TY - JOUR A1 - Kaklauskas, Gintaris A1 - Cervenka, Vladimir A1 - Cervenka, Jan T1 - Deflection Calculation of RC Beams: Finite Element Software versus Design Code Methods N2 - The paper investigates accuracy of deflection predictions made by the finite element package ATENA and design code methods ACI and EC2. Deflections have been calculated for a large number of experimental reinforced concrete beams reported by three investigators. Statistical parameters have been established for each of the technique at different load levels, separately for the beams with small and moderate reinforcement ratio. KW - Finite-Elemente-Methode KW - Physikalisches Verfahren KW - Balken Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2498 ER - TY - JOUR A1 - Minch, M. J. A1 - Trochanowski, A. T1 - The numerical Modelling and Analysis of RC cracked Structures N2 - The purpose of this paper is to review model for finite element techniques for non-linear crack analysis of reinforced concrete beams and slabs. The non-linear behaviour of concrete and steel were described. Some calculations of >self-stress< for concrete and reinforced concrete beam was made. Current computational aspects are discussed. Several remarks for future studies are also given. The numerical model of the concrete and reinforced concrete was described. The paper shows the results of calculations on a reinforced concrete plane stress panel with cracks. The non-linear, numerical model of calculations of reinforced concrete was assumed. Using finite elements method some calculations were made. The results of calculations like displacements, stresses and cracking are shown on diagrams. They were compared with experimental results and other finding. Some conclusions about the described model and results of calculation are shown. KW - Tragwerk KW - Stahlbeton KW - Rissbildung KW - Modellierung Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5278 ER - TY - JOUR A1 - Dudek, Mariusz T1 - Zur Bewertung der Struktur von Verkehrsnetzen N2 - In diese Veröffentlichung werden die Kennziffern dargestellt, die zur Beurteilung der Struktur von Verkehrsnetzen behilflich sein können. Zu diesem Zweck wurde die Graphentheorie angewendet. Eine erste Gruppe von Bewertungen stützt sich auf die Anzahl der Knoten und Bögen des Netzes. Detailliertere Informationen über Engpässe oder Schwachstellen im Verkehrsnetz erhält man durch die Analyse der Kantenzusammenhangs. Die Unabhängigkeit der einzelnen Verkehrsarten , ihre Bewertung und Maßnahmen, sie zu verbessern werden vorgeschlagen und diskutiert. Weiteren Untersuchungen werden angeregt. KW - Verkehrsnetz KW - Kennzahl KW - Bewertung KW - Graphentheorie Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-4634 ER - TY - JOUR A1 - Katranuschkov, Peter A1 - Gehre, Alexander A1 - Scherer, Raimar J. T1 - User Requirements Capture in Distributed Project Environments: A Process-centred Approach N2 - Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives. KW - Informationstechnik KW - Forschung KW - Europa KW - Bedarfsforschung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2029 ER - TY - JOUR A1 - Ma, Zhiliang A1 - Qin, Liang T1 - A Framework of Management Information System for Construction Projects N2 - A comprehensive framework of information management system for construction projects in China has been established through extensive literature survey and field investigation. It utilizes the potential information technologies and covers the practical management patterns as well as the major aspects of construction project management. It can be used to guide and evaluate the design of the information management systems for construction projects in order to make the system to be applicable to a wide variety of construction projects and survive the changes in project management. KW - Mehragentensystem KW - Lernendes System KW - Managementinformationssystem Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2126 ER - TY - JOUR A1 - Êirinhevsky, V. V. A1 - Dîkhnyak, B. M. A1 - Êirichevsky, R. V. A1 - Êîzub, Y. G. T1 - Determination of the Temperature of Dissipative Warming and Parameters of Fracture in Elastomers with using of Singular Finite Elements N2 - For modeling of singular fields of stresses and deformations in elasters with a crack is offered to use of three-dimesional a special finite element. Weak compessible of elasters is taken into account on the basis of threefold approximation of fields of displacements, deformations and function of volume change. At intensive cyclic loading of the elastomer constructions with a crack it is necessary to take into account warming and large deformations at the crack top. The stress-deformed state elasters with a crack is determined from the decision of a nonlinear problem by a modified method Newton-Kantorovich. Account stress intensity factors for a rectangular plate with a various arrangement of a through crack is executed. Process of development of a surface crack and dissipative warming in prismatic a element of shift is investigated. KW - Elastomer KW - Temperatur KW - Finite-Elemente-Methode Y1 - 1997 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-5471 ER - TY - JOUR A1 - Kang, Shihchung A1 - Miranda, Eduardo T1 - Automated Simulation of the Erection Activities in Virtual Construction N2 - The goal of the research is the development of a computer system to plan, simulate and visualize erection processes in construction. In the research construction cranes are treated as robots with predefined degrees of freedom and crane-specific motion planning techniques are developed to generate time-optimized and collision-free paths for each piece to be erected in the project. Using inverse kinematics and structural dynamics simulation, the computer system then computes the crane motions and velocities necessary to achieve the previously calculated paths. The main benefits of the research are the accurate planning and scheduling of crane operations leading to optimization of crane usage and project schedules, as well as improving overall crane safety in the project. This research is aimed at the development of systems that will allow computer-assisted erection of civil infrastructure and ultimately to achieve fully-automated erection processes using robotic cranes... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Baukonstruktion KW - Virtuelle Realität Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2310 ER - TY - JOUR A1 - Neuberg, Frank A1 - Fank, Ernst A1 - Ekkerlein, Christian T1 - Integrated Life Cycle Simulation and Assessment of Buildings N2 - Buildings require both for construction and, due to their comparatively long life cycle for maintenance, significant raw material and energy resources. So far available knowledge about resource consumption during an entire life cycle of a building is still quite rare, because various criteria affect each other and/or overlay mutually. In this contribution a model based software concept is presented using an integrated approach for life cycle simulation and assessment of buildings. The essential point of the development consists of connecting an IFC compliant product model of a building via the Internet with data bases for the resource and energy requirement of building materials. Furthermore, numerical simulations allow calculating and minimizing the energy consumption, the resource requirement, the waste streams and also the noxious emissions. In the context of this paper we present the first release of software programs for architects and engineers, which help them to evaluate their design decisions objectively in early planning steps. Additionally the usage of the software is demonstrated by a test case study for a real world building. By applying this software in practice a substantial contribution for saving energy and natural resources can be provided in the sense of sustainable and ecological building design. KW - Produktmodell KW - Simulation KW - Bautechnik KW - Lebenszyklus Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2351 ER - TY - JOUR A1 - Semenov, Vitaly A1 - Alekseeva, Elena A1 - Tarlapan, Oleg T1 - Virtual Construction using Map-based Approach N2 - The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Virtuelle Realität KW - Bauwerk Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2447 ER - TY - JOUR A1 - Kiviniemi, Arto A1 - Fischer, Martin T1 - Requirements Management Interface to Building Product Models N2 - In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process... KW - Produktmodell KW - Simulation KW - Bautechnik KW - Bauwerk KW - Modellierung Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:gbv:wim2-20111215-2427 ER -