@unpublished{AbbasKavrakovMorgenthaletal., author = {Abbas, Tajammal and Kavrakov, Igor and Morgenthal, Guido and Lahmer, Tom}, title = {Prediction of aeroelastic response of bridge decks using artificial neural networks}, doi = {10.25643/bauhaus-universitaet.4097}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20200225-40974}, abstract = {The assessment of wind-induced vibrations is considered vital for the design of long-span bridges. The aim of this research is to develop a methodological framework for robust and efficient prediction strategies for complex aerodynamic phenomena using hybrid models that employ numerical analyses as well as meta-models. Here, an approach to predict motion-induced aerodynamic forces is developed using artificial neural network (ANN). The ANN is implemented in the classical formulation and trained with a comprehensive dataset which is obtained from computational fluid dynamics forced vibration simulations. The input to the ANN is the response time histories of a bridge section, whereas the output is the motion-induced forces. The developed ANN has been tested for training and test data of different cross section geometries which provide promising predictions. The prediction is also performed for an ambient response input with multiple frequencies. Moreover, the trained ANN for aerodynamic forcing is coupled with the structural model to perform fully-coupled fluid--structure interaction analysis to determine the aeroelastic instability limit. The sensitivity of the ANN parameters to the model prediction quality and the efficiency has also been highlighted. The proposed methodology has wide application in the analysis and design of long-span bridges.}, subject = {Aerodynamik}, language = {en} } @phdthesis{Abeltshauser, author = {Abeltshauser, Rainer}, title = {Identification and separation of physical effects of coupled systems by using defined model abstractions}, doi = {10.25643/bauhaus-universitaet.2860}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20170314-28600}, school = {Bauhaus-Universit{\"a}t Weimar}, abstract = {The thesis investigates at the computer aided simulation process for operational vibration analysis of complex coupled systems. As part of the internal methods project "Absolute Values" of the BMW Group, the thesis deals with the analysis of the structural dynamic interactions and excitation interactions. The overarching aim of the methods project is to predict the operational vibrations of engines. Simulations are usually used to analyze technical aspects (e. g. operational vibrations, strength, ...) of single components in the industrial development. The boundary conditions of submodels are mostly based on experiences. So the interactions with neighboring components and systems are neglected. To get physically more realistic results but still efficient simulations, this work wants to support the engineer during the preprocessing phase by useful criteria. At first suitable abstraction levels based on the existing literature are defined to identify structural dynamic interactions and excitation interactions of coupled systems. So it is possible to separate different effects of the coupled subsystems. On this basis, criteria are derived to assess the influence of interactions between the considered systems. These criteria can be used during the preprocessing phase and help the engineer to build up efficient models with respect to the interactions with neighboring systems. The method was developed by using several models with different complexity levels. Furthermore, the method is proved for the application in the industrial environment by using the example of a current combustion engine.}, subject = {Strukturdynamik}, language = {en} } @phdthesis{Achenbach, author = {Achenbach, Marcus}, title = {Weiterentwicklung der Zonenmethode f{\"u}r den Nachweis der Feuerwiderstandsdauer von rechteckigen Stahlbetondruckgliedern}, publisher = {Bauhaus-Universit{\"a}tsverlag}, address = {Weimar}, isbn = {978-3-95773-264-4}, doi = {10.25643/bauhaus-universitaet.3848}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20190119-38484}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {174}, abstract = {Die Zonenmethode nach Hertz ist ein vereinfachtes Verfahren zur Heißbemessung von Stahlbetonbauteilen. Um eine h{\"a}ndische Bemessung zu erm{\"o}glichen, werden daher verschiedene Annahmen und Vereinfachungen getroffen. Insbesondere werden die thermischen Dehnungen vernachl{\"a}ssigt und das mechanische Verhalten durch einen verkleinerten Querschnitt mit konstanten Stoffeigenschaften beschrieben. Ziel der vorliegenden Arbeit ist, dieses vereinfachte Verfahren in ein nichtlineares Verfahren zur Heißbemessung von Stahlbetondruckgliedern bei Brandbeanspruchung durch die Einheits-Temperaturzeitkurve zu {\"u}berf{\"u}hren. Dazu werden die wesentlichen Annahmen der Zonenmethode {\"u}berpr{\"u}ft und ein Vorschlag zur Weiterentwicklung vorgestellt. Dieser beruht im Wesentlichen auf der Modellierung der druckbeanspruchten Bewehrung. Diese weiterentwickelte Zonenmethode wird durch die Nachrechnung von Laborversuchen validiert und das Sicherheitsniveau durch eine vollprobabilistische Analyse und den Vergleich mit dem allgemeinen Verfahren bestimmt.}, subject = {Bautechnik}, language = {de} } @phdthesis{Ailland, author = {Ailland, Karin}, title = {Ereignisbasierte Abbildung von Bau-Ist-Zust{\"a}nden}, publisher = {Verlag der Bauhaus-Universit{\"a}t Weimar}, address = {Weimar}, isbn = {978-3-86068-508-2}, doi = {10.25643/bauhaus-universitaet.2065}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20131029-20651}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {220}, abstract = {Der Komplexit{\"a}t einer großen Baumaßnahme steht meist ein relativ unpr{\"a}zises Termincontrolling gegen{\"u}ber. Die Gr{\"u}nde daf{\"u}r liegen in unzureichenden Baufortschrittsinformationen und der Schwierigkeit, eine geeignete Steuerungsmaßnahme auszuw{\"a}hlen. In der Folge kommt es h{\"a}ufig zu Terminverz{\"u}gen und Mehrkosten. Ziel der Arbeit war es, die realen Bau-Ist-Zust{\"a}nde eines Bauprojektes so genau zu erfassen, dass es m{\"o}glich wird, t{\"a}glich ein zutreffendes Abbild des Baufortschrittes und der Randbedingungen des Bauablaufes zu schaffen und mit Hilfe eines Simulationswerkzeuges nachzubilden. Zu diesem Zweck sollte ein Erfassungskonzept ausgearbeitet werden, mit dessen Hilfe unter Verwendung von Erfassungstechniken aussagekr{\"a}ftige sowie belastbare Daten zu einer auf die Anforderungen der Simulation abgestimmten Datenbasis zusammengef{\"u}hrt werden. Um der Zielstellung gerecht zu werden, wurde anhand eines Beispiels ein Prozessmodell aufgebaut und definiert, welche Informationen zum Aufbau eines Simulationsmodells, das die reaktive Ablaufplanung unterst{\"u}tzt, erfasst werden m{\"u}ssen. Die einzelnen Prozessgr{\"o}ßen wurden detailliert beschrieben und die Erfassungsgr{\"o}ßen daraus abgeleitet. Weiterhin wurden Aussagen zur Prozessstrukturierung erarbeitet. Somit wurden Informationsst{\"u}tzstellen definiert. Es wurden Methoden zur Erfassung des Bau-Ist-Zustandes hinsichtlich ihrer Eignung sowie Anwendungsm{\"o}glichkeiten analysiert und ausgew{\"a}hlte Anwendungsbeispiele f{\"u}r RFID, Barcodes und Bautageb{\"u}cher dargestellt. Außerdem wurde betrachtet, welche Daten der baustelleneigenen Bauablaufdokumentation zur Belegung der Informationsst{\"u}tzstellen genutzt werden k{\"o}nnen. Diese Betrachtung stellte Dokumente in den Fokus, welche aufgrund von Vorschriften oder Vertragsbedingungen ohnehin auf Baustellen erfasst werden m{\"u}ssen. Schließlich wurden die vorangegangenen Betrachtungen hinsichtlich der Erfassungsgr{\"o}ßen und der Erfassungsmethoden in einem Erfassungskonzept zusammengef{\"u}hrt und eine geeignete Kombination von Erfassungsmethoden entwickelt. Der Baufortschritt soll anhand der Beschreibung, welchen Status die einzelnen Vorg{\"a}nge angenommen haben, mit Hilfe eines digitalen Bautagebuchs erfasst werden. Die Randbedingungen, wie die Verf{\"u}gbarkeit von Personal-, Material- und Ger{\"a}teressourcen, werden mit Hilfe von RFID-Tags identifiziert, auf denen alle weiteren ben{\"o}tigten Informationen hinterlegt sind. Informationen {\"u}ber Ressourcen, welche geplante Termine wiedergeben, m{\"u}ssen ebenfalls im digitalen Bautagebuch hinterlegt und aktuell gehalten werden. Traditionelle Lieferscheine in Papierform m{\"u}ssen durch digitale Lieferscheine ersetzt werden. Abgeschlossen wurde die Ausarbeitung des Erfassungskonzeptes durch Ans{\"a}tze, mit deren Hilfe der Erfassungsaufwand reduziert werden kann. Zu diesem Zweck wurde eine hierarchische Ordnung des Erfassungskonzeptes eingef{\"u}hrt. Im Ergebnis ist somit ein Erfassungskonzept entstanden, mit dessen Hilfe die realen Bau-Ist-Zust{\"a}nde einer Baumaßnahme so genau erfasst werden k{\"o}nnen, dass t{\"a}glich ein zutreffendes Abbild des Baufortschrittes und der Randbedingungen des Bauablaufes in einer Simulations¬umgebung generiert werden kann. Die Erfassungskonzeption liefert eine Datenbasis, die auf die Anforderungen der Simulation abgestimmt ist.}, subject = {Simulation}, language = {de} } @periodical{AinioBartetzkyGyőrffyetal., author = {Ainio, Anna and Bartetzky, Arnold and Győrffy, Rachel and Islam, Naslima and Khvadagiani, Irakli and Kibel, Jochen and Landau-Donnelly, Friederike and Leko, Kristina and Lenz, Patricia and Onuoha, Nnenna and Rathjen, Lukas and Reinsch, Natalie and Rykov, Anatol and Tajeri, Niloufar and Ullmanov{\´a}, Kl{\´a}ra}, title = {Censored? Conflicted Concepts of Cultural Heritage}, editor = {Din{\c{c}}{\c{c}}ağ Kahveci, Ay{\c{s}}eg{\"u}l and Hajdu, Marcell and H{\"o}hne, Wolfram and Jesse, Darja and Karpf, Michael and Torres Ruiz, Marta}, publisher = {Bauhaus-Universit{\"a}tsverlag}, address = {Weimar}, isbn = {978-3-95773-304-7}, doi = {10.25643/bauhaus-universitaet.4927}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20230213-49276}, pages = {181}, abstract = {Those who ask how social entities relate to the past, enter a field defined by competing interpretations and contested practices of a collectively shared heritage. Dissent and conflict among heritage communities represent productive moments in the negotiation of these varying constructs of the past, identities, and heritage. At the same time, they lead to omissions, the overwriting and amendment of existing constructs. A closer look at all that is suppressed, excluded or rejected opens up new perspectives: It reveals how social groups are formed through public disputes upon the material foundations of heritage constructs. Taking the concept of censorship, the volume engages with the exclusionary and inclusionary mechanisms that underlie the construction of heritage and thus social identities. Censorship is understood here as a discursive strategy in public debates. In current debates, allegations of censorship surface primarily in cases where the handling of a certain heritage constructs is subjected to critical evaluation, or on the contrary, needs to be protected from criticism or even destruction. The authors trace the connection between heritage and identity and show that identity constructs are not only manifested within heritage but are actively negotiated through it.}, subject = {Kulturerbe}, language = {en} } @misc{Alabassy, type = {Master Thesis}, author = {Alabassy, Mohamed Said Helmy}, title = {Automated Approach for Building Information Modelling of Crack Damages via Image Segmentation and Image-based 3D Reconstruction}, doi = {10.25643/bauhaus-universitaet.6416}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20230818-64162}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {101}, abstract = {As machine vision-based inspection methods in the field of Structural Health Monitoring (SHM) continue to advance, the need for integrating resulting inspection and maintenance data into a centralised building information model for structures notably grows. Consequently, the modelling of found damages based on those images in a streamlined automated manner becomes increasingly important, not just for saving time and money spent on updating the model to include the latest information gathered through each inspection, but also to easily visualise them, provide all stakeholders involved with a comprehensive digital representation containing all the necessary information to fully understand the structure's current condition, keep track of any progressing deterioration, estimate the reduced load bearing capacity of the damaged element in the model or simulate the propagation of cracks to make well-informed decisions interactively and facilitate maintenance actions that optimally extend the service life of the structure. Though significant progress has been recently made in information modelling of damages, the current devised methods for the geometrical modelling approach are cumbersome and time consuming to implement in a full-scale model. For crack damages, an approach for a feasible automated image-based modelling is proposed utilising neural networks, classical computer vision and computational geometry techniques with the aim of creating valid shapes to be introduced into the information model, including related semantic properties and attributes from inspection data (e.g., width, depth, length, date, etc.). The creation of such models opens the door for further possible uses ranging from more accurate structural analysis possibilities to simulation of damage propagation in model elements, estimating deterioration rates and allows for better documentation, data sharing, and realistic visualisation of damages in a 3D model.}, subject = {Building Information Modeling}, language = {en} } @article{AlaladeReichertKoehnetal., author = {Alalade, Muyiwa and Reichert, Ina and K{\"o}hn, Daniel and Wuttke, Frank and Lahmer, Tom}, title = {A Cyclic Multi-Stage Implementation of the Full-Waveform Inversion for the Identification of Anomalies in Dams}, series = {Infrastructures}, volume = {2022}, journal = {Infrastructures}, number = {Volume 7, issue 12, article 161}, editor = {Qu, Chunxu and Gao, Chunxu and Zhang, Rui and Jia, Ziguang and Li, Jiaxiang}, publisher = {MDPI}, address = {Basel}, doi = {10.3390/infrastructures7120161}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20221201-48396}, pages = {19}, abstract = {For the safe and efficient operation of dams, frequent monitoring and maintenance are required. These are usually expensive, time consuming, and cumbersome. To alleviate these issues, we propose applying a wave-based scheme for the location and quantification of damages in dams. To obtain high-resolution "interpretable" images of the damaged regions, we drew inspiration from non-linear full-multigrid methods for inverse problems and applied a new cyclic multi-stage full-waveform inversion (FWI) scheme. Our approach is less susceptible to the stability issues faced by the standard FWI scheme when dealing with ill-posed problems. In this paper, we first selected an optimal acquisition setup and then applied synthetic data to demonstrate the capability of our approach in identifying a series of anomalies in dams by a mixture of reflection and transmission tomography. The results had sufficient robustness, showing the prospects of application in the field of non-destructive testing of dams.}, subject = {Damm}, language = {en} } @phdthesis{Alexander, author = {Alexander, Anne}, title = {Quantitative Erfassung von Risiken und Simulation ihrer Auswirkungen auf den Verlauf eines Bauprojektes}, doi = {10.25643/bauhaus-universitaet.2051}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20130927-20514}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {171}, abstract = {Das Bauwesen hat sich in den letzten Jahren durch die Globalisierung des Marktes verbunden mit einer verst{\"a}rkten Nutzung moderner Technologien stark gewandelt. Die Planung und die Durchf{\"u}hrung von Bauvorhaben werden zunehmend komplexer und sind mit erh{\"o}hten Risiken verbunden. Geld- und Zeitressourcen werden bei einem immer h{\"a}rter werdenden Konkurrenzkampf knapper. Das Projektmanagement stellt L{\"o}sungsans{\"a}tze bereit, um Bauvorhaben auch unter erschwerten Bedingungen und erh{\"o}hten Risiken erfolgreich zum Abschluss zu bringen. Dabei hat ein systematisches Risikomanagement beginnend bei der Projektentwicklung bis zum Projektabschluss eine f{\"u}r den Projekterfolg entscheidende Bedeutung. Ziel der Arbeit ist es, eine quantitative Risikoerfassung f{\"u}r Projektmanager als professionelle Bauherrenvertretung und die Simulation der Risikoauswirkungen auf den Verlauf eines Projektes w{\"a}hrend der Planungs- und Bauphase zu erm{\"o}glichen. Mit Hilfe eines abstrakten Modells soll eine differenzierte, praxisnahe Simulation durchf{\"u}hrbar sein, die die verschiedenen Arten der Leistungs- und Kostenentstehung widerspiegelt. Parallel dazu soll die Beschreibung von Risiken so abstrahiert werden, dass beliebige Risiken quantitativ erfassbar und anschließend ihre Auswirkungen inklusive m{\"o}gliche Gegenmaßnahmen in das Modell integrierbar sind. Anhand zweier Beispiele werden die unterschiedlichen Einsatzm{\"o}glichkeiten der quantitativen Erfassung von Projektrisiken und der anschließenden Simulation ihrer Auswirkungen aufgezeigt. Bei dem ersten Beispiel, einem realen, bereits abgeschlossenen Schieneninfrastrukturprojekt, wird die Wirksamkeit einer vorbeugenden Maßnahme gegen ein Projektrisiko untersucht. Im zweiten Beispiel wird ein Planspielansatz zur praxisnahen Aus- und Weiterbildung von Projektmanagern entwickelt. Inhalt des Planspiels ist die Planung und Errichtung eines privatfinanzierten, {\"o}ffentlichen Repr{\"a}sentationsbaus mit teilweiser Fremdnutzung.}, subject = {Risiko}, language = {de} } @inproceedings{AlfenKiesewetterSchwancketal., author = {Alfen, Hans Wilhelm and Kiesewetter, Frank and Schwanck, Anke and Frank, Michael and Fischer, Katrin and Faust, Helmut and Littwin, Frank and B{\"o}de, Klaus}, title = {Workshop "PPP - Eignung und Vorgehensweise bei Hochschulprojekten"}, editor = {Alfen, Hans Wilhelm}, organization = {Bauhaus-Universit{\"a}t Weimar, Professur Betriebswirtschaftslehre im Bauwesen}, doi = {10.25643/bauhaus-universitaet.1999}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20130805-19996}, pages = {1 -- 90}, abstract = {Am 4. Oktober 2007 fand im Rahmen des Forschungsprojektes „Lebenszyklusorientiertes Management {\"o}ffentlicher Liegenschaften am Beispiel von Hochschulen und Wissenschaftseinrichtungen" in Weimar der Workshop „PPP-Eignung und Vorgehensweise bei Hochschulprojekten" mit {\"u}ber 60 Vertretern von Hochschulen, Studentenwerken, Ministerien, PPP Task Forces und Liegenschaftsbetrieben der L{\"a}nder statt. Im Beitrag erfolgt die Zusammenstellung der Pr{\"a}sentationen der Referenten.}, subject = {Public Private Partnership}, language = {de} } @phdthesis{Alkam, author = {Alkam, Feras}, title = {Vibration-based Monitoring of Concrete Catenary Poles using Bayesian Inference}, volume = {2021}, publisher = {Bauhaus-Universit{\"a}tsverlag}, address = {Weimar}, doi = {10.25643/bauhaus-universitaet.4433}, url = {http://nbn-resolving.de/urn:nbn:de:gbv:wim2-20210526-44338}, school = {Bauhaus-Universit{\"a}t Weimar}, pages = {177}, abstract = {This work presents a robust status monitoring approach for detecting damage in cantilever structures based on logistic functions. Also, a stochastic damage identification approach based on changes of eigenfrequencies is proposed. The proposed algorithms are verified using catenary poles of electrified railways track. The proposed damage features overcome the limitation of frequency-based damage identification methods available in the literature, which are valid to detect damage in structures to Level 1 only. Changes in eigenfrequencies of cantilever structures are enough to identify possible local damage at Level 3, i.e., to cover damage detection, localization, and quantification. The proposed algorithms identified the damage with relatively small errors, even at a high noise level.}, subject = {Parameteridentifikation}, language = {en} }