw{\"a}rtigen informationstechnologischen M{\"o}glichkeiten gibt es in der Bauwirtschaft noch keine umfassende L{\"o}sung, um diesen Anforderungen gerecht zu werden. Insbesondere sind Modelle zur durchg{\"a}ngigen Koordinierung der Prozesse und Arbeitsabl{\"a}ufe (Workflows) im Informations- und Kommunikationsverbund f{\"u}r die baupraktischen Belange noch nicht entwickelt worden. Die Abbildung der dynamischen Aspekte der Workflows zwischen Bauherren, Projektleitung, Fachplanern, Bauaufsichtsbeh{\"o}rde und Bauunternehmen k{\"o}nnen zu einer Erh{\"o}hung der Termin- und Kostensicherheit f{\"u}hren. Vorhandene Software-Produkte im Bereich des Workflow-Managements erf{\"u}llen die Anforderungen der vernetzt-kooperativen Planung bzw. Ausf{\"u}hrung im Bauwesen nicht durchg{\"a}ngig und sind nicht in einen internetbasierten Projektraum integrierbar. Die Grundlage des hier vorgestellten Systems bildet ein so genanntes Workflow-Framework, dem alle Fachinformationen, wie Kosten, Termine, Geb{\"a}udestruktur und (Plan-) Dokumente untergeordnet sind. Dieses Framework stellt eine auf die Anforderungen des Bauwesens ausgerichtete Anwendung dar, mit deren Hilfe die Beteiligten und deren Aktivit{\"a}ten, die Fachinformationen und die zu verwendenden Fachapplikationen koordiniert und {\"u}berwacht werden k{\"o}nnen. Mit dieser Anwendung, die in den internetbasierten Projektraum Baukom-Online integriert ist, kann zum einen die Projektleitung bzw. der Projektsteuerer bei der Koordination, Steuerung und {\"U}berwachung der Bauprojektabwicklung in technischer, rechtlicher und wirtschaftlicher Hinsicht unterst{\"u}tzt werden. Zum anderen erm{\"o}glicht es den Beteiligten in Planung, Genehmigung und Ausf{\"u}hrung, ihre Arbeitsabl{\"a}ufe im Hinblick auf eine fristgerechte und wirtschaftliche Abwicklung effizienter zu gestalten.}, subject = {Bauablauf / Ablaufplanung}, language = {de} } @inproceedings{MilesCenTaylor2004, author = {Miles, John and Cen, Mei and Taylor, Mark}, title = {Linking Sketching and Constraint Checking for Early Conceptual Design}, doi = {10.25643/bauhaus-universitaet.1548}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-1547}, year = {2004}, abstract = {At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients.}, subject = {Konzipieren }, language = {en} } @inproceedings{Lemcke2000, author = {Lemcke, Uwe}, title = {Baustellenmanagement-Konzept „Feste Warnowquerung Rostock"}, doi = {10.25643/bauhaus-universitaet.700}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7005}, year = {2000}, abstract = {In Erstanwendung des Fernstraßenbauprivatfinanzierungsgesetzes wurde der Konzession{\"a}r in einer fr{\"u}hen Projektphase noch vor der Planfeststellung beauftragt. Nur hierdurch war es m{\"o}glich, ein umfassendes, speziell auf die Technologie eines Ausf{\"u}hrungsbetriebes zugeschnittenes Baustellenmanagement-Konzept als Basis f{\"u}r die Planfeststellung zu erarbeiten. Vorstellung des Vorhabens, Baumanagement-Konzept: Grobbauablaufplanung, Baustelleneinrichtung, Arbeitskr{\"a}fteeinsatz, Bodenmanagement, Hauptbaustoffversorgung und Erdstofftransporte im {\"o}ffentlichen Bauraum, Verkehrsumleitungskonzeption f{\"u}r den {\"o}ffentlichen Verkehr entsprechend den Bauphasen.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{HanfFricke2002, author = {Hanf, Peter and Fricke, Ronald}, title = {Erfahrungen bei der Neubaustrecke K{\"o}ln-Rhein/Main aus Sicht der Arbeitsgemeinschaft Mittelstand}, doi = {10.25643/bauhaus-universitaet.715}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7156}, year = {2002}, abstract = {Die Verfasser schildern ihre Erfahrungen bei der Errichtung der Neubaustrecke K{\"o}ln-Rhein/Main aus Sicht einer Arbeitsgemeinschaft, der zehn Partnerfirmen aus der gesamten Bundesrepublik sowie eine Schweizer Firmengruppe angeh{\"o}rten: zur Strecke, Entwurf der Trasse, Streckenverlauf und zu erstellende Bauwerke, Allgemeines zum Vergabeverfahren, Angebotsbearbeitung, Aufbau der Arge Mittelstand, Erfahrungen aus der Durchf{\"u}hrung, Fazit}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Gartung2000, author = {Gartung, Thomas}, title = {Bew{\"a}hrte Projektsteuerung f{\"u}r ICE-Neubautrassen - Ingenieuraufgaben an der ICE-Strecke Erfurt - N{\"u}rnberg}, doi = {10.25643/bauhaus-universitaet.701}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7018}, year = {2000}, abstract = {Um die kompexen Randbedingungen des Eisenbahnbaus erf{\"u}llen zu k{\"o}nnen, hat die Planungsgesellschaft Bahnbau Deutsche Einheit (PBDE) neue Methoden f{\"u}r ein effizientes Management von Planung und Bau eingef{\"u}hrt, die in dem Beitrag vorgestellt werden.}, subject = {Baubetriebslehre}, language = {de} } @inproceedings{Duft2000, author = {Duft, Mathias}, title = {Zusammenwirken der am Prozess Beteiligten bei komplexen Projekten}, doi = {10.25643/bauhaus-universitaet.703}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20111215-7035}, year = {2000}, abstract = {Eine integrierte Gesamtplanung, ein konzentriertes Planungs- und Freigabesystem, ein konsequentes Baustellenmanagement sowie die Einbeziehung und B{\"u}ndelung des Know how und der Leistungsf{\"a}higkeit solventer Partner sind Grundlage f{\"u}r die Optimierung der Kommunikations- und Entscheidungswege f{\"u}r die systemgef{\"u}hrte Prozesslenkung. Das wird am Beispiel der Errichtung des Innerst{\"a}dtischen Einkaufszentrums Anger 1 belegt.}, subject = {Baubetriebslehre}, language = {de} }