@inproceedings{HuhntRichter, author = {Huhnt, Wolfgang and Richter, Sven}, title = {Modification Management for Planning and Construction Processes}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2851}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28510}, pages = {13}, abstract = {Planning and construction processes are characterized by the peculiarity that they need to be designed individually for each project. It is necessary to set up an individual schedule for each project. As a basis for a new project, schedules from already finished projects are used, but adaptions are always necessary. In practice, scheduling tools only document a process. Schedules cover a set of activities, their duration and a set of interdependencies between activities. The design of a process is up to the user. It is not necessary to specify each interdependency, and completeness and correctness need to be checked manually. No methodologies are available to guarantee properties such as correctness or completeness. The considerations presented in the paper are based on an approach where a planning and a construction process including the interdependencies between planning and construction activities are regarded as a result. Selected information need to be specified by a user, and a proposal for an order of planning and construction activities is computed. As a consequence, process properties such as correctness and completeness can be guaranteed with respect to user input. Especially in Germany, clients are allowed to modify their requirements at any time. This leads to modifications in the planning and construction processes. This paper covers a mathematical formulation for this problem based on set theory. A complex structure is set up covering objects and relations; and operations are defined that guarantee consistency in the underlying and versioned process description. The presented considerations are based on previous work. This paper can be regarded as the next step in a series of previous work describing how a suitable concept for handling, planning and construction processes in civil engineering can be formed.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{SharmakScherer, author = {Sharmak, Wael and Scherer, Raimar J.}, title = {ADAPTABLE PROJECT MANAGEMENT PLANS USING CHANGE TEMPLATES-BASED APPROACH}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2888}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28886}, pages = {14}, abstract = {The uncertainty existing in the construction industry is bigger than in other industries. Consequently, most construction projects do not go totally as planned. The project management plan needs therefore to be adapted repeatedly within the project lifecycle to suit the actual project conditions. Generally, the risks of change in the project management plan are difficult to be identified in advance, especially if these risks are caused by unexpected events such as human errors or changes in the client preferences. The knowledge acquired from different resources is essential to identify the probable deviations as well as to find proper solutions to the faced change risks. Hence, it is necessary to have a knowledge base that contains known solutions for the common exceptional cases that may cause changes in each construction domain. The ongoing research work presented in this paper uses the process modeling technique of Event-driven Process Chains to describe different patterns of structure changes in the schedule networks. This results in several so called "change templates". Under each template different types of change risk/ response pairs can be categorized and stored in a knowledge base. This knowledge base is described as an ontology model populated with reference construction process data. The implementation of the developed approach can be seen as an iterative scheduling cycle that will be repeated within the project lifecycle as new change risks surface. This can help to check the availability of ready solutions in the knowledge base for the situation at hand. Moreover, if the solution is adopted, CPSP, "Change Project Schedule Plan „a prototype developed for the purpose of this research work, will be used to make the needed structure changes of the schedule network automatically based on the change template. What-If scenarios can be implemented using the CPSP prototype in the planning phase to study the effect of specific situations without endangering the success of the project objectives. Hence, better designed and more maintainable project schedules can be achieved.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{ZeiserDahmenRohwedderetal., author = {Zeiser, Andreas and Dahmen, W. and Rohwedder, T. and Schneider, R.}, title = {ADAPTIVE EIGENVALUE COMPUTATION FOR ELLIPTIC OPERATORS}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2904}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-29042}, pages = {14}, abstract = {We present recent developments of adaptive wavelet solvers for elliptic eigenvalue problems. We describe the underlying abstract iteration scheme of the preconditioned perturbed iteration. We apply the iteration to a simple model problem in order to identify the main ideas which a numerical realization of the abstract scheme is based upon. This indicates how these concepts carry over to wavelet discretizations. Finally we present numerical results for the Poisson eigenvalue problem on an L-shaped domain.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{RueppelAbolghasemzadeh, author = {R{\"u}ppel, Uwe and Abolghasemzadeh, Puyan}, title = {BIM-BASED IMMERSIVE EVACUATION SIMULATIONS}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2884}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28845}, pages = {9}, abstract = {The changed global security situation in the last eight years has shown the importance of emergency management plans in public buildings. Therefore, the use of computer simulators for surveying fire safety design and evacuation process is increasing. The aim of these simulators is to have more realistic evacuation simulations. The challenge is, firstly, to realize the virtual simulation environment based on geometrical and material boundary conditions, secondly, to considerate the mutual interaction effects between different parameters and, finally, to have a realistic visualization of the simulated results. In order to carry out this task, an especial new software method on a BIM-platform has to be developed which can integrate all required simulations and will be able to have an immersive output BIM ISEE (Immersive Safety Engineering Environment). The new BIM-ISEE will integrate the Fire Dynamics Simulator (FDS) for fire and evacuation simulation in the Autodesk Revit which is a BIM-platform and will represent the simulation results in the immersive virtual environment at the institute (CES-Lab). With BIM-ISEE the fire safety engineer will be able to obtain more realistic visualizations in the immersive environment, to modify his concept more effectively, to evaluate the simulation results more accurately and to visualize the various simulation results. It can also give the rescue staff the opportunity to perform and evaluate emergency evacuation trainings.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{StackManzoorMenzeletal., author = {Stack, Paul and Manzoor, Farhan and Menzel, Karsten and Cahill, Brian}, title = {A SERVICE ORIENTED ARCHITECTURE FOR BUILDING PERFORMANCE MONITORING}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2893}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28935}, pages = {18}, abstract = {Information technology plays a key role in the everyday operation of buildings and campuses. Many proprietary technologies and methodologies can assist in effective Building Performance Monitoring (BPM) and efficient managing of building resources. The integration of related tools like energy simulator packages, facility, energy and building management systems, and enterprise resource planning systems is of benefit to BPM. However, the complexity to integrating such domain specific systems prevents their common usage. Service Oriented Architecture (SOA) has been deployed successfully in many large multinational companies to create integrated and flexible software systems, but so far this methodology has not been applied broadly to the field of BPM. This paper envisions that SOA provides an effective integration framework for BPM. Service oriented architecture for the ITOBO framework for sustainable and optimised building operation is proposed and an implementation for a building performance monitoring system is introduced.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{SmarslyHartmann, author = {Smarsly, Kay and Hartmann, Dietrich}, title = {REAL-TIME MONITORING OF WIND CONVERTERS BASED ON SOFTWARE AGENTS}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2891}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28916}, pages = {11}, abstract = {Due to increasing numbers of wind energy converters, the accurate assessment of the lifespan of their structural parts and the entire converter system is becoming more and more paramount. Lifespan-oriented design, inspections and remedial maintenance are challenging because of their complex dynamic behavior. Wind energy converters are subjected to stochastic turbulent wind loading causing corresponding stochastic structural response and vibrations associated with an extreme number of stress cycles (up to 109 according to the rotation of the blades). Currently, wind energy converters are constructed for a service life of about 20 years. However, this estimation is more or less made by rule of thumb and not backed by profound scientific analyses or accurate simulations. By contrast, modern structural health monitoring systems allow an improved identification of deteriorations and, thereupon, to drastically advance the lifespan assessment of wind energy converters. In particular, monitoring systems based on artificial intelligence techniques represent a promising approach towards cost-efficient and reliable real-time monitoring. Therefore, an innovative real-time structural health monitoring concept based on software agents is introduced in this contribution. For a short time, this concept is also turned into a real-world monitoring system developed in a DFG joint research project in the authors' institute at the Ruhr-University Bochum. In this paper, primarily the agent-based development, implementation and application of the monitoring system is addressed, focusing on the real-time monitoring tasks in the deserved detail.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{KhanCongKarstenetal., author = {Khan, Farhan Manzoor Ahmed and Cong, ZiXiang and Karsten, Menzel and Stack, Paul}, title = {TRACKING OCCUPANTS AND INVENTORY ITEMS IN BUILDINGS USING RADIO FREQUENCY IDENTIFICATION (RFID) TECHNOLOGY}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2856}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28562}, pages = {13}, abstract = {In order to make control decisions, Smart Buildings need to collect data from multiple sources and bring it to a central location, such as the Building Management System (BMS). This needs to be done in a timely and automated fashion. Besides data being gathered from different energy using elements, information of occupant behaviour is also important for a building's requirement analysis. In this paper, the parameter of Occupant Density was considered to help find behaviour of occupants towards a building space. Through this parameter, support for building energy consumption and requirements based on occupant need and demands was provided. The demonstrator presented provides information on the number of people present in a particular building space at any time, giving the space density. Such collections of density data made over a certain period of time represents occupant behaviour towards the building space, giving its usage patterns. Similarly, inventory items were tracked and monitored for moving out or being brought into a particular read zone. For both, people and inventory items, this was achieved using small, low-cost, passive Ultra-High Frequency (UHF) Radio Frequency Identification (RFID) tags. Occupants were given the tags in a form factor of a credit card to be possessed at all times. A central database was built where occupant and inventory information for a particular building space was maintained for monitoring and providing a central data access.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{BauerDudekRichter, author = {Bauer, Marek and Dudek, Mariusz and Richter, Matthias}, title = {RELIABILITY OF TRAM - NETWORK SECTION}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2828}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28281}, pages = {16}, abstract = {We investigate aspects of tram-network section reliability, which operates as a part of the model of whole city tram-network reliability. Here, one of the main points of interest is the character of the chronological development of the disturbances (namely the differences between time of departure provided in schedule and real time of departure) on subsequent sections during tram line operation. These developments were observed in comprehensive measurements done in Krakow, during one of the main transportation nodes (Rondo Mogilskie) rebuilding. All taken building activities cause big disturbances in tram lines operation with effects extended to neighboring sections. In a second part, the stochastic character of section running time will be analyzed more detailed. There will be taken into consideration sections with only one beginning stop and also with two or three beginning stops located at different streets at an intersection. Possibility of adding results from sections with two beginning stops to one set will be checked with suitable statistical tests which are used to compare the means of the two samples. Section running time may depend on the value of gap between two following trams and from the value of deviation from schedule. This dependence will be described by a multi regression formula. The main measurements were done in the city center of Krakow in two stages: before and after big changes in tramway infrastructure.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{FlaigApel, author = {Flaig, Thomas and Apel, Thomas}, title = {SIMULATION AND MATHEMATICAL OPTIMIZATION OF THE HYDRATION OF CONCRETE FOR AVOIDING THERMAL CRACKS}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2842}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28424}, pages = {15}, abstract = {After mixing of concrete, the hardening starts by an exothermic chemical reaction known as hydration. As the reaction rate depends on the temperature the time in the description of the hydration is replaced by the maturity which is defined as an integral over a certain function depending on the temperature. The temperature distribution is governed by the heat equation with a right hand side depending on the maturity and the temperature itself. We compare of the performance of different time integration schemes of higher order with an automatic time step control. The simulation of the heat distribution is of importance as the development of mechanical properties is driven by the hydration. During this process it is possible that the tensile stresses exceed the tensile strength and cracks occur. The goal is to produce cheap concrete without cracks. Simple crack-criterions use only temperature differences, more involved ones are based on thermal stresses. If the criterion predicts cracks some changes in the input data are needed. This can be interpreted as optimization. The final goal will be to adopt model based optimization (in contrast to simulation based optimization) to the problem of the hydration of young concrete and the avoidance of cracks. The first step is the simulation of the hydration, which we focus in this paper.}, subject = {Angewandte Informatik}, language = {en} } @inproceedings{DeSchepperBrackxSommen, author = {De Schepper, Nele and Brackx, Fred and Sommen, Frank}, title = {THE FOURIER-BESSEL TRANSFORM}, editor = {G{\"u}rlebeck, Klaus and K{\"o}nke, Carsten}, organization = {Bauhaus-Universit{\"a}t Weimar}, issn = {1611-4086}, doi = {10.25643/bauhaus-universitaet.2838}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28387}, pages = {18}, abstract = {In this paper we devise a new multi-dimensional integral transform within the Clifford analysis setting, the so-called Fourier-Bessel transform. It appears that in the two-dimensional case, it coincides with the Clifford-Fourier and cylindrical Fourier transforms introduced earlier. We show that this new integral transform satisfies operational formulae which are similar to those of the classical tensorial Fourier transform. Moreover the L2-basis elements consisting of generalized Clifford-Hermite functions appear to be eigenfunctions of the Fourier-Bessel transform.}, subject = {Angewandte Informatik}, language = {en} }